ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY

Completed No litigation declared Residential / Group Housing project

RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY

By SHREE SAISH GROUP

RG-MH-17898 · RERA P51700056247 · Last updated on MahaRERA portal: 13 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
46 of 48Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 65 documents Report an error

RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY is a Residential / Group Housing project by SHREE SAISH GROUP in Thane, Maharashtra, registered with MahaRERA as P51700056247 on 22 May 2024. The registration is recorded completed; possession was promised by 31 Dec 2027. 2 of the 48 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete.

At a glance

Project

  • NameRAJA DASRATH CO- OPERATIVE HOUSING SOCIETY
  • TypeResidential / Group Housing
  • Location
    • G B PATHARLI ROAD
    • DOMBIVLI EAST
    • Kalyan-Dombivali (M Corp.)
    • Kalyan
    • Thane
    • 421201
  • Pincode421201
  • RERA no.P51700056247
  • ReraGenie IDRG-MH-17898

Builder

  • NameSHREE SAISH GROUP
  • Entity typePartnership
  • PartnersSURAJ A GOSWAMI, SUJIT M NALAVADE, ROHIT S GAMBHIRRAO, ANANT A DESHMUKH, VIKAS M PANDEY

Key dates

this monthRegisteredMay 2024PromisedDec 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 May 2024
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed65 files

Current status

4%2 of 48 units booked
84.0%Work done, per cost certificate

Figures as on 13 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RAJA DASRATH CO OPERATIVE HOUSING SOCIETYNA8748048

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

RAJA DASRATH CO OPERATIVE HOUSING SOCIETY: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 13 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed28

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots28
Closed/Covered28

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area814 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Jan 2026
LandownerVillageDistrict
RAJA DASRATH CO-OPERATIVE HOUSING SOCIETYDOMBIVLIThane

Approvals and building plan

Sanctioning authorityKALYAN DOMBIVLI MUNICIPAL CORPORATION
Permissible FSI3363.61
Proposed, not sanctioned1,854 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRIDHI SIDHI BUILDING MALVIA ROAD RAMNAGAR OPP BODAS MANGAL KARYALAYA DOMBIVLI EAST MUMBAI 421201
Estimated costRs 10.11 cr
Cost incurredRs 8.50 cr
Work done84.04%
BuildingWingEstimatedIncurred
RAJA DASRATH CO OPERATIVE HOUSING SOCIETYNARs 9.61 crRs 8.50 cr
-NARs 50.00 lakh-

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMS DREAM HOME ARCHITECH
EngineerNEEV ENGINEERING CONSULTANCY
Chartered AccountantKUMAR SHAH AND CO
PartnerRole in project
SHREE SAISH GROUP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 18 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 21 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 14 May 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed65

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC RD.pdf13 Jun 2026
Withdrawal Update Form 1File: SSG Architect Certificate Mar-26.pdf20 Apr 2026
Withdrawal Update Form 2File: SSG Engineer Certificate Mar-26.pdf20 Apr 2026
Withdrawal Update Form 3File: Shree Saisha Group Form-3.pdf20 Apr 2026
Withdrawal Update Form 1File: SSG form 1 (1).pdf17 Jan 2026
Withdrawal Update Form 2File: RD Form 2 Engineer Certificate ssg.pdf17 Jan 2026
Withdrawal Update Form 3File: shree saish group CAC FORM 3.pdf17 Jan 2026
Withdrawal Update Form 1File: SSG form 1 (1).pdf20 Oct 2025
Withdrawal Update Form 1File: SSG form 1 (1).pdf20 Oct 2025
Withdrawal Update Form 2File: SSG Form 2.pdf20 Oct 2025
Withdrawal Update Form 2File: SSG Form 2.pdf20 Oct 2025
Withdrawal Update Form 3File: SSG FORM 3.pdf20 Oct 2025
Withdrawal Update Form 3File: SSG FORM 3.pdf20 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 Shree Saish Group 310325_compressed.pdf20 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: shree saish group architect certificate form 1.pdf17 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: shree saish group engineer certificate form 2.pdf17 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: shree saish group engineer certificate form 2A.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSG Form 1.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSG Form 3COM.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSG Engeneers Certificate.pdf11 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSG Engeneers Certificate.pdf11 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SSG Form-2A.pdf11 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SSG Engeneers Certificate.pdf11 Jan 2025
Layout approvalFile: RD Plan.pdf21 Dec 2024
Copy of Layout Approval (in case of layout)File: RD Plan.pdf21 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: RD Permission.pdf21 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Shree Saish Group form 1.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SSG CA Certificate FORM 3.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSG Form 2.pdf14 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: SSG Form 2A.pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: S S INFR FORM 1.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: S S Group FORM 1.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSI-from2 compressed.pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SSG FORM 2compressed.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A SSI.pdf15 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM2A SSG.pdf15 Jul 2024
Building plan approvalFile: 1 Copy of Layout Approval (in case of layout) N.pdf14 May 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Copy of Layout Approval (in case of layout) N.pdf14 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CHARTRED ACCOUNTANTS CERTIFICATE FORM-3_001.pdf14 May 2024
Other - TechnicalFile: KDMC 2.pdf22 Apr 2024
Other - TechnicalFile: 2 Declaration in FORM B.pdf19 Apr 2024
Copy of the legal title reportFile: SSG- Titile Certificate_001 N.pdf18 Apr 2024
Proforma of Agreement for saleFile: AFS RD.pdf18 Apr 2024
Deviation Report with respect to model copy of AgreementFile: SSG- Diviation Report_001.pdf18 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Letter -financ FINAL.pdf3 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrance Letter -financ FINAL.pdf3 Apr 2024
CERSAI detailsFile: CERSAI DECLARATION FINAL.pdf3 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A_001.pdf3 Apr 2024
Layout approvalFile: plan RD.pdf29 Mar 2024
Copy of Layout Approval (in case of layout)File: plan RD.pdf29 Mar 2024
PAN CardFile: PAN CARD.pdf13 Mar 2024
Details of encumbrances concerned to FinanceFile: Encubreance letter- legal_001.pdf13 Mar 2024
Details of encumbrances concerned to LegalFile: Encubreance letter- legal_001.pdf13 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: commencemnet certificate.pdf13 Mar 2024
Declaration about Commencement CertificateFile: Declaration about com formet D_001.pdf13 Mar 2024
Declaration in FORM BFile: SSG Affidavit_001.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANANT DESHMUKH_001.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Disclosure letter_001.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: MITHILESH PANDEY_001.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ROHIT GAMBHIRRAO_001.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SANDIP R PARAB_001.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SUJIT NALAVADE_001.pdf13 Mar 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: SURAJ GOSWAMI_001.pdf13 Mar 2024
Proforma of Allotment letterFile: Annexure 1 ALLOTMENT LETTER_001.pdf13 Mar 2024
Deviation Report with respect to Allotment letterFile: ALLOTMENT LETTER_001.pdf13 Mar 2024

How this compares with Thane

4%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DOMBIVLI EAST7,600+ in Thane

Builder: SHREE SAISH GROUP

SHREE SAISH GROUP has 1 registration on MahaRERA, including RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY?

The registered promoter entity is SHREE SAISH GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY?

The professionals named in the filing: Architect: MS DREAM HOME ARCHITECH; Engineer: NEEV ENGINEERING CONSULTANCY; Chartered Accountant: KUMAR SHAH AND CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAJA DASRATH CO- OPERATIVE HOUSING SOCIETY to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.