Home / Browse projects / RAMVANADANA RESIDENCY
RAMVANADANA RESIDENCY
RG-MH-16873 · RERA P52100027096 · Last updated on MahaRERA portal: 19 Jun 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 33 months past the filed date
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: .Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RAMVANADANA RESIDENCY is a Residential / Group Housing project by VANDANA PROPERTIES in DIGHI, 411015, registered with MahaRERA as P52100027096 on 13 Nov 2020. Possession was promised by 28 Jan 2024 and is now 33 months past that date. The completion date has moved by 12 months from the original filing.
At a glance
Project
- NameRAMVANADANA RESIDENCY
- TypeResidential / Group Housing
- Location
- DIGHI
- 411015
- Pincode411015
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100027096
- ReraGenie IDRG-MH-16873
Builder
- NameVANDANA PROPERTIES
- Entity typePartnership
- PartnersYOGITA RAMDAS SAWANT, VANDANA RAMDAS SAWANT
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on13 Nov 2020
- Promised completion28 Jan 2024
- Revised completionRevised to 28 Jan 2024 (originally 30 Jan 2023)
- Buildings1 building record
- Documents filed84 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RAMVANADANA RESIDENCY | NA | 5 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
9 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
RAMVANADANA RESIDENCY: 82% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 19 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| SAGAR HANUMANT SAWANT | - | Pune |
| KAMAL HANUMANT SAWANT | - | Pune |
| DEEPANJALI BALU BORHADE | - | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | sudesh kulange |
| Engineer | AMOL LAXMAN NIRMAL |
| Chartered Accountant | VAIBHAV MODI |
| Partner | Role in project |
|---|---|
| VANDANA PROPERTIES | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to Covid and unavailability of Workers
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Nov 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 13 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 10 Nov 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 13 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 10 Apr 2024
Documents filed84
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 84 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Final.pdf | 19 Jun 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf | 19 Jun 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf | 19 Jun 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Circular Final.pdf | 19 Jun 2025 |
| Layout approvalFile: Revised sanction copy-output.pdf | 13 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: Revised sanction copy-output.pdf | 13 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 13 Dec 2024 |
| Declaration in FORM BFile: Form B.pdf | 10 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Final.pdf | 10 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A.pdf | 10 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 5 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 .pdf | 5 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 5 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 5 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (2).pdf | 5 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 (1).pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final.pdf | 5 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Final .pdf | 5 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf | 5 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 5 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf | 5 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Final.pdf | 5 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 5 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 .pdf | 5 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29.pdf | 5 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29 (1).pdf | 5 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29 (1).pdf | 5 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29 (1).pdf | 5 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29 (2).pdf | 5 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Circular 29 (1).pdf | 5 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-24.pdf | 27 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part OC.pdf | 10 Apr 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Upload_compressed.pdf | 14 Sep 2023 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 13 Sep 2023 |
| Declaration in FORM BFile: Revised Form B_compressed.pdf | 13 Sep 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Vandana Properties 21-22 Signed.pdf | 7 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY 2020-21.pdf | 4 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY 2021-22 Q3 UPLOAD.pdf | 4 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY 2021-22 Q4 UPLOAD.pdf | 4 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY 2022-23 Q1 UPLOAD.pdf | 4 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY 2022-23 Q2 UPLOAD.pdf | 4 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY 2022-23 Q3 UPLOAD.pdf | 4 Sep 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FY 2022-2023 Q4 UPLOAD.pdf | 4 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2023 SIGN.pdf | 2 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2021 SIGN.pdf | 30 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2021 SIGN.pdf | 30 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-03-2022 SIGN.pdf | 30 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-06-2022 SIGN.pdf | 30 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 30-09-2022 SIGN.pdf | 30 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 31-12-2022 SIGN.pdf | 30 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-12-2021 SIGN.pdf | 30 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-03-2022 SIGN.pdf | 30 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30-06-2022 SIGN.pdf | 30 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 30-09-2022 SIGN.pdf | 30 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 31-12-2022 SIGN.pdf | 30 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 31-12-2021 SIGN.pdf | 30 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 31-12-2021 SIGN.pdf | 30 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 31-03-2022 SIGN.pdf | 30 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 30-06-2022 SIGN.pdf | 30 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 30-09-2022 SIGN.pdf | 30 Aug 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 31-12-2022 SIGN.pdf | 30 Aug 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Vandana Properties 21-22.pdf | 9 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Vandana 20-21 final Form 5.pdf | 2 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 Vandana Properties 21-22.pdf | 2 Jun 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf | 1 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf | 1 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: SOLD CIRCULAR.pdf | 1 Jun 2023 |
| Layout approvalFile: SANCTION COPY11.pdf | 10 Nov 2020 |
| Building plan approvalFile: SANCTION COPY11.pdf | 10 Nov 2020 |
| PAN CardFile: FIRM PAN.pdf | 10 Nov 2020 |
| Copy of the legal title reportFile: SEARCH 1.pdf | 10 Nov 2020 |
| Copy of the legal title reportFile: SEARCH 2.pdf | 10 Nov 2020 |
| Details of encumbrancesFile: ENCUMBARANCE.pdf | 10 Nov 2020 |
| Copy of Layout Approval (in case of layout)File: SANCTION COPY11.pdf | 10 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTION COPY11.pdf | 10 Nov 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT.pdf | 10 Nov 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 84 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep RAMVANADANA RESIDENCY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DIGHI
Filed coordinates, straight-line distance. 47 registered projects within 2 km.
Kohinoor Viva Pixel- Phase II
RISING ASSOCIATES
VIVACITY
REALCON LANDMARKS LLP
TRIAA VASANTAM CITY CENTER PHASE 1
Triaa Realtors LLP
QUE 101 PHASE I
ANNR Unique Realty LLP
NYATI ERA I
NYATI CONSTRUCTION PRIVATE LIMITED
ONE ARETHA PHASE 1
Triaa Landmarks LLP
Builder: VANDANA PROPERTIES
VANDANA PROPERTIES has 1 registration on MahaRERA, including RAMVANADANA RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record.
Frequently asked questions
What does it mean that RAMVANADANA RESIDENCY shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if RAMVANADANA RESIDENCY is delayed beyond 28 Jan 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RAMVANADANA RESIDENCY?
The registered promoter entity is VANDANA PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RAMVANADANA RESIDENCY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RAMVANADANA RESIDENCY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RAMVANADANA RESIDENCY?
The professionals named in the filing: Architect: sudesh kulange; Engineer: AMOL LAXMAN NIRMAL; Chartered Accountant: VAIBHAV MODI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RAMVANADANA RESIDENCY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback