Home / Browse projects / Nashik, Maharashtra / Reliable Commercial Complex
Reliable Commercial Complex
RG-MH-50699 · RERA P51600052728 · Last updated on MahaRERA portal: 29 Dec 2025
Source: official MahaRERA filing
Red flags
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Reliable Commercial Complex is a Others project by Shree Balaji Developers in Nashik, Maharashtra, registered with MahaRERA as P51600052728 on 22 Sep 2023. The registration is recorded completed; possession was promised by 30 Dec 2025. The completion date has moved by 12 months from the original filing. 13 of the 68 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameReliable Commercial Complex
- TypeOthers
- Location
- Satpur Shiwar
- Nashik
- Nashik (M Corp.)
- 422007
- Pincode422007
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600052728
- ReraGenie IDRG-MH-50699
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 Sep 2023
- Promised completion30 Dec 2025
- Revised completionRevised to 30 Dec 2025 (originally 31 Dec 2024)
- Buildings1 building record
- Documents filed94 files
Current status
Figures as on 29 Dec 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Reliable Commercial Complex | NA | 3 | 3 | 0 | 68 | 68 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
Reliable Commercial Complex: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 29 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed107
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Reliable Commercial Complex | NA | Rs 5.70 cr | Rs 2.92 cr |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Ar Sumit M Kumath |
| Architect | Sumit M Kumath |
| Engineer | Er Milind Rathi |
| Engineer | Milind Rathi |
| Engineer | Prathmesh Gajanan Deo |
| Chartered Accountant | CA Piyush Sant |
| Chartered Accountant | Piyush Sant |
| Chartered Accountant | P N Sabadra and Associates |
| Partner | Role in project |
|---|---|
| Shree Balaji Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promotera) Due to severe slow-down in Housing Construction Sector due to which we got delayed to achieve sale/booking target of units in spite of our best efforts and the project is continued majorly with our own funds. b) Due to High tension line at the North side of the project side, we were supposed to take additional care during the RCC work, Brick work and Plaster work, so the work progress went slowly for the safety purpose with limited work force. c) Due to theft of materials at project site, RCC work was stopped for one month appx and this led to lose of labours and consequential delay of work
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 6 Sep 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Apr 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Apr 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed94
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 94 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2024-2025)File: Form 2A -march 25.pdf | 29 Dec 2025 |
| Form 5 (FY 2024-2025)File: Realible commercial Complex- RA-Final.pdf | 8 Dec 2025 |
| Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE Sept 25.pdf | 27 Nov 2025 |
| Withdrawal Update Form 2File: ENGINEERS CERTIFICATE Sept 25.pdf | 27 Nov 2025 |
| Withdrawal Update Form 3File: CA CERTIFICATE Sept 25.pdf | 27 Nov 2025 |
| Occupational CertificateFile: OC confirmation mail Screenshot.pdf | 27 Nov 2025 |
| Occupational CertificateFile: Building Plan Approval.pdf | 27 Nov 2025 |
| Form 5 (FY 2023-2024)File: RA Report reliable Final.pdf | 26 Nov 2025 |
| Occupational CertificateFile: FULL COMPLETION CERTIFICATE.pdf | 10 Nov 2025 |
| Form 1File: ARCHITECTS CERTIFICATE Sept 25.pdf | 29 Oct 2025 |
| Form 2File: ENGINEERS CERTIFICATE Sept 25.pdf | 29 Oct 2025 |
| Form 3File: CA CERTIFICATE Sept 25_compressed.pdf | 29 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - Reliable commercial.pdf | 29 Oct 2025 |
| Form 1File: ARCH CERTIFICATE RELIABLE.pdf | 8 Aug 2025 |
| Form 2File: ENGR CERTIFICATE RELIABLE.pdf | 8 Aug 2025 |
| Form 3File: CA CERTIFICATE RELIABLE CC.pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure Reliable Commercial Complex.pdf | 8 Aug 2025 |
| Form 1File: ARCHITECT CERTIFICATE .pdf | 8 Aug 2025 |
| Form 2File: ENGINEER CERTIFICATE .pdf | 8 Aug 2025 |
| Form 3File: CA CERTIFICATE .pdf | 8 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure.pdf | 8 Aug 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Reliable Commercial Complex.pdf | 29 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure Reliable Commercial Complex.pdf | 29 Apr 2025 |
| Form 2A | 29 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer cert.pdf | 22 Apr 2025 |
| Other - TechnicalFile: Reliable PERT.pdf | 28 Mar 2025 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Bank.pdf | 3 Mar 2025 |
| Declaration in FORM BFile: Form B.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RELIABLE commercial complex CA CERTIFICATE.pdf | 19 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth Intimation.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE RELIABLE COMMERCIAL COMPLEX 31-12-24.pdf | 6 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE RELIABLE COMMERCIAL COMPLEX 32-12-24.pdf | 6 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE RELIABLE COMMERCIAL COMPLEX 31-12-24.pdf | 6 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: DSICLOSURE RELIABLE COMMERCIAL COMPLEX.pdf | 6 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE RELIABLE COMMERCIAL COMPLEX 31-12-24.pdf | 21 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE RELIABLE COMMERCIAL COMPLEX 32-12-24.pdf | 21 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE RELIABLE COMMERCIAL COMPLEX 31-12-24.pdf | 21 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SHREE BALAJI DEVELOPERS ARCHITECTS CERTIFICATE.pdf | 18 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHREE BALAJI DEVELOPERS CA CERTIFICATE.pdf | 18 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SHREE BALAJI DEVELOPERS ENGINEERS CERTIFICATE.pdf | 18 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Reliable commercial complex.pdf | 18 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RA Report reliable Final.pdf | 22 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RELIABLE COMMERCIAL COMPLEX ARCH CERTIFICATE.pdf | 8 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RELIABLE COMMERCIAL COMPLEX ENGR CERTIFICATE.pdf | 8 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: RELIABLE COMMERCIAL COMPLEX DISCLOSURE.pdf | 8 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RELIABLE COMMERCIAL COMPLEX CA CERTIFICATE.pdf | 8 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 25 May 2024 |
| Disclosure of sold/ booked inventoryFile: Reliable commercial complex Disclosure sold unso.pdf | 25 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 24.pdf | 25 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate March 24.pdf | 25 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 24 - converted.pdf | 25 Apr 2024 |
| Layout approvalFile: RELIABLE APPROVED BUILDING PLAN.pdf | 4 Apr 2024 |
| Building plan approvalFile: RELIABLE APPROVED BUILDING PLAN.pdf | 4 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: RELIABLE APPROVED BUILDING PLAN.pdf | 4 Apr 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: RELIABLE APPROVED BUILDING PLAN.pdf | 4 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: RELIABLE COMMENCEMENT CERTIFICATE.pdf | 4 Apr 2024 |
| Declaration about Commencement CertificateFile: Form D.pdf | 4 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory.pdf | 4 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE RELIABLE COMMERCIAL COMPLEX.pdf | 4 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RELIABLE COMMERCIAL COMPLEX ARCH CERTIFICATE 311223.pdf | 20 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RELIABLE COMMERCIAL COMPLEX ENGR CERTIFICATE 311223.pdf | 20 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RELIABLE COMMERCIAL COMPLEX CA CERTIFICATE 311223.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH CERTIFICATE RCC 30 09 23.pdf | 19 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTI RCC 30 09 23.pdf | 19 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA CERTIFICATE RCC 30 09 23.pdf | 19 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Confirmation.pdf | 11 Sep 2023 |
| Other - TechnicalFile: CC Confirmation.pdf | 11 Sep 2023 |
| CERSAI detailsFile: CERSAI_Search_Report.pdf | 7 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate _signed 01.pdf | 7 Sep 2023 |
| Proforma of Agreement for saleFile: AFS final.pdf | 7 Sep 2023 |
| Layout approvalFile: Plan 01_01.pdf | 6 Sep 2023 |
| Layout approvalFile: Plan 02_01.pdf | 6 Sep 2023 |
| Building plan approvalFile: Plan 01_01.pdf | 6 Sep 2023 |
| Building plan approvalFile: Plan 02_01.pdf | 6 Sep 2023 |
| PAN CardFile: Firm Pan Card.pdf | 6 Sep 2023 |
| Copy of the legal title reportFile: Title Report 01.pdf | 6 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Finance.pdf | 6 Sep 2023 |
| Details of encumbrances concerned to FinanceFile: Details of encumbrances concerned to Legal.pdf | 6 Sep 2023 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Shri Ram KunjP51600049058 | Nashik, Nashik | 105 | Jan 2023 | Ongoing | Jun 2026 | Not delivered |
| SHANTI NIKETANP51600024169 | MURLIDHAR VAZRE NAGAR, Nashik | - | Jan 2020 | Completed | Dec 2025 | May 2022 |
| The Hub-B WingP51600018129 | Parijat Nagar, Nashik | - | Oct 2018 | Completed | Jun 2023Registered original: Jun 2021 | Jun 2023 |
| PNT SQUAREP51600013917 | Nashik (M Corp.), Nashik | - | Nov 2017 | Completed | Dec 2022 | Dec 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 21 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 94 filed documents as one ZIP, foldered, with a manifest
Keep Reliable Commercial Complex on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Nashik4,100+ in Nashik
Filed coordinates, straight-line distance. 73 registered projects within 2 km.
SHREE GANESH SRUSHTI
JYK NIRMITI INFRA LLP
BOLKAR MAJESTIC
GANESH TUKARAM BOLKAR
PALM TOWN
VAKRATUNDA PROPERTIES
Swaraj 1 and 2 BHK Homes
Kothawale Patil Builders And Developers Pv
HAPPY LIFE AT APNA GHAR PHASE V
M/S Shweta Infrastructure & Housing (I) Pv
Balaji Heights
Geeta Developers
See every Nashik project, with the district possession charts
Builder: Shree Balaji Developers
SHREE BALAJI DEVELOPERS has 22 registrations on MahaRERA, including SHREE RESIDENCY and PNT SQUARE. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if Reliable Commercial Complex is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Reliable Commercial Complex?
The registered promoter entity is Shree Balaji Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Reliable Commercial Complex?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Reliable Commercial Complex?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Reliable Commercial Complex?
The professionals named in the filing: Architect: Ar Sumit M Kumath; Architect: Sumit M Kumath; Engineer: Er Milind Rathi; Engineer: Milind Rathi; Engineer: Prathmesh Gajanan Deo; Chartered Accountant: CA Piyush Sant. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Reliable Commercial Complex?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback