Home / Browse projects / Nashik, Maharashtra / PALM TOWN
PALM TOWN
RG-MH-15136 · RERA P51600034576 · Last updated on MahaRERA portal: 30 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 9 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PALM TOWN is a Residential / Group Housing project by VAKRATUNDA PROPERTIES in Nashik, Maharashtra, registered with MahaRERA as P51600034576 on 11 Apr 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 9 months from the original filing. 55 of the 164 units on this registration are recorded sold or booked, and 51 of 66 construction stages are filed complete.
At a glance
Project
- NamePALM TOWN
- TypeResidential / Group Housing
- Location
- SURVEY NO 100 SATPUR SHIWAR
- NEAR SUYOJIT LAWNS MAHATMA NAGAR
- Nashik
- 422007
- Pincode422007
- RERA no.P51600034576
- ReraGenie IDRG-MH-15136
Builder
- NameVAKRATUNDA PROPERTIES
- Entity typePartnership
- PartnersMANIK ANILKUMAR KARWA, SUNNY NARENDRA PARAKH, SAMEER RAJENDRA TOTALE, SHASHIKANT SANTOKCHAND SURANA, NEELU MANOJ KHIVASARA, CHINTAN NARENDRA MUTHA, KIRTI SURESH JAIN
- Other registrations1 more →
- Completed1 of 2
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Apr 2022
- Promised completion31 Dec 2026
- Revised completionRevised to 31 Dec 2026 (originally 31 Mar 2026)
- Buildings6 building records
- Documents filed93 files
Current status
Figures as on 30 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING A | NA | 10 | 7 | 28 | 0 | 28 |
| WING B | NA | 10 | 7 | 28 | 0 | 28 |
| WING C | NA | 10 | 7 | 26 | 0 | 26 |
| WING D | NA | 10 | 7 | 26 | 0 | 26 |
| WING E | NA | 10 | 7 | 28 | 0 | 28 |
| WING F | NA | 10 | 7 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building6
As on 30 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
51 of 66 construction stages are filed complete across 6 buildings. The stage furthest along is External plumbing and external plaster, at 40%.
WING A91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING B91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING C91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
WING D69%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING E69%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
WING F69%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 20% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 40% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 50% |
| Street Lighting | Yes | 50% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING A | NA | Rs 5.80 cr | Rs 5.80 cr |
| WING B | NA | Rs 5.80 cr | Rs 5.80 cr |
| WING E | NA | Rs 5.80 cr | Rs 4.47 cr |
| WING F | NA | Rs 5.80 cr | Rs 4.47 cr |
| WING C | NA | Rs 5.39 cr | Rs 5.39 cr |
| WING D | NA | Rs 5.39 cr | Rs 4.15 cr |
| - | NA | Rs 2.00 cr | Rs 1.62 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SUMIT M KUMATH |
| Engineer | RAHUL S SALVE S SALVE |
| Engineer | Abhishek Mukesh Jangam |
| Engineer | Kanchan Balasaheb Tupe |
| Engineer | Pratik Vijay Jain |
| Engineer | Sagar Shah |
| Chartered Accountant | CHETAN BUMB |
| Chartered Accountant | Bhavana Bhushan Loya |
| Chartered Accountant | Nirav Shailesh Shah & Co. |
| Partner | Role in project |
|---|---|
| VAKRATUNDA PROPERTIES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThere are some technical & other problems due to which the progress on site was little slower and we will not be able to obtain Occupancy Certificate till 31/03/2026.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 19 Mar 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 21 Sep 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed93
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1 26-27 Q1.pdf | 30 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 26-27 Q1.pdf | 30 Jul 2026 |
| Withdrawal Update Form 3File: Form 3 SD 26-27 Q1.pdf | 30 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 25-26 Q4.pdf | 16 May 2026 |
| Withdrawal Update Form 2File: Form 2 25-26 Q4.pdf | 16 May 2026 |
| Withdrawal Update Form 3File: Form 3 SD 25-26 Q4.pdf | 16 May 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 28 Mar 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 28 Mar 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 28 Mar 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 19 Mar 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 19 Mar 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 19 Mar 2026 |
| Withdrawal Update Form 1File: VP Form 1.pdf | 5 Feb 2026 |
| Withdrawal Update Form 2File: VP Form 2.pdf | 5 Feb 2026 |
| Withdrawal Update Form 3File: scanned form 3_compressed.pdf | 5 Feb 2026 |
| Withdrawal Update Form 1File: VP Form 1 Q2.pdf | 14 Nov 2025 |
| Withdrawal Update Form 2File: VP Form 2 Q2.pdf | 14 Nov 2025 |
| Withdrawal Update Form 3File: VP Form 3 Q2 UPLOADED.pdf | 14 Nov 2025 |
| Form 5 (FY 2024-2025)File: Final Form 5 uPLOADED.pdf | 27 Sep 2025 |
| Form 1File: Vakratunda Properties Architect Certificate.pdf | 15 Aug 2025 |
| Form 2File: Form 2 Q3.pdf | 15 Aug 2025 |
| Form 3File: RERA Form 3 Q3.pdf | 15 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold.pdf | 15 Aug 2025 |
| Withdrawal Update Form 1File: Form 1 Q1.pdf | 15 Aug 2025 |
| Withdrawal Update Form 2File: Form 2 Q2.pdf | 15 Aug 2025 |
| Withdrawal Update Form 3File: Palm Town Form 3 Q1 FINAL.pdf | 15 Aug 2025 |
| Form 1File: VP Form 1 Q4 2024-25.pdf | 23 Jun 2025 |
| Form 2File: VP Form 2 Q4 2024-25.pdf | 23 Jun 2025 |
| Form 3File: vakratunda properties Form 3 Q4 24-25.pdf | 23 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold & Unsold Sheet.pdf | 23 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration_VP.pdf | 23 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE q2.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vakratunda Properties Architect Certificate.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 Q2.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 Q3.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Q2 Palm Town.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q3 Palm Town.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Vakratunda Properties Architect Certificate Q-4.pdf | 14 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE Q1 24-25.pdf | 14 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3 Q4.pdf | 14 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A Certificate fINAL.pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate Q4.pdf | 14 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng Certificate Q-1_2024.pdf | 14 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate jan-2024.pdf | 11 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA Certificate_compressed.pdf | 11 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: VP Engineer certificate 20023 Q 3.pdf | 11 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5.pdf | 8 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Oct-2023.pdf | 3 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Q-2 2023 engineer certificate.pdf | 3 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.PDF | 3 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5.PDF | 12 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arc Cert June-2022.pdf | 10 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1Architect Certificate Sep-2022.pdf | 10 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1Architect Certificate Dec -2022.pdf | 10 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1Architect Certificate March -2023.pdf | 10 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate-VP 2022-Q-1.pdf | 10 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2Engineer Certificate VP 2022-Q-2.pdf | 10 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2Engineer Certificate VP 2022-Q-3.pdf | 10 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2Engineer Certificate VP 2023-Q-4.pdf | 10 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ca certificate Q1_merged.pdf | 10 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3Ca Certificate-Q2_merged.pdf | 10 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3Ca certificate Q3_merged.pdf | 10 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3Ca Certificate Q4_merged.pdf | 10 Aug 2023 |
| Building plan approvalFile: 1of 5-.pdf | 21 Sep 2022 |
| Building plan approvalFile: 2 of 5-.pdf | 21 Sep 2022 |
| Building plan approvalFile: 3 of 5-.pdf | 21 Sep 2022 |
| Building plan approvalFile: 4 of 5-.pdf | 21 Sep 2022 |
| Building plan approvalFile: 5 of 5-.pdf | 21 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 1of 5-.pdf | 21 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 2 of 5-.pdf | 21 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 of 5-.pdf | 21 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 of 5-.pdf | 21 Sep 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 of 5-.pdf | 21 Sep 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: NEW.pdf | 21 Sep 2022 |
| Details of encumbrancesFile: Non Encumbrance Certificate.PDF | 26 Mar 2022 |
| Declaration about Commencement CertificateFile: Form D.PDF | 26 Mar 2022 |
| Declaration in FORM BFile: Form B.PDF | 26 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold.PDF | 26 Mar 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate- Form 3.PDF | 26 Mar 2022 |
| Proforma of Allotment letterFile: Proforma of Allotment Letter.PDF | 26 Mar 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 93 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PALM TOWN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near NEAR SUYOJIT LAWNS MAHATMA NAGAR4,100+ in Nashik
SHREE GANESH SRUSHTI
JYK NIRMITI INFRA LLP
BOLKAR MAJESTIC
GANESH TUKARAM BOLKAR
Swaraj 1 and 2 BHK Homes
Kothawale Patil Builders And Developers Pv
HAPPY LIFE AT APNA GHAR PHASE V
M/S Shweta Infrastructure & Housing (I) Pv
Balaji Heights
Geeta Developers
Daksh Avlon
DAKSH REALTY
See every Nashik project, with the district possession charts
Builder: VAKRATUNDA PROPERTIES
VAKRATUNDA PROPERTIES has 2 registrations on MahaRERA, including THE RENAISSANCE and PALM TOWN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if PALM TOWN is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PALM TOWN?
The registered promoter entity is VAKRATUNDA PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PALM TOWN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PALM TOWN?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PALM TOWN?
The professionals named in the filing: Architect: SUMIT M KUMATH; Engineer: RAHUL S SALVE S SALVE; Engineer: Abhishek Mukesh Jangam; Engineer: Kanchan Balasaheb Tupe; Engineer: Pratik Vijay Jain; Engineer: Sagar Shah. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PALM TOWN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback