Ramkrishna Park
By Atkare Sons
RG-MH-50199 · RERA P51500032929 · Last updated on MahaRERA portal: 28 Apr 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Ramkrishna Park is a Residential / Group Housing project by Atkare Sons in Aurangabad, Maharashtra, registered with MahaRERA as P51500032929 on 2 Feb 2022. The registration is recorded completed; possession was promised by 30 Dec 2024.
At a glance
Project
- NameRamkrishna Park
- TypeResidential / Group Housing
- Location
- Jatwada Road
- Honaji Nagar Harsool
- Aurangabad (M Corp.)
- Aurangabad
- 431001
- Pincode431001
- RERA no.P51500032929
- ReraGenie IDRG-MH-50199
Builder
- NameAtkare Sons
- Entity typeOthers
- Named personsSambhaji Ramkrishna Atkare, Arjun Ramkrisna Atkare, Dhanajay Ramkrishna Atkare
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on2 Feb 2022
- Promised completion30 Dec 2024
- Revised completionNone
- Buildings5 building records
- Documents filed87 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Rowhouse No 1 to 5 | NA | 3 | 0 | 0 | 0 | 0 |
| Rowhouse No 6 to 9 | NA | 3 | 0 | 0 | 0 | 0 |
| Rowhouse No 10 | NA | 3 | 0 | 0 | 0 | 0 |
| Rowhouse No 11 | NA | 3 | 0 | 0 | 0 | 0 |
| Rowhouse No 12 to 21 | NA | 3 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building5
As on 28 Apr 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
50 of 55 construction stages are filed complete across 5 buildings. The stage furthest along is Podiums (if any), at 0%.
Rowhouse No 1 to 591%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Rowhouse No 6 to 991%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Rowhouse No 1091%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Rowhouse No 1191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Rowhouse No 12 to 2191%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 28 Apr 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 80% |
| Water Supply | Yes | 80% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | Yes | 80% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 80% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Avinash Pawar |
| Engineer | Sameer Sunil Chandvadkar |
| Chartered Accountant | Narendra Navandar & Co |
| Partner | Role in project |
|---|---|
| Atkare Sons | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 21 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Jan 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 22 May 2024
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 Atkare Sons_0001.pdf | 28 Apr 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 1_compressed.pdf | 22 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 2_compressed.pdf | 22 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3_compressed.pdf | 22 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 4_compressed.pdf | 22 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 5_compressed.pdf | 22 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 6_compressed.pdf | 22 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 7_compressed.pdf | 22 May 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Adobe Scan 22 May 2024.pdf | 22 May 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: img-529150605.pdf | 26 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate_Ramkrishna Park_Pawar.pdf | 17 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CamScanner 04-17-2024 132125.pdf | 17 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate_Ramkrishna Park_08-01-2024.pdf | 17 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance_Ramkrishna Park_Devgirikar.pdf | 17 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory of RERA_Ramkrishna Park_Atkare Sons_31032024.pdf | 17 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate_Ramkrishna Park_06-10-2023.pdf | 9 Mar 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form no-3 Ramkrishna Park.pdf | 30 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Ramkrishna Park_08-01-2024.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_Ramkrishna Park_08-01-2024.pdf | 17 Jan 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate_Ramkrishna Park_08012024.pdf | 13 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory of RERA_Ramkrishna Park_Atkare Sons_31122023.pdf | 13 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form no-3 Dt -31-03-2023_.pdf | 30 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form no-3 Dt -30-06-2023_.pdf | 30 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form no-3 Dt -30-09-2023_.pdf | 30 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate of Atkare sons,_0001.pdf | 20 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate_Ramkrishna Park_06102023.pdf | 11 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_Ramkrishna Park_09102023.pdf | 11 Oct 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Sold-Unsold Inventory of RERA_Ramkrishna Park_Atkare Sons_30092023.pdf | 11 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory of RERA_Ramkrishna Park_Atkare Sons_30092023.pdf | 11 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate_Ramkrishna Park_07-01-2023.pdf | 14 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate_Ramkrishna Park_10-04-2023.pdf | 14 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate_Ramkrishna Park_10-07-2023.pdf | 14 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_Ramkrishna Park.pdf | 14 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_Ramkrishna Park_25-07-2023.pdf | 14 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate_Atkare Sons.pdf | 14 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality Assurance Certificate_Ramkrishna Park_07-07-2023.pdf | 14 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory of RERA_Ramkrishna Park_Atkare Sons_31-12-2022.pdf | 14 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory of RERA_Ramkrishna Park_Atkare Sons_31-03-2023.pdf | 14 Sep 2023 |
| Disclosure of sold/ booked inventoryFile: Sold-Unsold Inventory of RERA_Ramkrishna Park_Atkare Sons_30-06-2023.pdf | 14 Sep 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate_Atkare Sons.pdf | 14 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate_Ramkrishna Park_07-01-2023.pdf | 10 Mar 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_Ramkrishna Park_18-01-2023.pdf | 10 Mar 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate_Ramkrishna Park_07-01-2023.pdf | 10 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ramkrishna Park - 31-03-2022_0001.pdf | 10 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ramkrishna Park - 30-06-2022_0001.pdf | 10 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ramkrishna Park - 30-09-2022_0001.pdf | 10 Mar 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ramkrishna Park - 31-12-2022_0001.pdf | 10 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form - 5 - Atkare Sons - Date 10-12-2022_0001.pdf | 7 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate_Ramkrishna Park (Atkare Sons).pdf | 18 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_Ramkrishna Park (Atkare Sons).pdf | 18 Nov 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Quality Assurance Certificate_Ramanand Park (Atkare Sons).pdf | 18 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf | 17 Sep 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archi Certi.pdf | 17 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Atkare Sons Engineer Certificate .pdf | 17 Sep 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate (1).pdf | 17 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: fORM 2a.pdf | 17 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality supervisor.pdf | 17 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Atkare Sons Book Inventory 31-3-22.pdf | 17 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Atkare Sons Book Inventory 30-6-22.pdf | 17 Sep 2022 |
| Copy of the legal title reportFile: Ramkrishna Park Search Report Latest ---.pdf | 21 Jan 2022 |
| CERSAI detailsFile: Asset Based Search_1.pdf | 21 Jan 2022 |
| CERSAI detailsFile: Asset Based Search_2.pdf | 21 Jan 2022 |
| CERSAI detailsFile: CERSAI Undertaking.pdf | 21 Jan 2022 |
| Layout approvalFile: MAP 1_compressed.pdf | 19 Jan 2022 |
| Building plan approvalFile: MAP 1_compressed.pdf | 19 Jan 2022 |
| Building plan approvalFile: MAP 2_compressed.pdf | 19 Jan 2022 |
| Building plan approvalFile: MAP 3_compressed.pdf | 19 Jan 2022 |
| Building plan approvalFile: MAP 4.pdf | 19 Jan 2022 |
| Building plan approvalFile: MAP 5.pdf | 19 Jan 2022 |
| Building plan approvalFile: MAP 6_compressed.pdf | 19 Jan 2022 |
| Building plan approvalFile: MAP 7_compressed.pdf | 19 Jan 2022 |
| PAN CardFile: kyc Atkare Sons (1).pdf | 19 Jan 2022 |
| Details of encumbrancesFile: Non Encumbrance Declaration Atkare Sons -.pdf | 19 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: MAP 1_compressed.pdf | 19 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MAP 1_compressed.pdf | 19 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MAP 2_compressed.pdf | 19 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MAP 3_compressed.pdf | 19 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MAP 4.pdf | 19 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MAP 5.pdf | 19 Jan 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: MAP 6_compressed.pdf | 19 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 87 filed documents as one ZIP, foldered, with a manifest
Keep Ramkrishna Park on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Honaji Nagar Harsool1,400+ in Aurangabad
Capital Trade Centre
KRK Landmark LLP
AQ TOWN
AQ INFRASTRUCTURE PRIVATE LIMITED
KALYANI SAI VISHWA
RAJASHREE UDYOG
AMRUT SAI PLAZA PH 2
Shree Amrut Sai Developer Pvt.Ltd
PRASSANA HIGH CLASS CITY PHASE - I
SHRI KRISHNA NAGAR SAHAKARI GRAH NIRMAN SA
SHRIRAM RESIDENCY
UNIQUE BUILDCON
See every Aurangabad project, with the district possession charts
Builder: Atkare Sons
Atkare Sons has 1 registration on MahaRERA, including Ramkrishna Park. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if Ramkrishna Park is delayed beyond 30 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Ramkrishna Park?
The registered promoter entity is Atkare Sons, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Ramkrishna Park?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Ramkrishna Park?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Ramkrishna Park?
The professionals named in the filing: Architect: Avinash Pawar; Engineer: Sameer Sunil Chandvadkar; Chartered Accountant: Narendra Navandar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Ramkrishna Park?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback