Home / Browse projects / Kolhapur, Maharashtra / REVANTA
REVANTA
By SIDDHESH PADMAMBA BUILDERS & DEVELOPERS
RG-MH-26743 · RERA P53000014790 · Last updated on MahaRERA portal: 2 Nov 2023
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
REVANTA is a Residential / Group Housing project by SIDDHESH PADMAMBA BUILDERS & DEVELOPERS in Kolhapur, Maharashtra, registered with MahaRERA as P53000014790 on 2 Jan 2018. The registration is recorded completed; possession was promised by 30 Dec 2024.
At a glance
Project
- NameREVANTA
- TypeResidential / Group Housing
- Location
- Rajaram Rifles
- Mali colony Takala
- Kolhapur (M Corp.)
- Karvir
- Kolhapur
- 416008
- Pincode416008
- MapView location on Google Maps (as filed on RERA)
- RERA no.P53000014790
- ReraGenie IDRG-MH-26743
Builder
- NameSIDDHESH PADMAMBA BUILDERS & DEVELOPERS
- Entity typePartnership
- PartnersVilas Rajaram Redekar, Savita Amar Upadhey, Prathamesh Sudhir Chavan, Sudhir Anandrao Chavan, Bhakti Sudhir Chavan, Shivkumar Sudesh Chavan, Sudesh Anandrao Chavan
- Other registrations1 more →
- Completed2 of 2
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on2 Jan 2018
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed106 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| REVANTA WING B | NA | 7 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 2 Nov 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
REVANTA WING B: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 2 Nov 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed29
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Amar Bhavnendra Upadhye |
| Architect | Mr Rahul Dattatray Durgule |
| Engineer | Pranav Ashok Kulkarni |
| Engineer | Sanjay D More |
| Chartered Accountant | Dadasaheb B Pednekar |
| Partner | Role in project |
|---|---|
| SIDDHESH PADMAMBA BUILDERS & DEVELOPERS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Dec 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Dec 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 20 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Jul 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 8 Nov 2022
Documents filed106
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 106 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Status of ConveyanceFile: B-302 C Deshpande.pdf | 2 Nov 2023 |
| Status of ConveyanceFile: B-401 Pritesh Doshi.pdf | 2 Nov 2023 |
| Status of ConveyanceFile: B-501 Sandip Doshi.pdf | 2 Nov 2023 |
| Status of ConveyanceFile: B - 101 Pratap Tendulkar.pdf | 11 Oct 2023 |
| Status of ConveyanceFile: B - 102 Anand Patil.pdf | 11 Oct 2023 |
| Status of ConveyanceFile: B - 201 Rachana Redekar.pdf | 11 Oct 2023 |
| Status of ConveyanceFile: B - 202 Dattatray Desai.pdf | 11 Oct 2023 |
| Status of ConveyanceFile: B - 502 Milind Kitwadkar.pdf | 11 Oct 2023 |
| Status of ConveyanceFile: B - 601 A Savita Upadhye.pdf | 11 Oct 2023 |
| Status of ConveyanceFile: B - 601 Priyanaka Kshirsagar.pdf | 11 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Audit Report B wing.pdf | 21 Jul 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Deed of declaration_compressed_compressed_compressed-compressed (1)_compressed_compressed- | 3 Jul 2023 |
| Status of ConveyanceFile: Deed of declaration_compressed_compressed_compressed-compressed (1)_compressed_compressed- | 3 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: quality assurance B wing 22 23.pdf | 22 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: B wing sold inventory.pdf | 22 Jun 2023 |
| Proforma of Agreement for saleFile: Flat Agreement Sample Format.pdf | 24 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A B Wing 2021-2022.pdf | 21 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Audit Report B wing.pdf | 19 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer cer B wing_.pdf | 9 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate B wing.pdf | 8 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure B Wing.pdf | 8 Nov 2022 |
| Certificates of CA (Form 3)File: Ca Certificate B wing.pdf | 8 Nov 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion letter.pdf | 8 Nov 2022 |
| Architect’s Certificate on Completion of Project (Form 4)File: Coplition Cert B wing.pdf | 8 Nov 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch Cer B wing.pdf | 22 Jul 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Cer B wing.pdf | 22 Jul 2022 |
| Form 2AFile: quality assurance B wing.pdf | 22 Jul 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure B wing.pdf | 22 Jul 2022 |
| Certificates of CA (Form 3)File: CA cert B wing-compressed.pdf | 22 Jul 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Audit Report B wing.pdf | 13 Jun 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Wing-B.pdf | 29 Apr 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate-B wing.pdf | 29 Apr 2022 |
| Form 2AFile: Quality Assurance-B wing.pdf | 29 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: B Wing-Disclosure.pdf | 29 Apr 2022 |
| Certificates of CA (Form 3)File: CA Certificate B Wing.pdf | 29 Apr 2022 |
| Building plan approvalFile: Revanta B wing 1.pdf | 20 Jan 2022 |
| Building plan approvalFile: Revanta B wing 2.pdf | 20 Jan 2022 |
| Building Plan Approval (IOD)File: Revanta B wing 1.pdf | 20 Jan 2022 |
| Building Plan Approval (IOD)File: Revanta B wing 2.pdf | 20 Jan 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect's Certificate B.pdf | 15 Jan 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engieers Certi B.pdf | 15 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Discolsure B.pdf | 15 Jan 2022 |
| Certificates of CA (Form 3)File: CA Certificate B compressed.pdf | 15 Jan 2022 |
| Disclosure of sold/ booked inventoryFile: Scan copy - Discolsure B wing.pdf | 20 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch certificate B-wing.pdf | 8 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer certificate B-wing.pdf | 8 Oct 2021 |
| Form 2AFile: quality assurance B-wing.pdf | 8 Oct 2021 |
| Certificates of CA (Form 3)File: CA Certificate B wing_compressed.pdf | 8 Oct 2021 |
| Building plan approvalFile: HPSC1383_compressed.pdf | 14 Aug 2021 |
| Building Plan Approval (IOD)File: HPSC1383_compressed.pdf | 14 Aug 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: B wing arch.pdf | 14 Aug 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Plot No-2 b.pdf | 14 Aug 2021 |
| Certificates of CA (Form 3)File: CA Certificate B-wing.pdf | 14 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 18-19.pdf | 11 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 1-merged (1).pdf | 11 Aug 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 1-merged (1).pdf | 11 Aug 2021 |
| Building plan approvalFile: Bwing 2nd.pdf | 8 Jul 2021 |
| Building Plan Approval (IOD)File: Bwing 2nd.pdf | 8 Jul 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Bwing dusri sudharit pramanpatra-merged.pdf | 8 Jul 2021 |
| Form 2AFile: 1-merged.pdf | 8 Jul 2021 |
| Building plan approvalFile: Plan B wing.pdf | 2 Jul 2021 |
| Building Plan Approval (IOD)File: Plan B wing.pdf | 2 Jul 2021 |
| Declaration about Commencement CertificateFile: Plan 2 B wing.pdf | 2 Jul 2021 |
| Disclosure of sold/ booked inventoryFile: Wing B Disclosure.pdf | 2 Jul 2021 |
| Form 2AFile: December 2020 Final.pdf | 25 Jun 2021 |
| Form 2AFile: June 2020 Final.pdf | 25 Jun 2021 |
| Form 2AFile: June 2021 Final.pdf | 25 Jun 2021 |
| Form 2AFile: March 2021 Final.pdf | 25 Jun 2021 |
| Form 2AFile: September 2020 Final.pdf | 25 Jun 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: March 2020 Final.pdf | 25 Jun 2021 |
| Form 2AFile: Revanta Wing B Jun 2020.pdf | 31 May 2021 |
| Form 2AFile: Revanta Wing B Mar 2020.pdf | 31 May 2021 |
| Form 2AFile: Form 2A2 june.pdf | 24 Aug 2020 |
| Form 2AFile: Form 2A September.pdf | 24 Aug 2020 |
| Form 2AFile: Form 2A december B wing.pdf | 24 Aug 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 7 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate.pdf | 7 Dec 2019 |
| Form 2AFile: Form 2A March.pdf | 7 Dec 2019 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 7 Dec 2019 |
| Form 2AFile: Revanta Form 2 A Wing B.pdf | 14 Feb 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Kolhapur
Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 106 filed documents as one ZIP, foldered, with a manifest
Keep REVANTA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mali colony Takala880+ in Kolhapur
Eminent Square
SHRI SIDDHIVINAYAK ASSOCIATES
PunyaSrushti Tower B and C
Punyasrushti Sahakari Gruhnirman Sanstha M
NIMBALKAR HERITAGE
MORBALE INFRA PROJECT PRIVATE LIMITED
PUNYA ARPIT
RAMSINA CONSTRUCTIONS PVT LTD
HARMONY MADHUBAN
M/S HARMONY INFRA
RAJARAM HEIGHTS
SUNRISE INFRA PROJECTS
See every Kolhapur project, with the district possession charts
Builder: SIDDHESH PADMAMBA BUILDERS & DEVELOPERS
SIDDHESH PADMAMBA BUILDERS & DEVELOPERS has 2 registrations on MahaRERA, including REVANTA and REVANTA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.
Frequently asked questions
What are my rights if REVANTA is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of REVANTA?
The registered promoter entity is SIDDHESH PADMAMBA BUILDERS & DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in REVANTA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for REVANTA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at REVANTA?
The professionals named in the filing: Architect: Amar Bhavnendra Upadhye; Architect: Mr Rahul Dattatray Durgule; Engineer: Pranav Ashok Kulkarni; Engineer: Sanjay D More; Chartered Accountant: Dadasaheb B Pednekar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in REVANTA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback