Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY is a Residential / Group Housing project by SHREE SAISH GROUP in Thane, Maharashtra, registered with MahaRERA as P51700056247 on 22 May 2024. The registration is recorded completed; possession was promised by 31 Dec 2027. 2 of the 48 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.
At a glance
Project
- NameRAJA DASRATH CO- OPERATIVE HOUSING SOCIETY
- TypeResidential / Group Housing
- Location
- G B PATHARLI ROAD
- DOMBIVLI EAST
- Kalyan-Dombivali (M Corp.)
- Kalyan
- Thane
- 421201
- Pincode421201
- RERA no.P51700056247
- ReraGenie IDRG-MH-17898
Builder
- NameSHREE SAISH GROUP
- Entity typePartnership
- PartnersSURAJ A GOSWAMI, SUJIT M NALAVADE, ROHIT S GAMBHIRRAO, ANANT A DESHMUKH, VIKAS M PANDEY
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on22 May 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed65 files
Current status
Figures as on 13 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RAJA DASRATH CO OPERATIVE HOUSING SOCIETY | NA | 8 | 7 | 48 | 0 | 48 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 13 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.
RAJA DASRATH CO OPERATIVE HOUSING SOCIETY: 91% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 13 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 40% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed28
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| RAJA DASRATH CO-OPERATIVE HOUSING SOCIETY | DOMBIVLI | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RAJA DASRATH CO OPERATIVE HOUSING SOCIETY | NA | Rs 9.61 cr | Rs 8.50 cr |
| - | NA | Rs 50.00 lakh | - |
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | MS DREAM HOME ARCHITECH |
| Engineer | NEEV ENGINEERING CONSULTANCY |
| Chartered Accountant | KUMAR SHAH AND CO |
| Partner | Role in project |
|---|---|
| SHREE SAISH GROUP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 14 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 21 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed65
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: OC RD.pdf | 13 Jun 2026 |
| Withdrawal Update Form 1File: SSG Architect Certificate Mar-26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: SSG Engineer Certificate Mar-26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Shree Saisha Group Form-3.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: SSG form 1 (1).pdf | 17 Jan 2026 |
| Withdrawal Update Form 2File: RD Form 2 Engineer Certificate ssg.pdf | 17 Jan 2026 |
| Withdrawal Update Form 3File: shree saish group CAC FORM 3.pdf | 17 Jan 2026 |
| Withdrawal Update Form 1File: SSG form 1 (1).pdf | 20 Oct 2025 |
| Withdrawal Update Form 1File: SSG form 1 (1).pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: SSG Form 2.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: SSG Form 2.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: SSG FORM 3.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: SSG FORM 3.pdf | 20 Oct 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Shree Saish Group 310325_compressed.pdf | 20 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shree saish group architect certificate form 1.pdf | 17 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: shree saish group engineer certificate form 2.pdf | 17 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: shree saish group engineer certificate form 2A.pdf | 17 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSG Form 1.pdf | 11 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSG Form 3COM.pdf | 11 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSG Engeneers Certificate.pdf | 11 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSG Engeneers Certificate.pdf | 11 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SSG Form-2A.pdf | 11 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SSG Engeneers Certificate.pdf | 11 Jan 2025 |
| Layout approvalFile: RD Plan.pdf | 21 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: RD Plan.pdf | 21 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: RD Permission.pdf | 21 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree Saish Group form 1.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSG CA Certificate FORM 3.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSG Form 2.pdf | 14 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SSG Form 2A.pdf | 14 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: S S INFR FORM 1.pdf | 15 Jul 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: S S Group FORM 1.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSI-from2 compressed.pdf | 15 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSG FORM 2compressed.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A SSI.pdf | 15 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A SSG.pdf | 15 Jul 2024 |
| Building plan approvalFile: 1 Copy of Layout Approval (in case of layout) N.pdf | 14 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout) N.pdf | 14 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTRED ACCOUNTANTS CERTIFICATE FORM-3_001.pdf | 14 May 2024 |
| Other - TechnicalFile: KDMC 2.pdf | 22 Apr 2024 |
| Other - TechnicalFile: 2 Declaration in FORM B.pdf | 19 Apr 2024 |
| Copy of the legal title reportFile: SSG- Titile Certificate_001 N.pdf | 18 Apr 2024 |
| Proforma of Agreement for saleFile: AFS RD.pdf | 18 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: SSG- Diviation Report_001.pdf | 18 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrance Letter -financ FINAL.pdf | 3 Apr 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrance Letter -financ FINAL.pdf | 3 Apr 2024 |
| CERSAI detailsFile: CERSAI DECLARATION FINAL.pdf | 3 Apr 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A_001.pdf | 3 Apr 2024 |
| Layout approvalFile: plan RD.pdf | 29 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: plan RD.pdf | 29 Mar 2024 |
| PAN CardFile: PAN CARD.pdf | 13 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: Encubreance letter- legal_001.pdf | 13 Mar 2024 |
| Details of encumbrances concerned to LegalFile: Encubreance letter- legal_001.pdf | 13 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: commencemnet certificate.pdf | 13 Mar 2024 |
| Declaration about Commencement CertificateFile: Declaration about com formet D_001.pdf | 13 Mar 2024 |
| Declaration in FORM BFile: SSG Affidavit_001.pdf | 13 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ANANT DESHMUKH_001.pdf | 13 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure letter_001.pdf | 13 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: MITHILESH PANDEY_001.pdf | 13 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: ROHIT GAMBHIRRAO_001.pdf | 13 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: SANDIP R PARAB_001.pdf | 13 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: SUJIT NALAVADE_001.pdf | 13 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: SURAJ GOSWAMI_001.pdf | 13 Mar 2024 |
| Proforma of Allotment letterFile: Annexure 1 ALLOTMENT LETTER_001.pdf | 13 Mar 2024 |
| Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER_001.pdf | 13 Mar 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 65 filed documents as one ZIP, foldered, with a manifest
Keep RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DOMBIVLI EAST7,600+ in Thane
MY CITY PHASE II CLUSTER 5 PART II
HORIZON PROJECTS PVT LTD
MY CITY PHASE II CLUSTER 5 PART III
HORIZON PROJECTS PVT LTD
Runwal Gardens Phase 3 Bldg No 27-28
Runwal Residency Private Limited
Runwal Gardens Phase 4 Bldg No. 35-36
Runwal Residency Private Limited
VASTU LUXURIA
LAUKIK DEVELOPMENT CORPORATION
KAPLESHWARA RESIDENCY
KAPLESHWARA HOMES LLP
See every Thane project, with the district possession charts
Builder: SHREE SAISH GROUP
SHREE SAISH GROUP has 1 registration on MahaRERA, including RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY?
The registered promoter entity is SHREE SAISH GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY?
The professionals named in the filing: Architect: MS DREAM HOME ARCHITECH; Engineer: NEEV ENGINEERING CONSULTANCY; Chartered Accountant: KUMAR SHAH AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback