Home / Browse projects / Aurangabad, Maharashtra / Raga Altis III
Raga Altis III
RG-MH-41004 · RERA P51500024119 · Last updated on MahaRERA portal: 30 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.
See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Raga Altis III is a Others project by KUNDALWAL AND SONS in Aurangabad, Maharashtra, registered with MahaRERA as P51500024119 on 21 Jan 2020. Possession is promised by 30 Mar 2027.
At a glance
Project
- NameRaga Altis III
- TypeOthers
- Location
- Gut No 67
- ITKHEDA
- Aurangabad (M Corp.)
- Aurangabad
- 431001
- Pincode431001
- RERA no.P51500024119
- ReraGenie IDRG-MH-41004
Builder
- NameKUNDALWAL AND SONS
- Entity typePartnership
- PartnersRAJENDRA BANSILAL KUNDALWAL, SANJAY BANSILAL KUNDALWAL
- Other registrations1 more →
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on21 Jan 2020
- Promised completion30 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed77 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Raga Altis III | NA | 15 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 80%.
Raga Altis III: 25% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 80% |
| Podiums (if any) | 0% |
| Plinth | 80% |
| Stilt Floor | 10% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Compound wall and entrance Gate | Yes | 100% |
Parking filed7
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| Sunil Dnyanoba Belge | Aurangabad (M Corp.) | Aurangabad |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Abhay Jaipurkar |
| Engineer | N.G Karkhane |
| Chartered Accountant | Yash Nagar |
| Partner | Role in project |
|---|---|
| KUNDALWAL AND SONS | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Nov 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 19 Mar 2021 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Mar 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 19 Mar 2021Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Mar 2027
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 1File: ARCHITECT CERTIFICATE.PDF | 30 Jun 2026 |
| Form 2File: ENGINEER CERTIFICATE.PDF | 30 Jun 2026 |
| Form 3File: CA CERTIFICATE.PDF | 30 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 2024-25 Q4 Raga III.pdf | 30 Jun 2026 |
| Form 2File: ENGINEER CERTIFICATE.PDF | 30 Jun 2026 |
| Form 1File: ARCHITECT CERTIFICATE.PDF | 30 Jun 2026 |
| Form 3File: CA CERTIFICATE.PDF | 30 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 2024-25 Q4 Raga III.pdf | 30 Jun 2026 |
| Form 1File: ARCHITECT CERTIFICATE.PDF | 30 Jun 2026 |
| Form 2File: ENGINEER CERTIFICATE.PDF | 30 Jun 2026 |
| Form 3File: CA CERTIFICATE.PDF | 30 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 2024-25 Q4 Raga III.pdf | 30 Jun 2026 |
| Form 1File: ARCHITECT CERTIFICATE.PDF | 30 Jun 2026 |
| Form 2File: ENGINEER CERTIFICATE.PDF | 30 Jun 2026 |
| Form 3File: CA CERTIFICATE.PDF | 30 Jun 2026 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold 2024-25 Q4 Raga III.pdf | 30 Jun 2026 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024-25 Q3.PDF | 25 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2023-24 Q1.pdf | 12 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 5 2017-18.pdf | 12 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 2018-19.pdf | 12 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 2019-20.pdf | 12 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.PDF | 20 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate.PDF | 20 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.PDF | 20 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Raga Altis Phase III.pdf | 11 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Raga Altis III.pdf | 11 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_11zon.pdf | 11 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20 Signed.pdf | 24 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21 Signed.pdf | 24 Jun 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 21-22 Signed New.pdf | 24 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 30 June 22_compressed.pdf | 18 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate 30 Dec 22_compressed.pdf | 18 Feb 2023 |
| Details of encumbrances concerned to LegalFile: Encumbrance To Legal.pdf | 28 Sep 2022 |
| Declaration about Commencement CertificateFile: Declaration of Commencement Cert.pdf | 28 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory.pdf | 28 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form 17-18.pdf | 28 Sep 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 18-19.pdf | 28 Sep 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Rera Bank Account.PDF | 28 Sep 2022 |
| Deviation Report with respect to Allotment letterFile: Deviation to Allotment.pdf | 28 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation to Allotment.pdf | 28 Sep 2022 |
| Deviation Report with respect to model copy of AgreementFile: Deviation to Agreement To Sale.pdf | 28 Sep 2022 |
| Disclosure of sold/ booked inventoryFile: Raga Phase III_compressed.pdf | 10 Aug 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf | 10 Aug 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM_3 Raga Altis Phase - III.pdf | 8 Aug 2022 |
| Building plan approvalFile: Epson52.pdf | 19 Mar 2021 |
| Layout approvalFile: Epson51.pdf | 19 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Epson51.pdf | 19 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: Epson52.pdf | 19 Mar 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commecement Certificate.pdf | 19 Mar 2021 |
| OtherFile: Deed Part 1.pdf | 19 Mar 2021 |
| Layout approvalFile: Layout.pdf | 28 Nov 2020 |
| Building plan approvalFile: Building Plan.pdf | 28 Nov 2020 |
| Copy of Layout Approval (in case of layout)File: Layout.pdf | 28 Nov 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Plan.pdf | 28 Nov 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Commecement Certificate.pdf | 28 Nov 2020 |
| Declaration in FORM BFile: Form No 2 Co - Owner_compressed.pdf | 18 Jan 2020 |
| OtherFile: Dev Agreement.pdf | 18 Jan 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 19 Dec 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate-min (1).pdf | 16 Nov 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CCI15112019_0001.pdf | 16 Nov 2019 |
| Proforma of Allotment letterFile: RERA_Agreement_for_Sale_Format.pdf | 16 Nov 2019 |
| Proforma of Allotment letterFile: proforma_allotment_letter.pdf | 16 Nov 2019 |
| Layout approvalFile: Map.PDF | 8 Nov 2019 |
| Layout approvalFile: Certificate_compressed.pdf | 8 Nov 2019 |
| Building plan approvalFile: Commencement Certificate.pdf | 8 Nov 2019 |
| Building plan approvalFile: 1.pdf | 8 Nov 2019 |
| Building plan approvalFile: 2.pdf | 8 Nov 2019 |
| PAN CardFile: Kundalwal and Sons (PAN CARD).pdf | 8 Nov 2019 |
| Copy of the legal title reportFile: Search Report_compressed.pdf | 8 Nov 2019 |
| Details of encumbrancesFile: Encumbrance Certificate.PDF | 8 Nov 2019 |
| Copy of Layout Approval (in case of layout)File: Map.PDF | 8 Nov 2019 |
| Copy of Layout Approval (in case of layout)File: Certificate_compressed.pdf | 8 Nov 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: Commencement Certificate.pdf | 8 Nov 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: 1.pdf | 8 Nov 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: 2.pdf | 8 Nov 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Certificate_compressed.pdf | 8 Nov 2019 |
| Declaration in FORM BFile: Bond Affeduit_compressed.pdf | 8 Nov 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Aurangabad
Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration, which the RERA portal never shows together
- All 77 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Raga Altis III on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ITKHEDA1,400+ in Aurangabad
Capital Trade Centre
KRK Landmark LLP
AQ TOWN
AQ INFRASTRUCTURE PRIVATE LIMITED
KALYANI SAI VISHWA
RAJASHREE UDYOG
AMRUT SAI PLAZA PH 2
Shree Amrut Sai Developer Pvt.Ltd
PRASSANA HIGH CLASS CITY PHASE - I
SHRI KRISHNA NAGAR SAHAKARI GRAH NIRMAN SA
SHRIRAM RESIDENCY
UNIQUE BUILDCON
See every Aurangabad project, with the district possession charts
Builder: KUNDALWAL AND SONS
KUNDALWAL AND SONS has 2 registrations on MahaRERA, including Ajinkya Palacia and Raga Altis III. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.
Frequently asked questions
What are my rights if Raga Altis III is delayed beyond 30 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Raga Altis III?
The registered promoter entity is KUNDALWAL AND SONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Raga Altis III?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Raga Altis III?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Raga Altis III?
The professionals named in the filing: Architect: Abhay Jaipurkar; Engineer: N.G Karkhane; Chartered Accountant: Yash Nagar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Raga Altis III?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback