Home / Browse projects / Nashik, Maharashtra / RAGRANG CO-OP HOUSING SOCIETY LTD
RAGRANG CO-OP HOUSING SOCIETY LTD
By Nice Home
RG-MH-96962 · RERA P51600056131 · Last updated on MahaRERA portal: 8 May 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 4 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
RAGRANG CO-OP HOUSING SOCIETY LTD is a Residential / Group Housing project by Nice Home in Nashik, Maharashtra, registered with MahaRERA as P51600056131 on 16 May 2024. Possession is promised by 31 Jul 2028. 6 of the 38 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NameRAGRANG CO-OP HOUSING SOCIETY LTD
- TypeResidential / Group Housing
- Location
- GANGAPUR ROAD
- SAUBHAGYA NAGAR
- Nashik (M Corp.)
- Nashik
- 422013
- Pincode422013
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51600056131
- ReraGenie IDRG-MH-96962
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on16 May 2024
- Promised completion31 Jul 2028
- Revised completionNone
- Buildings1 building record
- Documents filed71 files
Current status
Figures as on 8 May 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| RAGRANG CO-OP HOUSING SOCIETY LTD | NA | 6 | 6 | 36 | 2 | 38 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 8 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.
RAGRANG CO-OP HOUSING SOCIETY LTD: 63% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 8 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed105
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership2
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| NICE HOME | Nashik Road | Nashik |
| RAGRANG CO-OP HOUSING SOCEITY LTD | Nashik (M Corp.) | Nashik |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| RAGRANG CO-OP HOUSING SOCIETY LTD | NA | Rs 7.20 cr | Rs 3.12 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TEJAS MORE |
| Engineer | JAYESH MAKWANA |
| Chartered Accountant | PRAKASH A PALDE |
| Chartered Accountant | PRAKASH AMBADAS PALDE |
| Chartered Accountant | MONALI SURESH DUBEY |
| Chartered Accountant | LALIT ASHOK PAWAR |
| Partner | Role in project |
|---|---|
| Nice Home | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 12 Mar 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Mar 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 2 Mar 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 2 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Jul 2028
Documents filed71
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1 30 09 2025.pdf | 8 May 2026 |
| Withdrawal Update Form 1File: FORM 1 31 12 2025.pdf | 8 May 2026 |
| Withdrawal Update Form 1File: FORM 1 31 03 2026.pdf | 8 May 2026 |
| Withdrawal Update Form 2File: FORM 2 30 09 2025.pdf | 8 May 2026 |
| Withdrawal Update Form 2File: FORM 2 31 12 2025.pdf | 8 May 2026 |
| Withdrawal Update Form 2File: FORM 2 31 03 2026.pdf | 8 May 2026 |
| Withdrawal Update Form 3File: Form 3 30 09 2025.pdf | 8 May 2026 |
| Withdrawal Update Form 3File: Form 3 31 12 2025.pdf | 8 May 2026 |
| Withdrawal Update Form 3File: Form 3 31 03 2026.pdf | 8 May 2026 |
| Withdrawal Update Form 1File: FORM I.pdf | 28 Apr 2026 |
| Withdrawal Update Form 2File: 2025-06-30_Raag Rang_Rera Form_2 Engineer.pdf | 28 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 CA CERTIFICATE.pdf | 28 Apr 2026 |
| Form 1File: FORM I.pdf | 6 Mar 2026 |
| Form 2File: FORM II.pdf | 6 Mar 2026 |
| Form 3File: FORM 3.pdf | 6 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY.pdf | 6 Mar 2026 |
| Form 1File: Form 1 Architect Certificate 30-09-2024.pdf | 6 Mar 2026 |
| Form 2File: Form 2 Engineers Certificate 30-09-2024.pdf | 6 Mar 2026 |
| Form 3File: Form 3 CA Certificate 30-09-2024.pdf | 6 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY.pdf | 6 Mar 2026 |
| Form 1File: Form-1 Architect Certificate 31-12-2024.pdf | 6 Mar 2026 |
| Form 2File: Form - 2 Engineers Certificate 31-12-2024.pdf | 6 Mar 2026 |
| Form 3File: Form 3 CA Certificate 31-12-2024.pdf | 6 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY.pdf | 6 Mar 2026 |
| Form 1File: Form_1 Architect Certificate.pdf | 6 Mar 2026 |
| Form 2File: FORM II.pdf | 6 Mar 2026 |
| Form 3File: FORM 3 CA CERTIFICAT UP TO 31-03-2025.pdf | 6 Mar 2026 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY.pdf | 6 Mar 2026 |
| Form 5 (FY 2024-2025)File: FORM 5.pdf | 31 Jan 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 31-12-2024.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 30-09-2024.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 30-09-2024.pdf | 22 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 31-12-2024.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineers Certificate 30-09-2024.pdf | 22 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2 Engineers Certificate 31-12-2024.pdf | 22 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 24-06-30 RAAGRANG RERA UPDATE.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2024-06-30_Raag Rang_Rera Form_2 Engineer.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 24-06-30 RAAGRANG RERA UPDATE.pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2024-06-30_Raag Rang_Rera Form_2 Engineer.pdf | 11 Oct 2024 |
| Declaration about Commencement CertificateFile: FORMAT D Declaration about Commencement Certificate submitted by the promoter.pdf | 4 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf | 30 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SELF DECLARATION .pdf | 30 Mar 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A .pdf | 30 Mar 2024 |
| Other - LegalFile: ANNEXURE A.pdf | 16 Mar 2024 |
| Copy of the legal title reportFile: LEGAT TITLE SERCH REPORT.pdf | 12 Mar 2024 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE.pdf | 12 Mar 2024 |
| Layout approvalFile: 22 NEW layout ragrang.pdf | 2 Mar 2024 |
| Building plan approvalFile: 23 BUILDING PLAN RESIZE-RGRANG.pdf | 2 Mar 2024 |
| PAN CardFile: 25 PAN CARD.pdf | 2 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: 17 1 b Details of encumbrances concerned to Legal - Self Declaration Dindori Trade Centre. | 2 Mar 2024 |
| Details of encumbrances concerned to FinanceFile: 18 1 a Details of encumbrances concerned to Finance - Self Declaration Dindori Trade Centr | 2 Mar 2024 |
| Details of encumbrances concerned to LegalFile: 17 1 b Details of encumbrances concerned to Legal - Self Declaration Dindori Trade Centre. | 2 Mar 2024 |
| Details of encumbrances concerned to LegalFile: 18 1 a Details of encumbrances concerned to Finance - Self Declaration Dindori Trade Centr | 2 Mar 2024 |
| Copy of Layout Approval (in case of layout)File: 22 NEW layout ragrang.pdf | 2 Mar 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 23 BUILDING PLAN RESIZE-RGRANG.pdf | 2 Mar 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 20 Comencement Certificate.pdf | 2 Mar 2024 |
| Declaration in FORM BFile: 1 Declaration in FORM B -KALPESH KHADE Rag Rang_compressed.pdf | 2 Mar 2024 |
| Declaration in FORM BFile: 2 Declaration in FORM B -NILESH SHINDE Rag Rang_compressed.pdf | 2 Mar 2024 |
| Declaration in FORM BFile: 3 Declaration in FORM B -SHUBHAM HAGAWANE Rag Rang_compressed.pdf | 2 Mar 2024 |
| Declaration in FORM BFile: 4 Declaration in FORM B -RAJENDRA AMLE Rag Rang_compressed.pdf | 2 Mar 2024 |
| Declaration in FORM BFile: 5 Declaration in FORM B -ABHAY PITALERag Rang_compressed (2)_11zon.pdf | 2 Mar 2024 |
| CERSAI detailsFile: 13 CERSAI DECLARATION.pdf | 2 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 10 ANNEURE-A -KALPESH KHADE Discosure of Interest in Othe Real Estate Organisation -.pdf | 2 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 11 ANNEURE-A -NILESH SHINDE Discosure of Interest in Othe Real Estate Organisation -.pdf | 2 Mar 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 12 ANNEURE-A -SHUBHAM R HAGAWANE Discosure of Interest in Othe Real Estate Organisation - | 2 Mar 2024 |
| Proforma of Agreement for saleFile: 16 Proforma - Agreement for Sale - Self Declaration October 2022.pdf | 2 Mar 2024 |
| Proforma of Allotment letterFile: 7 Allotment_letter-ragrang[1].pdf | 2 Mar 2024 |
| Deviation Report with respect to Allotment letterFile: 14 Deviation Report with respect to Allotment letter - Self Declaration.pdf | 2 Mar 2024 |
| Deviation Report with respect to model copy of AgreementFile: 26 Deviation report Agreement to sale.pdf | 2 Mar 2024 |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| Nice VastuP51600032244 | At Deolali Shivar, Nashik, Nashik | - | Dec 2021 | Completed | Dec 2026 | Dec 2025 |
| SHIVNERI RESIDENCYP51600048370 | PATOLE MALA, NASHIK ROAD, Nashik | 12 | Dec 2022 | Ongoing | Dec 2025 | Not delivered |
| MAHURGAD CO-OP HOUSING SOCIETYP51600022034 | DEVLALI, Nashik | - | Aug 2019 | Completed | Jul 2023 | Jul 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nashik
Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.
Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 4 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 71 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep RAGRANG CO-OP HOUSING SOCIETY LTD on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SAUBHAGYA NAGAR4,100+ in Nashik
Filed coordinates, straight-line distance. 136 registered projects within 2 km.
Samraat AmOzon
M/S Shweta Infrastructure & Housing (I) Pv
ELYSIAN
ROONGTA HOMES LLP
HAPPY LIFE AT APNA GHAR PHASE III
M/S Shweta Infrastructure & Housing (I) Pv
SKY53
SKY53
ROONGTA ROSEWOOD APARTMENT
SHREE TIRUMALA BUILDCON
ROONGTA EMINENCE APARTMENT
SHREE TIRUMALA BUILDCON
See every Nashik project, with the district possession charts
Builder: Nice Home
Nice Home has 5 registrations on MahaRERA, including MAHURGAD CO-OP HOUSING SOCIETY and Nice Vastu. Its filings disclose 4 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Nashik district page.
Frequently asked questions
What are my rights if RAGRANG CO-OP HOUSING SOCIETY LTD is delayed beyond 31 Jul 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of RAGRANG CO-OP HOUSING SOCIETY LTD?
The registered promoter entity is Nice Home, a partnership as per the filing. Its GSTIN 27AAQFN3900N1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in RAGRANG CO-OP HOUSING SOCIETY LTD?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for RAGRANG CO-OP HOUSING SOCIETY LTD?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at RAGRANG CO-OP HOUSING SOCIETY LTD?
The professionals named in the filing: Architect: TEJAS MORE; Engineer: JAYESH MAKWANA; Chartered Accountant: PRAKASH A PALDE; Chartered Accountant: PRAKASH AMBADAS PALDE; Chartered Accountant: MONALI SURESH DUBEY; Chartered Accountant: LALIT ASHOK PAWAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in RAGRANG CO-OP HOUSING SOCIETY LTD?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.