RASHMI CELESTIA
RG-MH-05413 · RERA P51800051034 · Last updated on MahaRERA portal: 4 Aug 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 14 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RASHMI CELESTIA is a Others project by Modi's Navnirman Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800051034 on 22 May 2023. Possession is promised by 31 Oct 2026. The completion date has moved by 14 months from the original filing. 37 of the 84 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.
At a glance
Project
- NameRASHMI CELESTIA
- TypeOthers
- Location
- TPS III
- LOKMANYA TILAK ROAD
- OPP. GANESH DARSHAN
- BORIVALI WEST
- Borivali
- Mumbai Suburban
- 400092
- Pincode400092
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800051034
- ReraGenie IDRG-MH-05413
Builder
- NameModi's Navnirman Limited
- Entity typeCompany
- CINU45203MH2022PLC377939
- GSTIN27AAPCM5259D1Z6
- CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
- DirectorsDINESH CHUNILAL MODI, MAHEK DINESH MODI
- Other registrations7 more →
- Completed1 of 8
- Declared earlier projects4 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 May 2023
- Promised completion31 Oct 2026
- Revised completionRevised to 31 Oct 2026 (originally 11 Aug 2025)
- Buildings1 building record
- Documents filed78 files
Current status
Figures as on 4 Aug 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RASHMI CELESTIA | NA | 16 | 16 | 64 | 20 | 84 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 11 construction stages are filed complete.
RASHMI CELESTIA: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 4 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed134
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| THE DATTANI APARTMENT NO 1 CO-OP HSG. SOC. LTD | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RASHMI CELESTIA | NA | Rs 31.62 cr | Rs 38.47 cr |
| - | NA | Rs 1.31 cr | Rs 1.29 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SANJAY B SHAH |
| Architect | SANJAY SHAH |
| Engineer | Hiren M. Tanna |
| Engineer | HIREN MOHANLAL TANNA |
| Chartered Accountant | NEHALI & CO |
| Chartered Accountant | NEHALI DOSHI |
| Chartered Accountant | DGMS & CO |
| Partner | Role in project |
|---|---|
| Modi's Navnirman Limited | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThe delay in the completion of the project is primarily due to prolonged timelines in obtaining mandatory statutory approvals from various government authorities. Although all required applications and supporting documents were submitted well within the stipulated timeframes, certain key approvals-including Municipal Building Plan Approval, Fire NUC, and other essential infrastructure-related permissiопз-were still pending. These approvals are critical prerequisites for initiating and continuing various stages of the construction process. The delays are administrative in nature and largely bey
Reason as filed by the promoterOC Recived
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 13 Feb 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 20 Mar 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Apr 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2026
Documents filed78
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: RC - Declaration for Non filling of QPR.pdf | 4 Aug 2026 |
| Withdrawal Update Form 2File: RC - Declaration for Non filling of QPR.pdf | 4 Aug 2026 |
| Withdrawal Update Form 3File: RC - Declaration for Non filling of QPR.pdf | 4 Aug 2026 |
| Form 2A (FY 2025-2026)File: 2A 25-26.pdf | 28 Jul 2026 |
| Form 5 (FY 2025-2026)File: Rashmi Celestia - Signed.pdf | 4 Jun 2026 |
| Withdrawal Update Form 1File: Architect certificate - Rashmi Celestia.pdf | 26 May 2026 |
| Withdrawal Update Form 2File: FORM 2 Engineer Certificate - Rashmi Celestia.pdf | 26 May 2026 |
| Withdrawal Update Form 3File: Revised 22-05-2026CA certificate Rashmi celestia_March 26.pdf | 26 May 2026 |
| Withdrawal Update Form 1File: Architect Certificate Rashmi Celestia.pdf | 24 Mar 2026 |
| Withdrawal Update Form 2File: RERA FORM 2 - Oct to Dec-25 RASHMI CELESTIA signed.pdf | 24 Mar 2026 |
| Withdrawal Update Form 3File: Signed CA certificate Rashmi celestia_Dec25-signed.pdf | 24 Mar 2026 |
| Form 5 (FY 2024-2025)File: Rashmi Celestia Form 5 dsc.pdf | 6 Oct 2025 |
| Withdrawal Update Form 1File: form 1.pdf | 3 Sep 2025 |
| Withdrawal Update Form 2File: form 2.pdf | 3 Sep 2025 |
| Withdrawal Update Form 3File: form 3.pdf | 3 Sep 2025 |
| Form 1File: Architect Certificate JUNE 25.pdf | 30 Aug 2025 |
| Form 2File: RASHMI CELESTIA FORM 2.pdf | 30 Aug 2025 |
| Form 3File: ca form 3 june 25.pdf | 30 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Disclosure JUNE25.pdf | 30 Aug 2025 |
| Form 1File: form 1.PDF | 12 Aug 2025 |
| Form 2File: form 2.pdf | 12 Aug 2025 |
| Form 3File: Form 3.pdf | 12 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory disclosure format.PDF | 12 Aug 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.PDF | 8 Apr 2025 |
| Layout approvalFile: Rashmi Celestia - Approved Plan_1-1.pdf | 20 Mar 2025 |
| Layout approvalFile: Rashmi Celestia - Approved Plan_2-2.pdf | 20 Mar 2025 |
| Layout approvalFile: Rashmi Celestia - Approved Plan_3-3.pdf | 20 Mar 2025 |
| Layout approvalFile: Rashmi Celestia - Approved Plan_4-end.pdf | 20 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Rashmi Celestia - Approved Plan_1-1.pdf | 20 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Rashmi Celestia - Approved Plan_2-2.pdf | 20 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Rashmi Celestia - Approved Plan_3-3.pdf | 20 Mar 2025 |
| Copy of Layout Approval (in case of layout)File: Rashmi Celestia - Approved Plan_4-end.pdf | 20 Mar 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: FurtherCC_signed 17th Floor.pdf | 20 Mar 2025 |
| Proforma of Agreement for saleFile: REVISED FINAL DRAFT FOR SALE FLAT AGREEMENT.pdf | 20 Mar 2025 |
| Copy of the legal title reportFile: Title Certificate - Dattani Apartment (Rashmi Celestia).pdf | 13 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 14 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 10 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 8 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: CA form 5 Rashmi Celestia dsc.pdf | 11 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 16 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 11 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf | 9 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf | 9 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 23-24.pdf | 2 May 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory disclosure format.pdf | 15 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.PDF | 12 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf | 12 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 11 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed_CA Certificate - Rashmi Celestia Dec'23.pdf | 11 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate - Rashmi Celestia Signed.pdf | 9 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate - Rashmi Celestia Signed.pdf | 9 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form2 - Rashmi Celestia (1).pdf | 13 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate - Rashmi Celestia (1).pdf | 13 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Rashmi Celestia.pdf | 7 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Rashmi Celestia Engineer Form 2.pdf | 19 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RASHMI CELESTIA FORM 1.pdf | 13 Jul 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RASHMI CELESTIA FORM 3.pdf | 13 Jul 2023 |
| Copy of the legal title reportFile: Title Report Changed.pdf | 9 May 2023 |
| Proforma of Agreement for saleFile: Draft Rashmi Celetia Agreement for Sale RERA.pdf | 9 May 2023 |
| Details of encumbrances concerned to FinanceFile: No encumbrance self declaration.pdf | 26 Apr 2023 |
| Details of encumbrances concerned to LegalFile: No encumbrance self declaration.pdf | 26 Apr 2023 |
| CERSAI detailsFile: CERSAI DECLARATION.pdf | 26 Apr 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A DOI.pdf | 26 Apr 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation report allotment letter.pdf | 26 Apr 2023 |
| Deviation Report with respect to model copy of AgreementFile: No deviation report for agrement for sale.pdf | 26 Apr 2023 |
| Layout approvalFile: IOD Drawing.pdf | 25 Apr 2023 |
| Copy of Layout Approval (in case of layout)File: IOD Drawing.pdf | 25 Apr 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: 2374913_FirstCC_signed.pdf | 25 Apr 2023 |
| Declaration about Commencement CertificateFile: CC COVERING LETTER.pdf | 25 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate - Rashmi Celestia reg.pdf | 14 Apr 2023 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL NEW.pdf | 14 Apr 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DETAILS.pdf | 14 Apr 2023 |
| Building plan approvalFile: 2349995_IOD_signed.pdf | 11 Apr 2023 |
| PAN CardFile: PAN Card.pdf | 11 Apr 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 2349995_IOD_signed.pdf | 11 Apr 2023 |
| Declaration in FORM BFile: FORM B.pdf | 11 Apr 2023 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| RASHMI SIGNATUREP51800077248 | MALAD, Mumbai Suburban | 210 | Jul 2024 | Ongoing | Aug 2027 | Not due yet |
| RASHMI DELIGHTP51800079683 | Kandivali (W), Mumbai Suburban | 43 | Mar 2025 | Ongoing | Dec 2026 | Not due yet |
| RASHMI MANORATHP51800078598 | BORIVALI, Mumbai Suburban | 87 | Dec 2024 | Ongoing | Aug 2026 | Not delivered |
| RASHMI SQUAREP51800054722 | BORIVALI (WEST), Mumbai Suburban | 67 | Feb 2024 | Ongoing | May 2026 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 7 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 78 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RASHMI CELESTIA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near BORIVALI WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 482 registered projects within 2 km.
Hiranandani Bluecrest
SHODEN DEVELOPERS PRIVATE LIMITED
KANAKIA PRIVAASA TOWER 1 & 2
KANAKIA TRANSPARENT DEVELOPERS PRIVATE LIM
BHOOMI AIRAVAT
Bhoomi Shashwat Estate Private limited
Shraddha Paradise
Shraddha Prime Projects Limited
UNIQUE REGALIA
UNIQUE SHANTI DEVELOPERS LLP
NICCO VANASHRI AND NICCO HEIGHTS
NEW INDIA CONSTRUCTION COMPANY
See every Mumbai Suburban project, with the district possession charts
Builder: Modi's Navnirman Limited
Modi's Navnirman Limited has 8 registrations on MahaRERA, including RASHMI VASUDEO and RASHMI CELESTIA. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if RASHMI CELESTIA is delayed beyond 31 Oct 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RASHMI CELESTIA?
The registered promoter entity is Modi's Navnirman Limited, a company as per the filing. Its CIN U45203MH2022PLC377939 and GSTIN 27AAPCM5259D1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RASHMI CELESTIA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RASHMI CELESTIA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RASHMI CELESTIA?
The professionals named in the filing: Architect: SANJAY B SHAH; Architect: SANJAY SHAH; Engineer: Hiren M. Tanna; Engineer: HIREN MOHANLAL TANNA; Chartered Accountant: NEHALI & CO; Chartered Accountant: NEHALI DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RASHMI CELESTIA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback