ReraGenieLog inGet a buyer report

Home / Browse projects / Palghar, Maharashtra / RELIABLE SWAPNA NAGRI-9,10,11,12

Registration lapsed No litigation declared Residential / Group Housing project

RELIABLE SWAPNA NAGRI-9,10,11,12

By RELIABLE TARANG

RG-MH-43234 · RERA P99000008641 · Last updated on MahaRERA portal: 13 Sep 2022

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Completion date moved by 72 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
52 of 88Construction stages doneacross 8 buildings; furthest along: Slabs of Super Structure, 90%
0Complaints at MahaRERAon this registration
Jump to the 34 documents Report an error

RELIABLE SWAPNA NAGRI-9,10,11,12 is a Residential / Group Housing project by RELIABLE TARANG in Palghar, Maharashtra, registered with MahaRERA as P99000008641 on 19 Aug 2017. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 72 months from the original filing.

At a glance

Project

  • NameRELIABLE SWAPNA NAGRI-9,10,11,12
  • TypeResidential / Group Housing
  • Location
    • NALASOPARA
    • VASAI
    • Vasai-Virar City (M Corp)
    • Palghar
    • 401209
  • Pincode401209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000008641
  • ReraGenie IDRG-MH-43234

Builder

  • NameRELIABLE TARANG
  • Entity typePartnership
  • PartnersFATEMA ALIASGAR BHANPURWALA, MINHAJ SIRAJ AHMED, ABIDBHAI ABBASBHAI BHANPURWALA, QUAIDJOHAR MAQBULHUSSAIN MIYAJIWALA, ISRAR MOINUDDIN KHAN, GHAZAFFER HUSSAIN ZARIWALA, RIAZ ABDUL LATIF SHEIKH
  • Other registrations2 more →
  • Completed2 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

10 months past promisethis monthRegisteredAug 2017First promiseDec 2019Revised toDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on19 Aug 2017
  • Promised completion31 Dec 2025
  • Revised completionRevised to 31 Dec 2025 (originally 25 Dec 2019)
  • Buildings8 building records
  • Documents filed34 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bldg No 9NA40000
Bldg No 10NA40000
Bldg No 11NA50000
Bldg No 12NA50000
Bldg No 9NA40000
Bldg No 10NA40000
Bldg No 11NA40000
Bldg No 12NA40000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building8

As on 13 Sep 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

52 of 88 construction stages are filed complete across 8 buildings. The stage furthest along is Slabs of Super Structure, at 90%.

Bldg No 955%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks50%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bldg No 1071%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Bldg No 1190%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Bldg No 1291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bldg No 942%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises40%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks40%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Bldg No 1082%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Bldg No 1177%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%
Bldg No 1273%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Sep 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes70%
Landscaping & Tree PlantingYes50%
Street LightingYes70%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes30%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes20%
Open ParkingYes50%

Parking filed76

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots76
Closed/Covered2
Open Space74
BuildingClosed/CoveredOpen SpaceTotal
Bldg No 901414
Bldg No 1002020
Bldg No 1112021
Bldg No 1212021

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,652 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI6246.16
Proposed, not sanctioned4,910 sq m
Buildings approved8
Buildings sanctioned8

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNALLASOPARA

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRITHVI ARCH CONSULTANT PROP VIPUL ADHIA
PartnerRole in project
RELIABLE TARANG-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000005358Dec 2019 → Dec 2020

Reason as filed by the promoterdelay in permission from authorities

EXT99000015279Dec 2019 → Dec 2025

Reason as filed by the promoterDear sir , it is big layout project consisting of several buildings. we have completed major RCC sturcture and finishing work. we hereby request you to grant the extesion.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 1 Aug 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Aug 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 Oct 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed34

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 3(1920).pdf13 Sep 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 3(2021).pdf13 Sep 2022
PAN CardFile: Pan Card.pdf10 Sep 2022
Disclosure of sold/ booked inventoryFile: 34.pdf19 Mar 2022
Declaration about Commencement CertificateFile: CC Declaration.pdf17 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Letter-5-6.pdf17 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Letter-1-2.pdf17 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Letter-3-4.pdf17 Mar 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Letter-5-6.pdf17 Mar 2022
CERSAI detailsFile: CERSAI_Search_Report_200231674083_For_Asset_Based_Search_05_03_2022_13_25_14_447.pdf16 Mar 2022
Certificates of CA (Form 5)File: RERA Audit Report.pdf11 Mar 2019
Commencement Certificates / NA Order for plotted developmentFile: TARANG CC-1-ilovepdf-compressed.pdf12 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: TARANG CC 2-ilovepdf-compressed.pdf12 Oct 2018
Layout approvalFile: LAYOUT.pdf1 Aug 2017
Layout approvalFile: lAYOUT 2.pdf1 Aug 2017
Building plan approvalFile: lAYOUT 2.pdf1 Aug 2017
Building plan approvalFile: LAYOUT.pdf1 Aug 2017
Copy of the legal title reportFile: Title Clearance Cartificate Survey No 232-ilovepdf-compressed.pdf1 Aug 2017
Copy of the legal title reportFile: Title Clearance Cartificate Survey No 234-ilovepdf-compressed.pdf1 Aug 2017
Copy of the legal title reportFile: Title Clearance Cartificate Survey No 241-ilovepdf-compressed (3).pdf1 Aug 2017
Copy of the legal title reportFile: Title Clearance Cartificate Survey No 243-ilovepdf-compressed.pdf1 Aug 2017
Copy of the legal title reportFile: Title Clearance Cartificate Survey No 244-ilovepdf-compressed (1).pdf1 Aug 2017
Details of encumbrancesFile: RSN 3,4,6,7,9,10,11,12.pdf1 Aug 2017
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf1 Aug 2017
Copy of Layout Approval (in case of layout)File: lAYOUT 2.pdf1 Aug 2017
Building Plan Approval (IOD)File: LAYOUT.pdf1 Aug 2017
Building Plan Approval (IOD)File: lAYOUT 2.pdf1 Aug 2017
Declaration in FORM BFile: FORM 'B' TARANG-ilovepdf-compressed.pdf1 Aug 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: PAC312-RERA-FORM1-3,4,6,7,9,10-ilovepdf-compressed.pdf1 Aug 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 Building No 3,4,6,7,9,10,11,12-ilovepdf-compressed.pdf1 Aug 2017
Certificates of CA (Form 3)File: Annexure A Bdg(3,4,6,7,9,10,11,12)-ilovepdf-compressed.pdf1 Aug 2017
Certificates of CA (Form 3)File: FORM3-3,4,6,7,9,10,11,12-ilovepdf-compressed.pdf1 Aug 2017
Proforma of Allotment letterFile: Allotment Letter Draft.pdf1 Aug 2017
Proforma of Allotment letterFile: Agreement.pdf1 Aug 2017

How this compares with Palghar

31%of Palghar projects moved their completion datethis one moved by 72 months
26%of Palghar registrations have lapsed or been cancelledthis one is among them

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RELIABLE SWAPNA NAGRI-9,10,11,12 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASAI3,200+ in Palghar

Builder: RELIABLE TARANG

RELIABLE TARANG has 3 registrations on MahaRERA, including RELIABLE SWAPNA NAGARI-21,22,23,24,25,26,27 and RELIABLE SWAPNA NAGRI-9,10,11,12. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What does it mean that RELIABLE SWAPNA NAGRI-9,10,11,12 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if RELIABLE SWAPNA NAGRI-9,10,11,12 is delayed beyond 31 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RELIABLE SWAPNA NAGRI-9,10,11,12?

The registered promoter entity is RELIABLE TARANG, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RELIABLE SWAPNA NAGRI-9,10,11,12?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RELIABLE SWAPNA NAGRI-9,10,11,12?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RELIABLE SWAPNA NAGRI-9,10,11,12?

The professionals named in the filing: Architect: PRITHVI ARCH CONSULTANT PROP VIPUL ADHIA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RELIABLE SWAPNA NAGRI-9,10,11,12?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RELIABLE SWAPNA NAGRI-9,10,11,12. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RELIABLE SWAPNA NAGRI-9,10,11,12 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.