Home / Browse projects / Mumbai Suburban, Maharashtra / RASHMI SQUARE

Registered No litigation declared Others project

RASHMI SQUARE

By Modi's Navnirman Limited

RG-MH-06899 · RERA P51800054722 · Last updated on MahaRERA portal: 30 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2027Possession promisedmoved 12 months from the original
11 of 22Construction stages doneacross 2 buildings; furthest along: Internal walls, 85%
29 of 67Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

RASHMI SQUARE is a Others project by Modi's Navnirman Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800054722 on 6 Feb 2024. Possession is promised by 28 May 2027. The completion date has moved by 12 months from the original filing. 38 of the 67 units on this registration are recorded sold or booked, and 11 of 22 construction stages are filed complete.

At a glance

Project

  • NameRASHMI SQUARE
  • TypeOthers
  • Location
    • JAYRAJ NAGAR
    • OFF NEW LINK ROAD
    • BORIVALI (WEST)
    • Borivali
    • Mumbai Suburban
    • 400091
  • Pincode400091
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800054722
  • ReraGenie IDRG-MH-06899

Builder

  • NameModi's Navnirman Limited
  • Entity typeCompany
  • CINU45203MH2022PLC377939
  • GSTIN27AAPCM5259D1Z6
  • CIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • DirectorsDINESH CHUNILAL MODI, MAHEK DINESH MODI
  • Other registrations7 more →
  • Completed1 of 8
  • Declared earlier projects4 →

Key dates

this monthRegisteredFeb 2024First promiseMay 2026Revised toMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Feb 2024
  • Promised completion28 May 2027
  • Revised completionRevised to 28 May 2027 (originally 28 May 2026)
  • Buildings2 building records
  • Documents filed70 files

Current status

57%38 of 67 units booked
80.0%Work done, per cost certificate

Figures as on 30 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA117271340
B WINGNA11727027

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 30 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Internal walls, at 85%.

A WING78%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%
B WING70%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.80%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 30 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes80%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes80%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed143

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots143
Closed/Covered143
BuildingClosed/CoveredTotal
A WING7272
B WING7171

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,236 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jun 2025
LandownerVillageDistrict
OM SHRADDHA CO-OPERATIVE HOUSING SOCIETY LIMITEDBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI8358.26
Proposed, not sanctioned3,871 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchARKADE BHOOMI HEIGHTS SHOP NO 1 2 AND 3 PARTLY M G ROAD DHANUKARWADI KHANDIVALI WEST MUMBAI 400067
Estimated costRs 404.32 cr
Cost incurredRs 323.51 cr
Work done80.01%
BuildingWingEstimatedIncurred
A WINGNARs 199.25 crRs 159.94 cr
B WINGNARs 199.25 crRs 159.94 cr
-NARs 5.82 crRs 3.64 cr

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSANJAY B SHAH
Architectmahek modi
EngineerHiren M. Tanna
EngineerHIREN MOHANLAL TANNA
Chartered AccountantNEHALI AND CO
Chartered AccountantNEHALI DOSHI
Chartered AccountantDGMS & CO
PartnerRole in project
Modi's Navnirman Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA28052621136May 2026 → May 2027

Reason as filed by the promoterWe, MODIS NAVNIRMAN LTD, are the promoters of the real estate project known as "RASHMI SQUARE" bearing Maha RERA Registration No. P51800054722. The delay in the completion of the aforesaid project has primarily arisen on account of discrepancies observed in the land area as reflected in the official records vis-à-vis the actual land particulars required for the project. The resolution of these discrepancies necessitated detailed verification, reconciliation of records, and procedural compliance with the concerned authorities before further progress on the project could be undertaken. The proce

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 May 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 28 May 2027

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Rera certificate -Rashmi Square_Signed.pdf30 Jul 2026
Withdrawal Update Form 2File: 260717_ Engineer Form 2_RASHMI SQUARE-Signed.pdf30 Jul 2026
Withdrawal Update Form 3File: RASHMI SQUARE - Signed CA Certificate.pdf30 Jul 2026
Form 5 (FY 2025-2026)File: Rashmi Square - Signed.pdf4 Jun 2026
Commencement certificateFile: Full cc 17 th floor.pdf4 May 2026
Layout approvalFile: Rashmi Square-Plan Copy 08-04-2026_11zon_11zon (1).pdf4 May 2026
Withdrawal Update Form 1File: Rashmi Square- Architect certificate- sign copy-Qtr 4.pdf4 May 2026
Withdrawal Update Form 2File: Rashmi Square-Engineer- sign opy- Qtr-4.pdf4 May 2026
Withdrawal Update Form 3File: Rashmi Square-CA Certificate-sign copy-Qtr-4.pdf4 May 2026
Withdrawal Update Form 1File: Rera Certificate - Rashmi Square form 1.pdf20 Mar 2026
Withdrawal Update Form 2File: RERA FORM 2 - Oct to Dec-25 RASHMI SQUARE signed.pdf20 Mar 2026
Withdrawal Update Form 3File: Signed CA Certificate-Rashmi Square_Dec25 - signed.pdf20 Mar 2026
Withdrawal Update Form 1File: Rera certificate Rashmi Square pdf signed.pdf6 Dec 2025
Withdrawal Update Form 2File: ENGINEER CERTIFICATE PDF 01-12-25-dsc.pdf6 Dec 2025
Withdrawal Update Form 3File: CA Certificate 04-12-25 pdf-dsc.pdf6 Dec 2025
Form 5 (FY 2024-2025)File: Rashmi Square Form 5 dsc.pdf6 Oct 2025
Layout approvalFile: drawing 16th floor -29-05-25_1-2.pdf21 Jul 2025
Layout approvalFile: drawing 16th floor -29-05-25_3-4.pdf21 Jul 2025
Layout approvalFile: drawing 16th floor -29-05-25_3-4.pdf21 Jul 2025
Layout approvalFile: drawing 16th floor -29-05-25_5-end.pdf21 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf16 Apr 2025
Layout approvalFile: Rashmi Square Ammend Plans_1-1.pdf15 Apr 2025
Layout approvalFile: Rashmi Square Ammend Plans_2-2.pdf15 Apr 2025
Layout approvalFile: Rashmi Square Ammend Plans_3-3.pdf15 Apr 2025
Layout approvalFile: Rashmi Square Ammend Plans_4-4.pdf15 Apr 2025
Layout approvalFile: Rashmi Square Ammend Plans_5-5.pdf15 Apr 2025
Layout approvalFile: Rashmi Square Ammend Plans_6-end.pdf15 Apr 2025
Copy of Layout Approval (in case of layout)File: Rashmi Square Ammend Plans_1-1.pdf15 Apr 2025
Copy of Layout Approval (in case of layout)File: Rashmi Square Ammend Plans_2-2.pdf15 Apr 2025
Copy of Layout Approval (in case of layout)File: Rashmi Square Ammend Plans_3-3.pdf15 Apr 2025
Copy of Layout Approval (in case of layout)File: Rashmi Square Ammend Plans_4-4.pdf15 Apr 2025
Copy of Layout Approval (in case of layout)File: Rashmi Square Ammend Plans_5-5.pdf15 Apr 2025
Copy of Layout Approval (in case of layout)File: Rashmi Square Ammend Plans_6-end.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.PDF8 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - RASHMI SQUARE.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf15 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf11 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf9 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf9 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: form 2A 23-24.pdf3 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2-RASHMI SQUARE dsc.pdf15 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SIGNED CA CERTIFICATE DSC -13-04-24.pdf13 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf11 Apr 2024
Disclosure of sold/ booked inventoryFile: Inventory.pdf26 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed CA Certificate-Rashmi Square.pdf20 Jan 2024
Proforma of Agreement for saleFile: RASHMI SQUARE RERA DRAFT SALE AGREEMENT (1) (1) (1).pdf29 Dec 2023
Deviation Report with respect to Allotment letterFile: No Deviation report allotment letter.pdf29 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report for agreement for sale (2) (1).pdf29 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A DOI (24).pdf28 Dec 2023
Copy of the legal title reportFile: Om Shraddha New Title Certificate.pdf26 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf26 Dec 2023
Declaration about Commencement CertificateFile: CC COVERING LETTER (9).pdf26 Dec 2023
Declaration in FORM BFile: form B (14).PDF26 Dec 2023
Building plan approvalFile: Om Shraddha IOD.pdf14 Oct 2023
Layout approvalFile: Drawing (6) (2)_1-3.pdf14 Oct 2023
Layout approvalFile: Drawing (6) (2)_4-end.pdf14 Oct 2023
PAN CardFile: Company PAN Card.pdf14 Oct 2023
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE (3).pdf14 Oct 2023
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE (3).pdf14 Oct 2023
Copy of Layout Approval (in case of layout)File: Drawing (6) (2)_1-3.pdf14 Oct 2023
Copy of Layout Approval (in case of layout)File: Drawing (6) (2)_4-end.pdf14 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Om Shraddha IOD.pdf14 Oct 2023
CERSAI detailsFile: CREASAI.pdf14 Oct 2023
Proforma of Allotment letterFile: Allotment Letter Pdf.pdf14 Oct 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: BANK DETAILS 02-1-24.pdf14 Oct 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
RASHMI SIGNATUREP51800077248MALAD, Mumbai Suburban210Jul 2024OngoingAug 2027Not due yet
RASHMI DELIGHTP51800079683Kandivali (W), Mumbai Suburban43Mar 2025OngoingDec 2026Not due yet
RASHMI MANORATHP51800078598BORIVALI, Mumbai Suburban87Dec 2024OngoingAug 2026Not delivered

How this compares with Mumbai Suburban

57%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RASHMI SQUARE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI (WEST)6,700+ in Mumbai Suburban

2 kmRASHMI SQUARECompleted 128Lapsed / revoked 73Other 192Dot size: filed unitsN

Filed coordinates, straight-line distance. 393 registered projects within 2 km.

Builder: Modi's Navnirman Limited

Modi's Navnirman Limited has 8 registrations on MahaRERA, including RASHMI VASUDEO and RASHMI CELESTIA. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if RASHMI SQUARE is delayed beyond 28 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RASHMI SQUARE?

The registered promoter entity is Modi's Navnirman Limited, a company as per the filing. Its CIN U45203MH2022PLC377939 and GSTIN 27AAPCM5259D1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RASHMI SQUARE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RASHMI SQUARE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RASHMI SQUARE?

The professionals named in the filing: Architect: SANJAY B SHAH; Architect: mahek modi; Engineer: Hiren M. Tanna; Engineer: HIREN MOHANLAL TANNA; Chartered Accountant: NEHALI AND CO; Chartered Accountant: NEHALI DOSHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RASHMI SQUARE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RASHMI SQUARE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RASHMI SQUARE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.