Home / Browse projects / Thane, Maharashtra / Mahavir Spring - Tulip - Phase 1

Registration lapsed No litigation declared Residential / Group Housing project

Mahavir Spring - Tulip - Phase 1

By Vinayak Developers

RG-MH-15725 · RERA P51700022994 · Last updated on MahaRERA portal: 26 Mar 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Rs 325.00 crore secured on the land, in favour of Piramal Capital and Housing Finance Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • All 3 earlier projects delivered on promise

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
11 of 11Construction stages doneevery applicable stage filed complete
63 of 405Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 230 documents Report an error

Mahavir Spring - Tulip - Phase 1 is a Residential / Group Housing project by Vinayak Developers in Thane, Maharashtra, registered with MahaRERA as P51700022994 on 8 Nov 2019. Possession was promised by 30 Dec 2025 and is now 10 months past that date. 342 of the 405 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameMahavir Spring - Tulip - Phase 1
  • TypeResidential / Group Housing
  • Location
    • Pokhran Road No. 2
    • Thane (M Corp.)
    • Thane
    • 400610
  • Pincode400610
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51700022994
  • ReraGenie IDRG-MH-15725

Builder

  • NameVinayak Developers
  • Entity typePartnership
  • PartnerPranay Vasantlal Shah
  • Other registrations16 more →
  • Completed6 of 17
  • No longer live7 lapsed, de-registered or revoked
  • Declared earlier projects10 →

Key dates

10 months past promisethis monthRegisteredNov 2019PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on8 Nov 2019
  • Promised completion30 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed230 files

Current status

84%342 of 405 units booked
94.5%Work done, per cost certificate

Figures as on 26 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Mahavir Spring - TulipNA46424050405

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 26 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Mahavir Spring - Tulip: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 26 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed350

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots350
Closed/Covered350

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area12,148 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofPiramal Capital and Housing Finance Ltd
Secured amountRs 325.00 crore
CERSAI search filedYes
Declared on21 Aug 2025

Approvals and building plan

Sanctioning authorityThane Muncipal Corporation
Permissible FSI37174.13
Proposed, not sanctioned36,774 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKailash Plaza, Ghatkopar East, Mumbai 400077
Estimated costRs 208.02 cr
Cost incurredRs 196.50 cr
Work done94.46%
BuildingWingEstimatedIncurred
Mahavir Spring - TulipNARs 208.02 crRs 196.50 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnil Hassanand Jagwani
EngineerAshok Bhanushali
Chartered AccountantRajesh Parmar
Chartered AccountantSamir Damji Malde
PartnerRole in project
Vinayak Developers-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Oct 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Oct 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 21 Dec 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed230

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 230 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate.pdf26 Mar 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf26 Mar 2026
Withdrawal Update Form 3File: CA Certificate (3).pdf26 Mar 2026
Withdrawal Update Form 1File: Architect Certificate.pdf5 Jan 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf5 Jan 2026
Withdrawal Update Form 3File: CA Certificate_compressed (2).pdf5 Jan 2026
Withdrawal Update Form 1File: Tulip- Phase 1-Form1.pdf20 Dec 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf20 Dec 2025
Withdrawal Update Form 3File: CA certificate_compressed (1).pdf20 Dec 2025
Withdrawal Update Form 1File: Form 1 Architectu0027s Certificate_002.pdf3 Oct 2025
Withdrawal Update Form 2File: Form 2 - Mahavir Spring - Tuilp- Phase-1.pdf3 Oct 2025
Withdrawal Update Form 3File: Form 3 - Mahavir Spring - Tuilp- Phase-1.pdf3 Oct 2025
Withdrawal Update Form 1File: Form 1 Architectu0027s Certificate_002.pdf1 Oct 2025
Withdrawal Update Form 1File: Form 1 Architectu0027s Certificate_002.pdf1 Oct 2025
Withdrawal Update Form 2File: Form 2 - Mahavir Spring - Tuilp- Phase-1.pdf1 Oct 2025
Withdrawal Update Form 2File: Form 2 - Mahavir Spring - Tuilp- Phase-1.pdf1 Oct 2025
Withdrawal Update Form 3File: Form 3 - Mahavir Spring - Tuilp- Phase-1.pdf1 Oct 2025
Withdrawal Update Form 3File: Form 3 - Mahavir Spring - Tuilp- Phase-1.pdf1 Oct 2025
Withdrawal Update Form 1File: Form 1 Architectu0027s Certificate_002.pdf30 Sep 2025
Withdrawal Update Form 1File: Form 1 Architectu0027s Certificate_002.pdf30 Sep 2025
Withdrawal Update Form 2File: Form 2 - Mahavir Spring - Tuilp- Phase-1.pdf30 Sep 2025
Withdrawal Update Form 2File: Form 2 - Mahavir Spring - Tuilp- Phase-1.pdf30 Sep 2025
Withdrawal Update Form 3File: Form 3 - Mahavir Spring - Tuilp- Phase-1.pdf30 Sep 2025
Withdrawal Update Form 3File: Form 3 - Mahavir Spring - Tuilp- Phase-1.pdf30 Sep 2025
Withdrawal Update Form 1File: Architect Certificate.pdf29 Sep 2025
Withdrawal Update Form 2File: Engineer Certifcate.pdf29 Sep 2025
Withdrawal Update Form 3File: Form 3 - Mahavir Spring - Tuilp- Phase-1.pdf29 Sep 2025
Withdrawal Update Form 1File: Architect Certificate.pdf9 Sep 2025
Withdrawal Update Form 2File: Engineer Certifcate.pdf9 Sep 2025
Withdrawal Update Form 3File: Form 3 - Mahavir Spring - Tuilp- Phase-1.pdf9 Sep 2025
Form 1File: Architect Certificate.pdf4 Jul 2025
Form 2File: Engineer Certifcate.pdf4 Jul 2025
Form 3File: CA Certificate.pdf4 Jul 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and unsold.pdf4 Jul 2025
Engineer Certifcate29 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf24 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf24 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf11 Apr 2025
CERSAI detailsFile: Cersai Report.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf24 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf24 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf17 Jan 2025
CERSAI detailsFile: CERSAI Report.pdf17 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf21 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf20 Dec 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf20 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf2 Dec 2024
CERSAI detailsFile: CERSAI Report.pdf2 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf5 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf3 Aug 2024
CERSAI detailsFile: CERSAI Report.pdf3 Aug 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf3 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf3 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf22 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf22 Apr 2024
CERSAI detailsFile: CERSAI Report.pdf22 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf22 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf22 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 (2022-23).pdf26 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf24 Feb 2024
CERSAI detailsFile: CERSAI Report.pdf24 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf24 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf24 Feb 2024
Building plan approvalFile: 1.pdf21 Dec 2023
Building plan approvalFile: 2.pdf21 Dec 2023
Building plan approvalFile: 3.pdf21 Dec 2023
Building plan approvalFile: 8.pdf21 Dec 2023
Building plan approvalFile: 15.pdf21 Dec 2023
Building plan approvalFile: 16.pdf21 Dec 2023
Building plan approvalFile: 17.pdf21 Dec 2023
Building plan approvalFile: 18.pdf21 Dec 2023
Building plan approvalFile: 19.pdf21 Dec 2023
Building plan approvalFile: 20.pdf21 Dec 2023
Building plan approvalFile: 21.pdf21 Dec 2023
Building plan approvalFile: 22.pdf21 Dec 2023
Building plan approvalFile: 23.pdf21 Dec 2023
Building plan approvalFile: 24.pdf21 Dec 2023
Building plan approvalFile: 25.pdf21 Dec 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Mahavir Millenium - IMPERIAVasant Vihar Next to Garden Enclaves Pokhran Road No 2 Thane W 40060189CompletedDec 2015Dec 2015
Mahavir Millenium - IVANAVasant Vihar Next to Garden Enclaves Pokhran Road No 2 Thane W 40060166CompletedMar 2009Mar 2009
Mahavir Millenium - ISRAVasant Vihar Next to Garden Enclaves Pokhran Road No 2 Thane W 40060154CompletedMar 2009Mar 2009

How this compares with Thane

84%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is among them

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Mahavir Spring - Tulip - Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Pokhran Road No. 27,600+ in Thane

2 kmMahavir Spring - Tulip -Completed 112Lapsed / revoked 53Other 106Dot size: filed unitsN

Filed coordinates, straight-line distance. 271 registered projects within 2 km.

Builder: Vinayak Developers

Vinayak Developers has 17 registrations on MahaRERA, including Durvankur Apartment and Jessika Chs.Ltd.. Its filings disclose 10 earlier MahaRERA projects: declares 10 of 10 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What does it mean that Mahavir Spring - Tulip - Phase 1 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Mahavir Spring - Tulip - Phase 1 is delayed beyond 30 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Mahavir Spring - Tulip - Phase 1?

The registered promoter entity is Vinayak Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Mahavir Spring - Tulip - Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Mahavir Spring - Tulip - Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Mahavir Spring - Tulip - Phase 1?

The professionals named in the filing: Architect: Anil Hassanand Jagwani; Engineer: Ashok Bhanushali; Chartered Accountant: Rajesh Parmar; Chartered Accountant: Samir Damji Malde. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Mahavir Spring - Tulip - Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Mahavir Spring - Tulip - Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Mahavir Spring - Tulip - Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.