Home / Browse projects / Nashik, Maharashtra / BOLKAR MAJESTIC

Registered No litigation declared Residential / Group Housing project

BOLKAR MAJESTIC

By GANESH TUKARAM BOLKAR

RG-MH-14076 · RERA P51600030738 · Last updated on MahaRERA portal: 7 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 16 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 16 months from the original
5 of 11Construction stages donefurthest along: Internal walls, 95%
157 of 188Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

BOLKAR MAJESTIC is a Residential / Group Housing project by GANESH TUKARAM BOLKAR in Nashik, Maharashtra, registered with MahaRERA as P51600030738 on 13 Sep 2021. Possession is promised by 31 Dec 2026. The completion date has moved by 16 months from the original filing. 31 of the 188 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameBOLKAR MAJESTIC
  • TypeResidential / Group Housing
  • Location
    • NEAR MOULE HALL
    • ASHOK NAGAR ROAD SATPUR
    • Satpur
    • Nashik
    • 422007
  • Pincode422007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600030738
  • ReraGenie IDRG-MH-14076

Builder

  • NameGANESH TUKARAM BOLKAR
  • Entity typeIndividual
  • Other registrations2 more →
  • Completed2 of 3
  • Declared earlier projects3 →

Key dates

this monthRegisteredSep 2021First promiseAug 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on13 Sep 2021
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 1 Aug 2025)
  • Buildings1 building record
  • Documents filed91 files

Current status

16%31 of 188 units booked
77.5%Work done, per cost certificate

Figures as on 7 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BOLKAR MAJESTICNA10109791188

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

BOLKAR MAJESTIC: 87% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.90%

Progress on shared amenities15

As on 7 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes80%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes90%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed68

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots68
Closed/Covered68

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,550 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authorityNASHIK MUNCIPAL CORPORATION
Permissible FSI8999.47
Proposed, not sanctioned8,999 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGROUND FLOOR ASMITA BUSINESS CENTER PLOT NO 19 GAT NO 488 SATPUR COLONY NASHIK
Estimated costRs 41.06 cr
Cost incurredRs 31.82 cr
Work done77.5%
BuildingWingEstimatedIncurred
BOLKAR MAJESTICNARs 20.53 crRs 15.91 cr
-NARs 20.53 crRs 15.91 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectER HEMANT PAWAR
ArchitectHEMANT PAWAR
EngineerSTRU ER KISHOR CHOPDA
EngineerKISHOR CHOPDA
Chartered AccountantMANOJ TAMBE AND ASSOCIATES
Chartered AccountantMANOJ S TAMBE
PartnerRole in project
GANESH TUKARAM BOLKAR-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA31072502268Aug 2025 → Dec 2026

Reason as filed by the promoterBookings are not to the mark as expected. Wing c are completed and A & B Wing are processing however, units are still unsold. There was severe slow-down in Housing construction sector due to which i got delayed to achieve sale/booking target of flats in spite of my best efforts and the project continued with our own funds till the time i succeed to sale and collect money from customers.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Aug 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Aug 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Aug 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Aug 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 JUNE.pdf7 Sep 2026
Withdrawal Update Form 2File: FORM 2 JUNE.pdf7 Sep 2026
Withdrawal Update Form 3File: Form -3.pdf7 Sep 2026
Withdrawal Update Form 1File: form 1 m.pdf31 Jul 2026
Withdrawal Update Form 1File: FORM 1 JUNE.pdf31 Jul 2026
Withdrawal Update Form 2File: form 2 march.pdf31 Jul 2026
Withdrawal Update Form 2File: FORM 2 JUNE.pdf31 Jul 2026
Withdrawal Update Form 3File: form 3 m.pdf31 Jul 2026
Withdrawal Update Form 3File: form 3 m.pdf31 Jul 2026
Form 5 (FY 2025-2026)File: FORM 5.pdf31 Jul 2026
Withdrawal Update Form 1File: form 1.pdf2 Apr 2026
Withdrawal Update Form 2File: form 2.pdf2 Apr 2026
Withdrawal Update Form 3File: form 3.pdf2 Apr 2026
Withdrawal Update Form 1File: FORM 1 SEP 2025.pdf22 Dec 2025
Withdrawal Update Form 2File: FORM 2 20-02-2024.pdf22 Dec 2025
Withdrawal Update Form 3File: form 3 new sep 2025.pdf22 Dec 2025
Form 5 (FY 2023-2024)File: FORM 5 2023 TO 2024.pdf28 Jul 2025
Form 5 (FY 2024-2025)File: FORM 5 2024-2025.pdf28 Jul 2025
Form 1File: FORM 1 SEP 2021.pdf18 Jul 2025
Form 2File: FORM 2 SEP 2021.pdf18 Jul 2025
Form 3File: FORM 3 SEP 2021.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: sep 2021.pdf18 Jul 2025
Form 1File: FORM 1 DEC 2023.pdf18 Jul 2025
Form 2File: FORM 2 DEC 2023.pdf18 Jul 2025
Form 3File: FORM 3 DEC 2023.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: dec 2023.pdf18 Jul 2025
Form 1File: FORM 1 20-03-2024.pdf18 Jul 2025
Form 2File: FORM 2 22-03-2024.pdf18 Jul 2025
Form 3File: FORM 3 MARCH 2024.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: march 2024.pdf18 Jul 2025
Form 1File: FORM 1 1-06-2024.pdf18 Jul 2025
Form 2File: FORM 2 15-06-2024.pdf18 Jul 2025
Form 3File: FORM 3 15-06-2024.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: march 2024.pdf18 Jul 2025
Form 1File: FORM 1 20-09-2024.pdf18 Jul 2025
Form 2File: FORM 2 15-09-2024.pdf18 Jul 2025
Form 3File: FORM 3 15-09-2024.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: sep 2024.pdf18 Jul 2025
Form 1File: FORM 1 DEC 2024 (2-1-2025).pdf18 Jul 2025
Form 2File: FORM 2 DEC 2024 (8-2-205).pdf18 Jul 2025
Form 3File: FORM 3 DEC 2025 (8-2-2025).pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: dec 2024.pdf18 Jul 2025
Form 1File: FORM 1 MARCH 2025.pdf18 Jul 2025
Form 2File: FORM 2.pdf18 Jul 2025
Form 3File: FORM 3 MARCH 2025.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: march 2025.pdf18 Jul 2025
Form 5 (FY 2021-2022)File: FORM 5 2021-2022.pdf18 Jul 2025
Form 5 (FY 2022-2023)File: FORM 5 (4-12-2023).pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 DEC 2024 (2-1-2025).pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 DEC 2025 (8-2-2025).pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 DEC 2024 (8-2-205).pdf18 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 20-06-2024.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 20-09-2024.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 15-06-2024.pdf6 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 15-09-2024.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 15-06-2024.pdf6 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 15-09-2024.pdf6 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2023 TO 2024.pdf6 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 20-02-2024.pdf12 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 20-02-2024.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 NEW 22-03-2024.pdf12 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 22-03-2024.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 29-11-2023.pdf6 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 1-12-2023.pdf6 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf5 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 (1-12-2023)_11zon.pdf5 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 (4-12-2023).pdf5 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 (4-12-2023).pdf5 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 (4-12-2023).pdf5 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 (4-12-2023).pdf5 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 3.pdf21 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf25 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf1 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA CERTIFICATE majestic FORM 1.pdf1 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf1 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5.pdf1 Feb 2023
Declaration about Commencement CertificateFile: forma D Bolkar Majestic.pdf9 Sep 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 CA.pdf26 Aug 2021
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT.pdf25 Aug 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER RERA BOLKAR MAJESTIC.pdf25 Aug 2021

How this compares with Nashik

16%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one moved by 16 months
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BOLKAR MAJESTIC on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near ASHOK NAGAR ROAD SATPUR4,100+ in Nashik

2 kmBOLKAR MAJESTICCompleted 26Lapsed / revoked 9Other 16Dot size: filed unitsN

Filed coordinates, straight-line distance. 51 registered projects within 2 km.

Builder: GANESH TUKARAM BOLKAR

Ganesh Tukaram Bolkar has 3 registrations on MahaRERA, including Swami Darshan and BOLKAR NAKSHATRA A B C. Its filings disclose 3 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if BOLKAR MAJESTIC is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BOLKAR MAJESTIC?

The registered promoter entity is GANESH TUKARAM BOLKAR, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BOLKAR MAJESTIC?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BOLKAR MAJESTIC?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BOLKAR MAJESTIC?

The professionals named in the filing: Architect: ER HEMANT PAWAR; Architect: HEMANT PAWAR; Engineer: STRU ER KISHOR CHOPDA; Engineer: KISHOR CHOPDA; Chartered Accountant: MANOJ TAMBE AND ASSOCIATES; Chartered Accountant: MANOJ S TAMBE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BOLKAR MAJESTIC?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BOLKAR MAJESTIC. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BOLKAR MAJESTIC to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.