ReraGenieLog inGet a buyer report

Home / Browse projects / Nashik, Maharashtra / Swaraj 1 and 2 BHK Homes

Registered No litigation declared Others project

Swaraj 1 and 2 BHK Homes

By Kothawale Patil Builders And Developers Pvt. Ltd.

RG-MH-82432 · RERA P51600051745 · Last updated on MahaRERA portal: 15 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedno revision filed
9 of 22Construction stages doneacross 2 buildings; furthest along: Stilt Floor, 75%
70 of 152Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 108 documents Report an error

Swaraj 1 and 2 BHK Homes is a Others project by Kothawale Patil Builders And Developers Pvt. Ltd. in Nashik, Maharashtra, registered with MahaRERA as P51600051745 on 27 Jun 2023. Possession is promised by 31 Dec 2027. 82 of the 152 units on this registration are recorded sold or booked, and 9 of 22 construction stages are filed complete.

At a glance

Project

  • NameSwaraj 1 and 2 BHK Homes
  • TypeOthers
  • Location
    • Maule Mala
    • Behind Bhaji Market
    • Satpur
    • Satpur
    • Nashik
    • 422007
  • Pincode422007
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600051745
  • ReraGenie IDRG-MH-82432

Builder

  • NameKothawale Patil Builders And Developers Pvt. Ltd.
  • Entity typeCompany
  • GSTIN27AAFCK4725J1ZC
  • DirectorsSantosh Parmanand Kothawale, Anita Santosh Kothawale, Sandesh Vilas Patil, Dilip Bajirao Deshmukh, Jayshree Diliprao Deshmukh, Bharati Vilas Patil Bodkhe, Bhakti Hemant Kothawale, Jagdish Prabhakar Vatare
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJun 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed108 files

Current status

54%82 of 152 units booked
48.5%Work done, per cost certificate

Figures as on 15 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA9870676
Wing BNA9870676

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 75%.

Wing A18%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B75%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor75%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.50%

Progress on shared amenities15

As on 15 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed259

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots259
Closed/Covered234
Open Space25
BuildingClosed/CoveredOpen SpaceTotal
Wing A11716133
Wing B1179126

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,100 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNashik Municipal Corporation
Permissible FSI7276.14
Proposed, not sanctioned7,276 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchIndira Nagar, Nashik
Estimated costRs 11.61 cr
Cost incurredRs 5.63 cr
Work done48.54%
BuildingWingEstimatedIncurred
Wing ANARs 5.63 crRs 56.35 lakh
Wing BNARs 5.63 crRs 5.07 cr
-NARs 34.00 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVijay Nikam
EngineerSagar Shah
Chartered AccountantNirav Shailesh Shah & Co
Chartered AccountantSaril Shah & Associates
PartnerRole in project
Kothawale Patil Builders And Developers Pvt. Ltd.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 22 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Oct 2024

Documents filed108

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 108 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 25-26 Q4.pdf15 Apr 2026
Withdrawal Update Form 2File: Form 2 25-26 Q4.pdf15 Apr 2026
Withdrawal Update Form 3File: Form 3 25-26 Q4.pdf15 Apr 2026
Form 1File: Form 1 25-26 Q3.pdf31 Mar 2026
Form 2File: Form 2 25-26 Q3.pdf31 Mar 2026
Form 3File: Form 3 SD 25-26 Q3.pdf31 Mar 2026
Disclosure of Sold and Booked InventoryFile: Inventory 25-26 Q3.pdf31 Mar 2026
Form 1File: Form 1 25-26 Q1.pdf18 Oct 2025
Form 2File: Form 2 25-26 Q1.pdf18 Oct 2025
Form 3File: Form 3 SD 25-26 Q1.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory 30-06-2025.pdf18 Oct 2025
Form 1File: Form 1 25-26 Q2.pdf18 Oct 2025
Form 2File: Form 2 25-26 Q2.pdf18 Oct 2025
Form 3File: Form 3 SD 25-26 Q2.pdf18 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory 30-09-2025.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: Form 5 - 2024-25.pdf18 Oct 2025
Form 1File: Form 1.pdf8 Oct 2025
Form 2File: Form 2.pdf8 Oct 2025
Form 3File: Form 3 Declaration.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of book - sold.pdf8 Oct 2025
Form 1File: Form 1.pdf8 Oct 2025
Form 2File: Form 2.pdf8 Oct 2025
Form 3File: Form 3 Declaration.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of book - sold.pdf8 Oct 2025
Form 1File: Form 1 Q4.pdf8 Oct 2025
Form 2File: Form 2 Q4.pdf8 Oct 2025
Form 3File: Form 3 SD Q4.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q4.pdf8 Oct 2025
Form 1File: Form 1 Q1.pdf8 Oct 2025
Form 2File: Form 2 Q1.pdf8 Oct 2025
Form 3File: Form 3 SD Q1.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Inventory Q1.pdf8 Oct 2025
Form 1File: Form 1 Q2.pdf8 Oct 2025
Form 2File: Form 2 Q2.pdf8 Oct 2025
Form 3File: Form 3 SD Q2.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory Q2.pdf8 Oct 2025
Form 1File: Form 1 2024-25 Q3.pdf8 Oct 2025
Form 2File: Form 2 2024-25 Q3.pdf8 Oct 2025
Form 3File: Form 3 SD 2024-25 Q3.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory 2024-25 Q3.pdf8 Oct 2025
Form 1File: Form 1 24-25 Q4.pdf8 Oct 2025
Form 2File: Form 2 24-25 Q4.pdf8 Oct 2025
Form 3File: Form 3 SD 24-25 Q4.pdf8 Oct 2025
Disclosure of Sold and Booked InventoryFile: Inventory 31-03-2025.pdf8 Oct 2025
Form 5 (FY 2023-2024)File: Form 5 FY 2023-24.pdf8 Oct 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 24-25 Q4.pdf11 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD 24-25 Q4.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 24-25 Q4.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Inventory 31-03-2025.pdf11 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q3.pdf31 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD 2024-25 Q3.pdf31 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q3.pdf31 Jan 2025
Disclosure of sold/ booked inventoryFile: Inventory 2024-25 Q3.pdf31 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf30 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q2.pdf30 Oct 2024
Architect’s Certificate on Completion of Project (Form 4)File: Form 4.pdf30 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q2.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf30 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2.pdf30 Oct 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Omkar heights completion.pdf30 Oct 2024
Disclosure of sold/ booked inventoryFile: Inventory Q2.pdf30 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - 2023-24.pdf30 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: New Form 2A - 2024.pdf17 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q4.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Q1.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q4.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q1.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Q4.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory Q1.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q4.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 SD Q1.pdf16 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of book - sold.pdf12 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of book - sold.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration.pdf12 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration.pdf12 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf26 Nov 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationRegisteredStatusPromisedDelivered
Omkar HeightsP51600049255MSEB Colony, Near Indira Gandhi Statue, Nashik Road, NashikFeb 2023CompletedDec 2024Oct 2024

How this compares with Nashik

54%of this project is bookeddistrict median 17%
10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is on the register

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Swaraj 1 and 2 BHK Homes on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Behind Bhaji Market, Satpur4,100+ in Nashik

2 kmSwaraj 1 and 2 BHK HomesCompleted 31Lapsed / revoked 12Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 60 registered projects within 2 km.

Builder: Kothawale Patil Builders And Developers Pvt. Ltd.

Kothawale Patil Builders And Developers Pvt. Ltd. has 2 registrations on MahaRERA, including Omkar Heights and Swaraj 1 and 2 BHK Homes. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Swaraj 1 and 2 BHK Homes is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Swaraj 1 and 2 BHK Homes?

The registered promoter entity is Kothawale Patil Builders And Developers Pvt. Ltd., a company as per the filing. Its GSTIN 27AAFCK4725J1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Swaraj 1 and 2 BHK Homes?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Swaraj 1 and 2 BHK Homes?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Swaraj 1 and 2 BHK Homes?

The professionals named in the filing: Architect: Vijay Nikam; Engineer: Sagar Shah; Chartered Accountant: Nirav Shailesh Shah & Co; Chartered Accountant: Saril Shah & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Swaraj 1 and 2 BHK Homes?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Swaraj 1 and 2 BHK Homes. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Swaraj 1 and 2 BHK Homes to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.