Home / Browse projects / Mumbai Suburban, Maharashtra / Galaxy Heights, Tower-II, Wing A to B

Registered No litigation declared Residential / Group Housing project

Galaxy Heights, Tower-II, Wing A to B

By Maharashtra Police Co-Operative Housing Federation Ltd.

RG-MH-18436 · RERA P51800077290 · Last updated on MahaRERA portal: 28 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedmoved 12 months from the original
0 of 11Construction stages donefurthest along: Excavation, 75%
543 of 543Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

Galaxy Heights, Tower-II, Wing A to B is a Residential / Group Housing project by Maharashtra Police Co-Operative Housing Federation Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077290 on 6 Aug 2024. Possession is promised by 31 Dec 2029. The completion date has moved by 12 months from the original filing. 0 of the 543 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameGalaxy Heights, Tower-II, Wing A to B
  • TypeResidential / Group Housing
  • Location
    • Kala Vidyalaya Road
    • Gate No. 8
    • Dadasaheb Gaikwad Nagar
    • Malad (West)
    • Malvani
    • Borivali
    • Mumbai Suburban
    • 400095
  • Pincode400095
  • RERA no.P51800077290
  • ReraGenie IDRG-MH-18436

Builder

  • NameMaharashtra Police Co-Operative Housing Federation Ltd.
  • Entity typeSociety
  • Authorized SignatoriesSandeep Shashikant Hardikar, Sandip Kishanrao Jathar
  • Other registrations3 more →
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects5 →

Key dates

this monthRegisteredAug 2024First promiseDec 2028Revised toDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Aug 2024
  • Promised completion31 Dec 2029
  • Revised completionRevised to 31 Dec 2029 (originally 31 Dec 2028)
  • Buildings1 building record
  • Documents filed76 files

Current status

0%0 of 543 units booked
6.9%Work done, per cost certificate

Figures as on 28 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Galaxy Heights, Tower II, Wing A to B232305430543

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 28 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 75%.

Galaxy Heights, Tower II, Wing A to B · wing 2: 7% average across the applicable activities

ActivityProgress
Excavation75%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed328

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots328
Closed/Covered328

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area11,876 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on26 Aug 2025

Approvals and building plan

Sanctioning authorityMHADA
Permissible FSI35628.6
Proposed, not sanctioned26,614 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchA/3, 23 Saraf Chaudhari Nagar, Thakur Complex, Kandivali East, Mumbai 400101
Estimated costRs 261.50 cr
Cost incurredRs 18.00 cr
Work done6.88%
BuildingWingEstimatedIncurred
Galaxy Heights, Tower II, Wing A to B2Rs 240.00 crRs 18.00 cr
-NARs 21.50 cr-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Hemant Kankaraiya
EngineerShersingh Chilotra
Chartered AccountantDevesh Shah Sha
Chartered AccountantH. P. Jadeja Associates
PartnerRole in project
Maharashtra Police Co-Operative Housing Federation Ltd.-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA19122518770Dec 2028 → Dec 2029

Reason as filed by the promoterWe, the Maharashtra Police Co-op. Housing Federation Ltd., the Promoter of the above-referred project, humbly requests to allow us to submit an online application for the extension of the completion date of the said project by one (1) year under section 7(3) of the Real Estate (Regulation & Development) Act, 2016. The very logical and factual reason for the early application is the apparent delay of the project execution by almost one year, after its registration with the Authority, due to stagnation of the further permissions and to commence/carry out any construction activities following a j

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jul 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jun 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jun 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2029

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Q1 26-27 Galaxy Heights T-II.pdf28 Jul 2026
Withdrawal Update Form 2File: Form 2 Q1 26-27 Galaxy Height T-II.pdf28 Jul 2026
Withdrawal Update Form 3File: Form 3 Q1 26-27 Galaxy Heights T-II_FINAL.pdf28 Jul 2026
Form 2A (FY 2025-2026)File: Form 2A 25-26 Galaxy Heights T-II.pdf13 Jul 2026
Commencement certificateFile: T II CC Revalidation.pdf15 Jun 2026
Layout approvalFile: T -II Building Plan Copy 1.pdf15 Jun 2026
Layout approvalFile: T -II Building Plan Copy 2.pdf15 Jun 2026
Withdrawal Update Form 1File: T-II Form 1 FY 2025-26 Q4 .pdf15 Jun 2026
Withdrawal Update Form 2File: Form 2 of Q 4 (2025-26).pdf15 Jun 2026
Withdrawal Update Form 3File: T-II Form 3 Q4 25-26 .pdf15 Jun 2026
Layout approvalFile: Approved amended Drawing T II File 1.pdf19 May 2026
Layout approvalFile: Approved amended Drawing T-II File 2.pdf19 May 2026
Withdrawal Update Form 1File: Form 1 T-II Q3 FY 25-26.pdf19 May 2026
Withdrawal Update Form 1File: Form 1 T-II Q3 FY 25-26.pdf19 May 2026
Withdrawal Update Form 2File: Form 2 T-II FY 25-26 Q3.pdf19 May 2026
Withdrawal Update Form 2File: Form 2 T-II FY 25-26 Q3.pdf19 May 2026
Withdrawal Update Form 3File: FORM-3 T-II MPCHFL Q3 FY 2025-26 -FNL.pdf19 May 2026
Withdrawal Update Form 3File: FORM-3 T-II MPCHFL Q3 FY 2025-26 -FNL.pdf19 May 2026
Withdrawal Update Form 1File: Form 1 T-II Q3 FY 25-26.pdf18 Feb 2026
Withdrawal Update Form 2File: Form 2 T-II FY 25-26 Q3.pdf18 Feb 2026
Withdrawal Update Form 3File: Form 3 - T-II Q3 25-26.pdf18 Feb 2026
Withdrawal Update Form 1File: Form 1 T-II Q3 FY 25-26.pdf29 Jan 2026
Withdrawal Update Form 2File: Form 2 T-II FY 25-26 Q3.pdf29 Jan 2026
Withdrawal Update Form 3File: Galaxy T-II Form 3 Q2 25-26.pdf29 Jan 2026
Form 1File: Galaxy T-II Form 1 Q2 25-26.pdf22 Oct 2025
Form 2File: Galaxy T-II Form 2 Q2 25-26.pdf22 Oct 2025
Form 3File: Galaxy T-II Form 3 Q2 25-26.pdf22 Oct 2025
Disclosure of Sold and Booked InventoryFile: T-II Sold & Booked Inventory Q2 25-26.pdf22 Oct 2025
Withdrawal Update Form 1File: Form 1 T2 Q2 25-26.pdf18 Oct 2025
Withdrawal Update Form 2File: Galaxy T-II Form 2 Q2 25-26.pdf18 Oct 2025
Withdrawal Update Form 3File: Galaxy T-II Form 3 Q2 25-26.pdf18 Oct 2025
Form 5 (FY 2024-2025)File: T II Form 5 FY 2024 25.pdf30 Sep 2025
Form 1File: Form 1 Q1 25-26.pdf22 Jul 2025
Form 2File: Form 2 Q1 25-26.pdf22 Jul 2025
Form 3File: Form 3 Q1 25-26.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: T-II Disclosure of sold Booked Inventory Q1 FY 2025-26.pdf22 Jul 2025
Form 2A (FY 2024-2025)File: T-II FORM-2A Assurance certificate (FY 2024-25).pdf30 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Q4 FY 24-25 NEW.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: T2 Form 1 Q4 24-25.pdf18 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T2 Form 2 Q4 24-25.pdf18 Apr 2025
CERSAI detailsFile: T-II Undertaking for Cersai Q4 FY 2024-25.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: T-II Architect Certificate Q3 FY 2024-25.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: T-II Form 3 Q3 FY 2024-25 (Attested).pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 II FY 2024 2025 Q3.pdf16 Jan 2025
CERSAI detailsFile: T-II Undertaking for Cersai Q3 FY 2024-25.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: T-II Architect Certificate Q2 FY 2024-25.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: T-II Form 3 Q2 FY 2024-25 (Attested)_11zon.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - T-II FY 2024-2025 Q2.pdf18 Oct 2024
CERSAI detailsFile: T-II Undertaking for Cersai Q2 FY 2024-25.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 T2 Form 3 Attested Revised 30 07 24-REVISED.pdf2 Aug 2024
Building plan approvalFile: Plot Area Certificate-Tower T-II_26 06 2024.pdf15 Jul 2024
Copy of the legal title reportFile: LH NIKHIL_Ttitle Certificate_Police Fed_20052024 FINAL.pdf15 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: Plot Area Certificate-Tower T-II_26 06 2024.pdf15 Jul 2024
Details of encumbrances concerned to FinanceFile: Declaration For Encumbrance concerned withh Legal.pdf11 Jul 2024
Details of encumbrances concerned to LegalFile: Declaration For Encumbrance concerned withh Legal.pdf11 Jul 2024
CERSAI detailsFile: CERSAI Undertaking with Report FNL.pdf11 Jul 2024
Other - LegalFile: lease deed agreement for MPCHFL Dt 14 05 1999.pdf26 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Verification Mail from MHADA T- II, Plot C-2- Maharashtra Police Hosing.pdf18 Jun 2024
Layout approvalFile: IOA_Zero_FSI -PLAN Tower III Dt 03-05-2024-1_11zon.pdf5 Jun 2024
Layout approvalFile: IOA_Zero_FSI -PLAN Tower III Dt 03-05-2024-2_11zon.pdf5 Jun 2024
Building plan approvalFile: Zero FSI IOA Tower TII DGN dt 03052024.pdf5 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA_Zero_FSI -PLAN Tower III Dt 03-05-2024-1_11zon.pdf5 Jun 2024
Copy of Layout Approval (in case of layout)File: IOA_Zero_FSI -PLAN Tower III Dt 03-05-2024-2_11zon.pdf5 Jun 2024
Building Plan Approval / NA Order for plotted developmentFile: Zero FSI IOA Tower TII DGN dt 03052024.pdf5 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: CC-D G N T- II firstcc_signed.pdf5 Jun 2024
Declaration about Commencement CertificateFile: Format D CC declaration.pdf5 Jun 2024
Declaration in FORM BFile: Form-B Affidavit cum Declaration.pdf5 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest in other Real Estate Organizations.pdf5 Jun 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other real Estate.pdf5 Jun 2024
Proforma of Agreement for saleFile: AFS Registration Draft-13-05-2024.pdf5 Jun 2024
Proforma of Allotment letterFile: 1 Allotment Letter (Order 31).pdf5 Jun 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A Seperate Bank Account.pdf5 Jun 2024
Deviation Report with respect to Allotment letterFile: Declaration for no Deviation in the allotment.pdf5 Jun 2024
Deviation Report with respect to model copy of AgreementFile: Declaration for no Deviation in the agreement for sale.pdf5 Jun 2024
Other - TechnicalFile: Declaration cum Undertaking Standalone.pdf5 Jun 2024
PAN CardFile: 1 PAN Card.pdf1 Jun 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Galaxy Heights, Tower-III, Wing L to PMalvani Malad West Mumbai 400095584OngoingDec 2027Dec 2027
Galaxy Heights Tower 1Malawani Malad West Mumbai 400095740OngoingDec 2026Dec 2026

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Galaxy Heights, Tower-II, Wing A to B on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dadasaheb Gaikwad Nagar, Malad (West)6,700+ in Mumbai Suburban

Builder: Maharashtra Police Co-Operative Housing Federation Ltd.

MAHARASHTRA POLICE CO-OPERATIVE HOUSING FEDERATION LTD. has 4 registrations on MahaRERA, including REDEVELOPMENT OF DADASAHEB GAIKWADNAGAR and Galaxy Heights, Tower-III, Wing L to P. Its filings disclose 5 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Galaxy Heights, Tower-II, Wing A to B is delayed beyond 31 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Galaxy Heights, Tower-II, Wing A to B?

The registered promoter entity is Maharashtra Police Co-Operative Housing Federation Ltd., a society as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Galaxy Heights, Tower-II, Wing A to B?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Galaxy Heights, Tower-II, Wing A to B?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Galaxy Heights, Tower-II, Wing A to B?

The professionals named in the filing: Architect: Ar. Hemant Kankaraiya; Engineer: Shersingh Chilotra; Chartered Accountant: Devesh Shah Sha; Chartered Accountant: H. P. Jadeja Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Galaxy Heights, Tower-II, Wing A to B?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Galaxy Heights, Tower-II, Wing A to B. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Galaxy Heights, Tower-II, Wing A to B to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.