ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Raunak Bliss B6

Registered No litigation declared Residential / Group Housing project

Raunak Bliss B6

By UNNATHI ASSOCIATES

RG-MH-05575 · RERA P51700050827 · Last updated on MahaRERA portal: 11 Jun 2026

Source: official MahaRERA filing

Red flags

  • Rs 95.00 crore secured on the land, in favour of ICICI HOME FINANCE COMPANY LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
5 of 11Construction stages donefurthest along: Slabs of Super Structure, 48%
99 of 273Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

Raunak Bliss B6 is a Residential / Group Housing project by UNNATHI ASSOCIATES in Thane, Maharashtra, registered with MahaRERA as P51700050827 on 9 May 2023. Possession is promised by 31 Dec 2030. 174 of the 273 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NameRaunak Bliss B6
  • TypeResidential / Group Housing
  • Location
    • Ghodbunder Road
    • OWALE
    • Thane (M Corp.)
    • Thane
    • 400610
  • Pincode400610
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700050827
  • ReraGenie IDRG-MH-05575

Builder

  • NameUNNATHI ASSOCIATES
  • Entity typePartnership
  • PartnersSANGEETA KIRTI SHAH, KUSHAL KIRTI SHAH, Rajan Narayan Bandelkar
  • PartnerVIJAY PITAMBERDAS MODY
  • Other registrations13 more →
  • Completed4 of 14
  • Declared earlier projects2 →

Key dates

this monthRegisteredMay 2023PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on9 May 2023
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Current status

64%174 of 273 units booked
20.1%Work done, per cost certificate

Figures as on 11 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B6NA38352730273

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 48%.

B6: 53% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure48%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises15%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks15%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 11 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes50%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area5,881 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI HOME FINANCE COMPANY LIMITED
Secured amountRs 95.00 crore
CERSAI search filedYes
Declared on13 May 2026

Approvals and building plan

Sanctioning authorityTHANE MUNICIPAL CORPORATION
Permissible FSI30982.22
Proposed, not sanctioned20,982 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGLEN MORGAN, VEER SAVARKAR MARG, PANCHPAKHADI, THANE W, MAHARASHTRA - 400602
Estimated costRs 135.00 cr
Cost incurredRs 27.09 cr
Work done20.07%
BuildingWingEstimatedIncurred
B6NARs 110.00 crRs 27.09 cr
-NARs 25.00 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSUBHASH GUPTE
EngineerRAJAN TIPNIS
EngineerHARSHAL MANOHARRAO POTODE
Chartered AccountantANKIT GOYANKA
Chartered AccountantSandeep Sheth
PartnerRole in project
UNNATHI ASSOCIATES-

Litigation declared6

CaseCourtStatus
439/2006/2006CIVIL JUDGE S D THANEPending
323/2005/2005CIVIL JUDGE S D THANEPending
1351/2012/2012CIVIL JUDGE S D THANEPending
2141/2012/2012CIVIL JUDGE S D THANEPending
481/2021/2021CIVIL JUDGE S D THANEPending
291/2020/2020CIVIL JUDGE S D THANEPending

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 May 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 May 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 May 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 May 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: Form 2A Raunak Bliss B6 UA.pdf11 Jun 2026
Withdrawal Update Form 1File: Form 1 Raunak Bliss B6.pdf30 Apr 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 B6.pdf30 Apr 2026
Withdrawal Update Form 3File: CA Certificate Raunak Bliss B6 31032026.pdf30 Apr 2026
Withdrawal Update Form 1File: Form 1 B6.pdf6 Feb 2026
Withdrawal Update Form 2File: Form2 B6.pdf6 Feb 2026
Withdrawal Update Form 3File: CA Certificate Raunak Bliss B6 31122025.pdf6 Feb 2026
Withdrawal Update Form 1File: Form 1 B6.pdf15 Nov 2025
Withdrawal Update Form 2File: Form2 - B6.pdf15 Nov 2025
Withdrawal Update Form 3File: Form 3 Raunak Bliss B6 30092025.pdf15 Nov 2025
Form 5 (FY 2024-2025)File: Raunak Bliss B6.pdf29 Oct 2025
Form 2A (FY 2024-2025)File: Form 2A UA Raunak Bliss B6.pdf13 Oct 2025
Withdrawal Update Form 1File: Form 1 Raunak Bliss B6 30062025.pdf10 Sep 2025
Withdrawal Update Form 1File: Form 1 Raunak Bliss B6 30062025.pdf10 Sep 2025
Withdrawal Update Form 1File: Form 1 Raunak Bliss B6 30062025.pdf10 Sep 2025
Withdrawal Update Form 2File: Form 2 B6.pdf10 Sep 2025
Withdrawal Update Form 2File: Form 2 B6.pdf10 Sep 2025
Withdrawal Update Form 2File: Form 2 B6.pdf10 Sep 2025
Withdrawal Update Form 3File: Signed CA Certificate Raunak Bliss B6 30062025.pdf10 Sep 2025
Withdrawal Update Form 3File: Signed CA Certificate Raunak Bliss B6 30062025.pdf10 Sep 2025
Withdrawal Update Form 3File: Signed CA Certificate Raunak Bliss B6 30062025.pdf10 Sep 2025
Form 3File: Signed CA Certificate Raunak Bliss B6 31032025.pdf25 Jun 2025
Form 1File: Form 1 Bliss B6 31032025.pdf25 Jun 2025
Form 2File: Form 2 Engineers Certificate B6.pdf25 Jun 2025
Disclosure of Sold and Booked InventoryFile: B6 Sold Inventory 31032025.pdf25 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: B6 - 31122024.pdf6 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate Raunak BlissB6.pdf6 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer's Certificate B6311224.pdf5 Feb 2025
Disclosure of sold/ booked inventoryFile: B6_-_31122024.pdf5 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Raunak Bliss B6 30092024.pdf13 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: B6.pdf29 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 23_Form-2A-Raunak Bliss B6.pdf2 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: AC B6_28-04-23.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 RB B6 24-06-2023.pdf18 Nov 2023
Details of encumbrances concerned to FinanceFile: UA-ICICI-Index II.pdf4 Jul 2023
Details of encumbrances concerned to LegalFile: UA-ICICI-Index II.pdf4 Jul 2023
Proforma of Allotment letterFile: B6 Allotment letter Without WM.pdf7 May 2023
Deviation Report with respect to Allotment letterFile: 35_Deviation Report and Allotment - B6 -1.pdf7 May 2023
Deviation Report with respect to model copy of AgreementFile: B6 AFS.pdf7 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Raunak Bliss B6.pdf6 May 2023
Copy of the legal title reportFile: Title - 2023 with 7-12 extract_compressed-1.pdf4 May 2023
Copy of the legal title reportFile: Title - 2023 with 7-12 extract_compressed-2.pdf4 May 2023
Copy of the legal title reportFile: Title - 2023 with 7-12 extract_compressed-3.pdf4 May 2023
Copy of the legal title reportFile: Title - 2023 with 7-12 extract_compressed-4.pdf4 May 2023
Copy of the legal title reportFile: Title - 2023 with 7-12 extract_compressed-5.pdf4 May 2023
Copy of the legal title reportFile: Title - 2023 with 7-12 extract_compressed-6.pdf4 May 2023
Copy of the legal title reportFile: Title - 2023 with 7-12 extract_compressed-7.pdf4 May 2023
Copy of the legal title reportFile: Title - 2023 with 7-12 extract_compressed-8.pdf4 May 2023
Copy of the legal title reportFile: Title - 2023 with 7-12 extract_compressed-9.pdf4 May 2023
Copy of the legal title reportFile: Title - 2023 with 7-12 extract_compressed-10.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 KKS RERA.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 KVM RERA.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 3 RNB RERA.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 4 SKS RERA.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 5 Sumit RERA.pdf4 May 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 6 SVM RERA.pdf4 May 2023
Layout approvalFile: 5_Layout-b6.pdf2 May 2023
Building plan approvalFile: 6_Building-Plan.pdf2 May 2023
PAN CardFile: 1_Pan Card Unnathi Associates.pdf2 May 2023
Details of encumbrances concerned to FinanceFile: 3_Declaration of Encumbrances - B6_1.pdf2 May 2023
Details of encumbrances concerned to FinanceFile: 3_Declaration of Encumbrances - B6_2.pdf2 May 2023
Details of encumbrances concerned to FinanceFile: 4_Declaration for Litigations - B6 (2).pdf2 May 2023
Details of encumbrances concerned to LegalFile: 3_Declaration of Encumbrances - B6_1.pdf2 May 2023
Details of encumbrances concerned to LegalFile: 3_Declaration of Encumbrances - B6_2.pdf2 May 2023
Details of encumbrances concerned to LegalFile: 4_Declaration for Litigations - B6 (2).pdf2 May 2023
Copy of Layout Approval (in case of layout)File: 5_Layout-b6.pdf2 May 2023
Building Plan Approval / NA Order for plotted developmentFile: 6_Building-Plan.pdf2 May 2023
Commencement Certificates / NA Order for plotted developmentFile: 7_RB B4 B5 B6 CC.pdf2 May 2023
Declaration about Commencement CertificateFile: 8_B6 CC Declaration.pdf2 May 2023
Declaration in FORM BFile: 9_Form B - B6.pdf2 May 2023
CERSAI detailsFile: Declaration For Cersai - B6.pdf2 May 2023
Proforma of Agreement for saleFile: 23_FSA B6 Raunak Bliss.pdf2 May 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 34_B6 Bank Account Declaration.pdf2 May 2023
Other - TechnicalFile: 31_B6 Plot Area Declaration - B6.pdf2 May 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
RAUNAK HEIGHTS BUILDING H1OPP DNYAN SARITA COLLEGE GHODBUNDER ROAD VILLAGE OWALE THANE 40061573CompletedDec 2015Nov 2015
UNNATHI GREENS PHASE VIIOPP DNYAN SARITA COLLEGE GHODBUNDER ROAD VILLAGE VADAVALI THANE 400607333CompletedMar 2012Mar 2012

How this compares with Thane

64%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Raunak Bliss B6 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OWALE7,600+ in Thane

2 kmRaunak Bliss B6Completed 68Lapsed / revoked 25Other 47Dot size: filed unitsN

Filed coordinates, straight-line distance. 140 registered projects within 2 km.

Builder: UNNATHI ASSOCIATES

UNNATHI ASSOCIATES has 14 registrations on MahaRERA, including RAUNAK HEIGHTS and RAUNAK DELIGHT. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Litigation is declared on 7 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Raunak Bliss B6 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Raunak Bliss B6?

The registered promoter entity is UNNATHI ASSOCIATES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Raunak Bliss B6?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Raunak Bliss B6?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Raunak Bliss B6?

The professionals named in the filing: Architect: SUBHASH GUPTE; Engineer: RAJAN TIPNIS; Engineer: HARSHAL MANOHARRAO POTODE; Chartered Accountant: ANKIT GOYANKA; Chartered Accountant: Sandeep Sheth. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Raunak Bliss B6?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Raunak Bliss B6. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Raunak Bliss B6 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.