Home / Browse projects / Mumbai Suburban, Maharashtra / RASHMI MANORATH

Registered No litigation declared Residential / Group Housing project

RASHMI MANORATH

By Modi's Navnirman Limited

RG-MH-23290 · RERA P51800078598 · Last updated on MahaRERA portal: 11 Aug 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Aug 2027Possession promisedmoved 12 months from the original
3 of 11Construction stages donefurthest along: Plinth, 90%
84 of 87Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

RASHMI MANORATH is a Residential / Group Housing project by Modi's Navnirman Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800078598 on 27 Dec 2024. Possession is promised by 11 Aug 2027. The completion date has moved by 12 months from the original filing. 3 of the 87 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameRASHMI MANORATH
  • TypeResidential / Group Housing
  • Location
    • AT NEAR DATTAPADA SUB WAY
    • BORIVALI
    • Magathane
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • RERA no.P51800078598
  • ReraGenie IDRG-MH-23290

Builder

  • NameModi's Navnirman Limited
  • Entity typeCompany
  • CINU45203MH2022PLC377939
  • GSTIN27AAPCM5259D1Z6
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • ChairpersonDINESHKUMAR MODI
  • DirectorMAHEK MODI
  • Other registrations7 more →
  • Completed1 of 8
  • Declared earlier projects4 →

Key dates

this monthRegisteredDec 2024First promiseAug 2026Revised toAug 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Dec 2024
  • Promised completion11 Aug 2027
  • Revised completionRevised to 11 Aug 2027 (originally 11 Aug 2026)
  • Buildings1 building record
  • Documents filed72 files

Current status

3%3 of 87 units booked
42.1%Work done, per cost certificate

Figures as on 11 Aug 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RASHMI MANORATHNA191687087

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Aug 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Plinth, at 90%.

RASHMI MANORATH: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth90%
Stilt Floor100%
Slabs of Super Structure68%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises45%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks68%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.25%

Progress on shared amenities15

As on 11 Aug 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes70%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes50%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes25%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed71

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots71
Closed/Covered71

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,869 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on11 Aug 2025
LandownerVillageDistrict
SHREE MANORATH CHSLBorivaliMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI5550.39
Proposed, not sanctioned5,043 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchARKADE BHOOMI HEIGHTS SHOP NO 1 2 AND 3 PARTLY M G ROAD DHANUKARWADI KHANDIVALI WEST MUMBAI 400067
Estimated costRs 30.38 cr
Cost incurredRs 12.79 cr
Work done42.11%
BuildingWingEstimatedIncurred
RASHMI MANORATHNARs 26.27 crRs 11.99 cr
-NARs 4.11 crRs 80.39 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPACE VISION
Engineerhiren tanna
EngineerAnant Patere
Chartered AccountantNEHALI AND CO
Chartered AccountantNehali Doshi
Chartered AccountantDGMS & CO
PartnerRole in project
Modi's Navnirman Limited-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA11082622094Aug 2026 → Aug 2027

Reason as filed by the promoterRespected Sir, We, Modis Navnirman Limited, are the promoters of the real estate project known as "Rashmi Manorath bearing Maha RERA Registration No. P51800078598, The delay in the completion of the project is primarily due to prolonged timelines in obtaining mandatory statutory approvals from various government authorities. Although all required applications and supporting documents were submitted well within the stipulated timeframes. certain key approvals - including Municipal Building Plan Approval, Fire NOC, and other essential infrastructure related permissions were still pending. These

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 May 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Jul 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 May 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 11 Aug 2027

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: form 2A 25-26.pdf11 Aug 2026
Withdrawal Update Form 1File: SIGNED - ARCHITECT CERTIFICATE-APR 26 TO JUNE 26.pdf28 Jul 2026
Withdrawal Update Form 2File: 260718_Engineer Form 2_MANORATH-Signed.pdf28 Jul 2026
Withdrawal Update Form 3File: RASHMI MANORATH - Signed CA Certificate.pdf28 Jul 2026
Form 5 (FY 2025-2026)File: Rashmi Manorath - Signed.pdf4 Jun 2026
Withdrawal Update Form 1File: Rashmi Manorath-Architect Certificate-Signed Copy-Qtr-4.pdf3 Jun 2026
Withdrawal Update Form 2File: RASHMI MANORATH-Engineer-Signed copy-Qtr-4.pdf3 Jun 2026
Withdrawal Update Form 3File: CA form 3 rashmi manorath.pdf3 Jun 2026
Commencement certificateFile: cc 1.pdf8 May 2026
Layout approvalFile: Drawing_1-2 highlighted.pdf8 May 2026
Layout approvalFile: Drawing_3-end.pdf8 May 2026
Withdrawal Update Form 1File: Rashmi Manorath-Architect Certificate-Signed Copy-Qtr-4.pdf8 May 2026
Withdrawal Update Form 2File: RASHMI MANORATH-Engineer-Signed copy-Qtr-4.pdf8 May 2026
Withdrawal Update Form 3File: M-Signed CA Certificate Rashmi Manorath m26.pdf8 May 2026
Withdrawal Update Form 1File: Architect Form - Rashmi Manorath - signed.pdf23 Feb 2026
Withdrawal Update Form 2File: RERA FORM 2 - Oct to Dec-25 RASHMI MANORATH signed.pdf23 Feb 2026
Withdrawal Update Form 3File: Signed CA Certificate Rashmi Manorath dec 25 - signed.pdf23 Feb 2026
Withdrawal Update Form 1File: Rashmi Manorath Architect Certificate 06 11 25 pdf signed.pdf27 Nov 2025
Withdrawal Update Form 2File: RASHMI MANORATH RERA FORM 2.pdf27 Nov 2025
Withdrawal Update Form 3File: Signed CA Certificate Rashmi Manorath sept25 - signed.pdf27 Nov 2025
Withdrawal Update Form 1File: Architect Certificate - Rashmi Manorath.pdf7 Oct 2025
Withdrawal Update Form 2File: Engineer Form 2_MANORATH 09-09-2025.pdf7 Oct 2025
Withdrawal Update Form 3File: Signed CA Certificate Rashmi Manorath June 25 09-09-2025.pdf7 Oct 2025
Form 5 (FY 2024-2025)File: Rashmi Manorath Form 5 dsc.pdf6 Oct 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EC-SIGNED.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf16 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf9 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf9 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DECLRATION.pdf29 Oct 2024
Copy of the legal title reportFile: 1 Other - Legal (2).pdf24 Oct 2024
Other - LegalFile: 261 PRC (3).pdf24 Oct 2024
Other - LegalFile: 96 PRC (1).pdf24 Oct 2024
Other - TechnicalFile: ANNEXURE.pdf31 Jul 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT 'B.pdf31 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 2024-07-29 16-40 (1).pdf29 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final ca.pdf27 Jul 2024
Layout approvalFile: Approved Plan_5-end.pdf23 Jul 2024
Layout approvalFile: Approved Plan_4-4.pdf23 Jul 2024
Layout approvalFile: Approved Plan_3-3.pdf23 Jul 2024
Layout approvalFile: Approved Plan_2-2.pdf23 Jul 2024
Layout approvalFile: Approved Plan_1-1 (2).pdf23 Jul 2024
Copy of the legal title reportFile: IMG_0001.pdf23 Jul 2024
Copy of Layout Approval (in case of layout)File: Approved Plan_1-1 (2).pdf23 Jul 2024
Copy of Layout Approval (in case of layout)File: Approved Plan_2-2.pdf23 Jul 2024
Copy of Layout Approval (in case of layout)File: Approved Plan_3-3.pdf23 Jul 2024
Copy of Layout Approval (in case of layout)File: Approved Plan_4-4.pdf23 Jul 2024
Copy of Layout Approval (in case of layout)File: Approved Plan_5-end.pdf23 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 13 Architech Certificate - NEHA (1).pdf23 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 - RASHMI MANORATH ENGINEERING CERTIFICATE _HIREN TANNA - signed.pdf23 Jul 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure for secured.pdf23 Jul 2024
Building plan approvalFile: IOD.pdf4 Jul 2024
PAN CardFile: SHREE MODIS NAVNIRMAN PVT LTD - PAN CARD.pdf4 Jul 2024
Details of encumbrances concerned to FinanceFile: NO ENCUMBRANCE SELF DECLARATION.pdf4 Jul 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (12) (3).pdf4 Jul 2024
Declaration in FORM BFile: Form 3.pdf4 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: Manorath CC (1).pdf4 Jul 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD.pdf4 Jul 2024
Declaration about Commencement CertificateFile: commencement certificate- NEHA.pdf4 Jul 2024
CERSAI detailsFile: CERSAI DECLARATION.pdf4 Jul 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf4 Jul 2024
Deviation Report with respect to Allotment letterFile: DEVIATION Report - NEHA.pdf4 Jul 2024
Details of encumbrances concerned to LegalFile: NO ENCUMBRANCE SELF DECLARATION.pdf4 Jul 2024
Deviation Report with respect to model copy of AgreementFile: DEVIATION - NEHA (1).pdf4 Jul 2024
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (56) (2) (1).pdf4 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Letter Dinesh Modi.pdf4 Jul 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Letter Mahek Modi.pdf4 Jul 2024

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 not delivered by the promised date2 under way, not due yet
ProjectLocationFlatsRegisteredStatusPromisedDelivered
RASHMI SIGNATUREP51800077248MALAD, Mumbai Suburban210Jul 2024OngoingAug 2027Not due yet
RASHMI DELIGHTP51800079683Kandivali (W), Mumbai Suburban43Mar 2025OngoingDec 2026Not due yet
RASHMI SQUAREP51800054722BORIVALI (WEST), Mumbai Suburban67Feb 2024OngoingMay 2026Not delivered

How this compares with Mumbai Suburban

3%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RASHMI MANORATH on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BORIVALI6,700+ in Mumbai Suburban

Builder: Modi's Navnirman Limited

Modi's Navnirman Limited has 8 registrations on MahaRERA, including RASHMI VASUDEO and RASHMI CELESTIA. Its filings disclose 4 earlier MahaRERA projects, none completed yet. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if RASHMI MANORATH is delayed beyond 11 Aug 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RASHMI MANORATH?

The registered promoter entity is Modi's Navnirman Limited, a company as per the filing. Its CIN U45203MH2022PLC377939 and GSTIN 27AAPCM5259D1Z6 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RASHMI MANORATH?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RASHMI MANORATH?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RASHMI MANORATH?

The professionals named in the filing: Architect: SPACE VISION; Engineer: hiren tanna; Engineer: Anant Patere; Chartered Accountant: NEHALI AND CO; Chartered Accountant: Nehali Doshi; Chartered Accountant: DGMS & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RASHMI MANORATH?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RASHMI MANORATH. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RASHMI MANORATH to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.