Completed No litigation declared Residential / Group Housing project

RAINBOW GRACE

By RAINBOW REALTY

RG-MH-11273 · RERA P52100008364 · Last updated on MahaRERA portal: 5 Apr 2023

Source: official MahaRERA filing

Red flags

  • Completion date moved by 36 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Mar 2023Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 82 documents Report an error

RAINBOW GRACE is a Residential / Group Housing project by RAINBOW REALTY in Pune, Maharashtra, registered with MahaRERA as P52100008364 on 18 Aug 2017. The registration is recorded completed; possession was promised by 30 Mar 2023. The completion date has moved by 36 months from the original filing.

At a glance

Project

  • NameRAINBOW GRACE
  • TypeResidential / Group Housing
  • Location
    • WAGHOLI
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100008364
  • ReraGenie IDRG-MH-11273

Builder

  • NameRAINBOW REALTY
  • Entity typePartnership
  • Declared earlier projects1 →

Key dates

this monthRegisteredAug 2017First promiseMar 2020Revised toMar 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on18 Aug 2017
  • Promised completion30 Mar 2023
  • Revised completionRevised to 30 Mar 2023 (originally 31 Mar 2020)
  • Buildings1 building record
  • Documents filed82 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 5 Apr 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

Building A: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 5 Apr 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership8

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,613 sq m
Land owned byThe promoter, with other names on the file
Named landowners8
LandownerVillageDistrict
B.K. MHASKEPune (M Corp.)Pune
RAHUL BHASKAR MHAKEPune (M Corp.)Pune
SUNITA BHASKAR MHASKEPune (M Corp.)Pune
VANDANA BHASKAR MHASKEPune (M Corp.)Pune
SEEMA PRASAD THAKARPune (M Corp.)Pune
NOORDIN KARMALI MULANIPune (M Corp.)Pune
NIZAR NOORDIN MULANIPune (M Corp.)Pune
AMIN NOORDIN MULANIPune (M Corp.)Pune

Approvals and building plan

Permissible FSI14650.36
Proposed, not sanctioned14,597 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMITRAMANDAL CO OP HSG SOCIETY HALL,FIRST FLOOR PARVTI PUNE

Certifying professionals and partners2

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAKASH KULKARNI
EngineerP S KULKARNI ASSOCIATES
PartnerRole in project
RAINBOW REALTY-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100005856Mar 2020 → Sep 2020

Reason as filed by the promoterVarious clearance required for occupancy certificate are in process. Mainly elevation certificated from ministry of defense is in process

EXT52100009499Mar 2020 → Sep 2022

Reason as filed by the promoter1) Our 100% construction work is completed; we have attached Architects certificate for the same. 2) We have applied for project completion/ occupancy certificate from PMRDA we have attached application copy with this application in other documents ; it is due to Covid-19 lock down govt office are functioning at only 10% staff. 3) Covid 19 nationwide lockdown has affected construction speed because labours were not available are site for 2-3 months. 4) Also there was material shortage due to Covid 19 lock down.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 13 Nov 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 26 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 5 Apr 2023

Documents filed82

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 82 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Completion certificate.pdf5 Apr 2023
Architect’s Certificate on Completion of Project (Form 4)File: ilovepdf.pdf5 Apr 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2020.pdf16 Apr 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A 2021.pdf16 Apr 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2020.pdf16 Apr 2021
Copy of the legal title reportFile: supplementary title report.pdf13 Nov 2018
Certificates of CA (Form 5)File: C A Certificate.pdf13 Nov 2018
Certificates of CA (Form 5)File: C A Certificate.pdf13 Nov 2018
Proforma of Allotment letterFile: NEW SALE DEED FORMAT FOR RERA.pdf13 Nov 2018
OtherFile: EC.pdf13 Nov 2018
Details of encumbrancesFile: ENCUMBRABCE_CERTIFICATE.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Engenineer1.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Engenineer2.pdf28 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Engenineer3.pdf28 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engenineer.pdf28 Jul 2017
Certificates of CA (Form 3)File: 1.pdf28 Jul 2017
Certificates of CA (Form 3)File: 2.pdf28 Jul 2017
Certificates of CA (Form 3)File: 3.pdf28 Jul 2017
Certificates of CA (Form 3)File: 4.pdf28 Jul 2017
Certificates of CA (Form 3)File: 5.pdf28 Jul 2017
Layout approvalFile: 1.pdf27 Jul 2017
Building plan approvalFile: 12.pdf27 Jul 2017
Building plan approvalFile: 13.pdf27 Jul 2017
Building plan approvalFile: 14.pdf27 Jul 2017
Building plan approvalFile: 15.pdf27 Jul 2017
Building plan approvalFile: 2.pdf27 Jul 2017
Building plan approvalFile: 3.pdf27 Jul 2017
Building plan approvalFile: 4.pdf27 Jul 2017
Building plan approvalFile: 5.pdf27 Jul 2017
Building plan approvalFile: 6.pdf27 Jul 2017
Building plan approvalFile: 7.pdf27 Jul 2017
Building plan approvalFile: 8.pdf27 Jul 2017
Building plan approvalFile: 9.pdf27 Jul 2017
Building plan approvalFile: 10.pdf27 Jul 2017
Building plan approvalFile: 11.pdf27 Jul 2017
Building plan approvalFile: 1.pdf27 Jul 2017
PAN CardFile: RR Pan card 2017-07-27(1).pdf27 Jul 2017
Copy of Layout Approval (in case of layout)File: 1.pdf27 Jul 2017
Building Plan Approval (IOD)File: 1.pdf27 Jul 2017
Building Plan Approval (IOD)File: 2.pdf27 Jul 2017
Building Plan Approval (IOD)File: 3.pdf27 Jul 2017
Building Plan Approval (IOD)File: 4.pdf27 Jul 2017
Building Plan Approval (IOD)File: 5.pdf27 Jul 2017
Building Plan Approval (IOD)File: 6.pdf27 Jul 2017
Building Plan Approval (IOD)File: 7.pdf27 Jul 2017
Building Plan Approval (IOD)File: 8.pdf27 Jul 2017
Building Plan Approval (IOD)File: 9.pdf27 Jul 2017
Building Plan Approval (IOD)File: 10.pdf27 Jul 2017
Building Plan Approval (IOD)File: 11.pdf27 Jul 2017
Building Plan Approval (IOD)File: 12.pdf27 Jul 2017
Building Plan Approval (IOD)File: 13.pdf27 Jul 2017
Building Plan Approval (IOD)File: 14.pdf27 Jul 2017
Building Plan Approval (IOD)File: 15.pdf27 Jul 2017
Declaration in FORM BFile: form B for rera.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: CERTICATE OF ARCHITECT FORM 1.pdf27 Jul 2017
Proforma of Allotment letterFile: upload Book-Agree-RERA-draft-New.pdf27 Jul 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER - Copy.pdf27 Jul 2017
Copy of the legal title reportFile: Tittle search report_1.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_2.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_3.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_4.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_5.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_6.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_7.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_8.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_9.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_10.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_11.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_12.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_13.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_14.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_15.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_16.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_17.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_18.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_19.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_20.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_21.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_22.pdf26 Jul 2017
Copy of the legal title reportFile: Tittle search report_23.pdf26 Jul 2017

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
RAINBOW GLORYGAT NO 1195 NEAR RAISONI COLLEGE WAGHOLI HAVELI PUNE 41220772CompletedDec 2013Late, Mar 2014

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 36 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep RAINBOW GRACE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near WAGHOLI13,700+ in Pune

2 kmRAINBOW GRACECompleted 59Lapsed / revoked 23Other 34Dot size: filed unitsN

Filed coordinates, straight-line distance. 116 registered projects within 2 km.

Builder: RAINBOW REALTY

RAINBOW REALTY has 1 registration on MahaRERA, including RAINBOW GRACE. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if RAINBOW GRACE is delayed beyond 30 Mar 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of RAINBOW GRACE?

The registered promoter entity is RAINBOW REALTY, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in RAINBOW GRACE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for RAINBOW GRACE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at RAINBOW GRACE?

The professionals named in the filing: Architect: PRAKASH KULKARNI; Engineer: P S KULKARNI ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in RAINBOW GRACE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About RAINBOW GRACE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save RAINBOW GRACE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.