Home / Browse projects / Ram Setu Bhavan

Registered No litigation declared Residential / Group Housing project

Ram Setu Bhavan

By GBD INFRACON LLP

RG-MH-07380 · RERA P51900055203 · Last updated on MahaRERA portal: 14 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: .
Dec 2028Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 75%
52 of 59Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 95 documents Report an error

Ram Setu Bhavan is a Residential / Group Housing project by GBD INFRACON LLP in MATUNGA DIVISION,DADAR EAST, 400014, registered with MahaRERA as P51900055203 on 11 Mar 2024. Possession is promised by 31 Dec 2028. 7 of the 59 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NameRam Setu Bhavan
  • TypeResidential / Group Housing
  • Location
    • JUNCTION OF KATRAK AND TILAK ROAD
    • MATUNGA DIVISION
    • DADAR EAST
    • 400014
  • Pincode400014
  • RERA no.P51900055203
  • ReraGenie IDRG-MH-07380

Builder

  • NameGBD INFRACON LLP
  • Entity typeOthers
  • PartnersBAJRANG G SINGH singh, dhananjay g singh singh, gopal r singh singh, LOYALTY REALTY LLP LOYALTY REALTY LLP, M&K ELEMENTS REALTY LLP M & K ELEMENTS REALTY LLP
  • Declared earlier projects2 →

Key dates

this monthRegisteredMar 2024PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Mar 2024
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings1 building record
  • Documents filed95 files

Current status

12%7 of 59 units booked
39.5%Work done, per cost certificate

Figures as on 14 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ram setu bhavanNA2712461359

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 14 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.

ram setu bhavan: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure75%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises12%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks18%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 14 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes70%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes60%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed126

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots126
Closed/Covered126

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,048 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on14 Apr 2026

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI4858.95
Proposed, not sanctioned3,901 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchASHOK NAGAR KANDIVALI EAST
Estimated costRs 73.40 cr
Cost incurredRs 29.02 cr
Work done39.54%
BuildingWingEstimatedIncurred
ram setu bhavanNARs 51.38 crRs 29.02 cr
-NARs 22.02 cr-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCONCEPT INFRASTRUCTURE CONSULTANTS
Engineerrakesh singh
Engineerrajiv rai
Chartered AccountantN P SHETTY & CO
Chartered AccountantHSP AND ASSOCIATES
PartnerRole in project
GBD INFRACON LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Feb 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed95

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 95 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE FOR GBD INFRACON LLP 31032026.pdf14 Apr 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE FOR GBD INFRACON LLP-signed.pdf14 Apr 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE FOR GBD INFRACON LLP-signed.pdf14 Apr 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE FOR GBD INFRACON LLP-31122025.pdf14 Apr 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE FOR GBD INFRACON LLP 31032026.pdf14 Apr 2026
Withdrawal Update Form 2File: FORM 2 ENGINEERS CERTIFICATE 31032026.pdf14 Apr 2026
Withdrawal Update Form 2File: FORM 2-ENGINEERS CERTIFICATE.pdf14 Apr 2026
Withdrawal Update Form 2File: FORM 2-ENGINEERS CERTIFICATE.pdf14 Apr 2026
Withdrawal Update Form 2File: FORM 2-31122025.pdf14 Apr 2026
Withdrawal Update Form 2File: FORM 2 ENGINEERS CERTIFICATE 31032026.pdf14 Apr 2026
Withdrawal Update Form 3File: FORM 3-GBD INFRACON LLP-31032026.pdf14 Apr 2026
Withdrawal Update Form 3File: FORM 3-GBD INFRACON LLP.pdf14 Apr 2026
Withdrawal Update Form 3File: FORM 3-GBD INFRACON LLP-30092025.pdf14 Apr 2026
Withdrawal Update Form 3File: FORM 3-GBD INFRACON LLP-31122025.pdf14 Apr 2026
Withdrawal Update Form 3File: FORM 3-GBD INFRACON LLP-31032026.pdf14 Apr 2026
Commencement Certificates / NA Order for plotted developmentFile: FURTHER CC-GBD INFRACON LLP.pdf18 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5-GBD INFRACON LLP.pdf13 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5-GBD INFRACON LLP-Signed.pdf13 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE-Signed.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-GBD INFRACON LLP.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ENGINEER'S CERTIFICATE.pdf29 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE-Signed.pdf24 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ENGINEER'S CERTIFICATE.pdf24 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-GBD INFRACON LLP.pdf17 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 ARCHITECT CERTIFICATE-GBD INFRACON LLP.pdf17 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2-ENGINEER'S CERTIFICATE-.pdf17 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A-Quality Certificate from Site engineer-GBD INFRACON LLP.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-GBD INFRACON LLP.pdf17 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-GBD INFRACON LLP.pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-GBD INFRACON LLP.pdf25 Apr 2024
Proforma of Agreement for saleFile: PAYMENT SCHEDULE-GBD INFRACON LLP (6).pdf25 Apr 2024
Building plan approvalFile: FULL PLAN SOHNAJ IOD.pdf4 Mar 2024
Building plan approvalFile: IOD SOHNAJ-1.pdf4 Mar 2024
Building plan approvalFile: IOD SOHNAJ-2.pdf4 Mar 2024
Building plan approvalFile: IOD SOHNAJ-3.pdf4 Mar 2024
Building plan approvalFile: IOD SOHNAJ-4.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD SOHNAJ-1.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD SOHNAJ-2.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD SOHNAJ-3.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: IOD SOHNAJ-4.pdf4 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: FULL PLAN SOHNAJ IOD.pdf4 Mar 2024
Other - LegalFile: Deed of assignment and development agreement-sohnaj society-Regtd-1.pdf1 Mar 2024
Other - LegalFile: Deed of assignment and development agreement-sohnaj society-Regtd-2.pdf1 Mar 2024
Other - LegalFile: Deed of assignment and development agreement-sohnaj society-Regtd-3.pdf1 Mar 2024
Other - LegalFile: Deed of assignment and development agreement-sohnaj society-Regtd-4.pdf1 Mar 2024
Other - LegalFile: Deed of assignment and development agreement-sohnaj society-Regtd-5.pdf1 Mar 2024
Other - LegalFile: Deed of assignment and development agreement-sohnaj society-Regtd-6.pdf1 Mar 2024
Other - LegalFile: Consent Terms signed.pdf1 Mar 2024
Other - LegalFile: Lease Transfer Consent-GBD Infracon LLP-Sohnaj Society.pdf1 Mar 2024
Copy of the legal title reportFile: Title Certificate GBD INFRACON LLP-LATEST.pdf27 Feb 2024
Other - LegalFile: gbd infracon llp-RERA FLOW OF TITLE.pdf27 Feb 2024
Other - LegalFile: Deed of Assignment-Regtd.pdf22 Feb 2024
Other - LegalFile: Development Agreement-Sohnaj Building-GBD Infracon.pdf21 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: asha mucchal KGR Worldwide.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ankit modani mk Elements.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: GBD Infracon LLP Gaurishankar Loya.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: GBD infracon LLP Aaditya Loya.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: GBD INFRACON LLP ANANT LOYA ANNEXURE A.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: GBD INFRACON LLP MAMTA LOYA ANNEXURE A.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: kirteedevi Kabra-KGR Worldwide-On Letterhead signed.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: monal kabra-KGR Worldwide-On Letterhead signed.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: priti saboo-KGR Worldwide-On Letterhead signed.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: rajesh Kabra-KGR 360-On Letterhead signed.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sohnaj - Annexure A - Mulraj Mody - Signed.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Sohnaj - Annexure A - Sumit Mody - Signed.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: rajesh Kabra-KGR 360-On Letterhead signed.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: rajesh Kabra-KGR Worldwide-On Letterhead signed.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: shreegopal Kabra-KGR 360-On Letterhead.pdf15 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: shreegopal Kabra-KGR Worldwide-On Letterhead.pdf15 Feb 2024
Disclosure of sold/ booked inventoryFile: disclosure of booked inventory-gbd infracon llp.pdf6 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3-GBD INFRACON LLP.pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: BAJRANG-ANNEXURE A ON LETTERHEAD.pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Dhananjay-ANNEXURE A ON LETTERHEAD.pdf6 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: gopal-ANNEXURE A ON LETTERHEAD.pdf6 Feb 2024
Copy of the legal title reportFile: revised Ttitle certificate-GBD INFRACON LLP.pdf2 Feb 2024
Proforma of Agreement for saleFile: PAYMENT SCHEDULE-GBD INFRA PROJECT LLP-Part of agreement.pdf2 Feb 2024
Deviation Report with respect to Allotment letterFile: deviation in allotment letter-On letterhead.pdf2 Feb 2024
Deviation Report with respect to model copy of AgreementFile: deviation in agreement of sale on letterhead.pdf2 Feb 2024
Declaration in FORM BFile: Form B-DECLARATION CUM AFFIDAVIT-GBD INFRACON LLP.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERTIFICATE-FORM 2-SOHNAJ.pdf15 Jan 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
UJWALA KUTIRCARTER ROAD NO 2 BORIVALI EAST32CompletedJul 2024Nov 2023
SIDDHI VINAYAK GRANDEURSAYANI ROAD PRABHADEVI20CompletedOct 2023Aug 2023

Keep Ram Setu Bhavan on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MATUNGA DIVISION,DADAR EAST

Builder: GBD INFRACON LLP

GBD INFRACON LLP has 1 registration on MahaRERA, including Ram Setu Bhavan. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if Ram Setu Bhavan is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ram Setu Bhavan?

The registered promoter entity is GBD INFRACON LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ram Setu Bhavan?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ram Setu Bhavan?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ram Setu Bhavan?

The professionals named in the filing: Architect: CONCEPT INFRASTRUCTURE CONSULTANTS; Engineer: rakesh singh; Engineer: rajiv rai; Chartered Accountant: N P SHETTY & CO; Chartered Accountant: HSP AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ram Setu Bhavan?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ram Setu Bhavan. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ram Setu Bhavan to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.