Home / Browse projects / Pune, Maharashtra / Purvanchal Phase1 AB

Completed No litigation declared Residential / Group Housing project

Purvanchal Phase1 AB

By VTP Corpartion LLP

RG-MH-09868 · RERA P52100001109 · Last updated on MahaRERA portal: 19 Oct 2024

Source: official MahaRERA filing

Red flags

  • 6 complaints at MahaRERA
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2022Possession promisedregistration recorded completed
22 of 22Construction stages doneacross 2 buildings; every applicable stage filed complete
6Complaints at MahaRERAon this registration
Jump to the 59 documents Report an error

Purvanchal Phase1 AB is a Residential / Group Housing project by VTP Corpartion LLP in Pune, Maharashtra, registered with MahaRERA as P52100001109 on 26 Jul 2017. The registration is recorded completed; possession was promised by 29 Dec 2022. The completion date has moved by 18 months from the original filing. 6 complaints are on record with the regulator.

At a glance

Project

  • NamePurvanchal Phase1 AB
  • TypeResidential / Group Housing
  • Location
    • Wagholi Kesnand road
    • Kesnand
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100001109
  • ReraGenie IDRG-MH-09868

Builder

  • NameVTP Corpartion LLP
  • Entity typePartnership
  • PartnersVilaskumar Thanmal Palresha, Nilesh Vilaskumar Palresha, Dheeraj Prabhakar Malineni, Manoj Prabhakar Malineni
  • Other registrations1 more →
  • Completed1 of 2
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredJul 2017First promiseJun 2021Revised toDec 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on26 Jul 2017
  • Promised completion29 Dec 2022
  • Revised completionRevised to 29 Dec 2022 (originally 30 Jun 2021)
  • Buildings2 building records
  • Documents filed59 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingNA160000
B wingNA160000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

22 of 22 construction stages are filed complete across 2 buildings.

A Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 19 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes50%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed146

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots146
Closed/Covered96
Open Space50
BuildingClosed/CoveredOpen SpaceTotal
A Wing582583
B wing382563

Land and ownership11

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,268 sq m
Land owned byThe promoter, with other names on the file
Named landowners11
LandownerVillageDistrict
Ramchandra Jaganath Jadhav-Pune
Balasaheb Jaganath Jadhav-Pune
Nandkumar Jaganath Jadhav-Pune
Dattatray Jaganath Jadhav-Pune
Dattatray Laxman Hargude-Pune
Nitin Rangnath Dhumal-Pune
Sunil Kisan GaikwadKesnandPune
Pandurang Jaganath Wavhal-Pune
Vilas Digmber Jadhav-Pune
Vilas Kantilal Wavhal-Pune
Lata Gorakh Satav-Pune

Approvals and building plan

Permissible FSI13357.02
Proposed, not sanctioned13,357 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSAKORE NAGAR

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAnkur Associates
ArchitectMinal Firake
EngineerSS Patne Associates
PartnerRole in project
VTP Corpartion LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100010046Jun 2021 → Jun 2022

Reason as filed by the promoterDue to pandemic situation unviability of labors and Materials

Litigation declared1

CaseCourtStatus
87/2015/2015C J S DPending

Complaints filed with MahaRERA6

Case no.ComplainantRespondentFiled
CC12601047VTP Corpartion LLPRajiv Nair26/02/2026
CC12601048VTP Corpartion LLPManoj Vikaram Pakhare26/02/2026
CC12601049VTP Corpartion LLPMahesh Gaikwad26/02/2026
CC12601050VTP Corpartion LLPAnilkumar Tijare26/02/2026
CC12601051VTP Corpartion LLPRamesh Reddy26/02/2026
CC12601052VTP Corpartion LLPGINA CHAKRAVARTY26/02/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 19 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 19 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 28 Jan 2022

Documents filed59

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 PURVANCHAL PHASE 1 30092024.pdf19 Oct 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: VTP PURVANCHAL.pdf13 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Form 5 Purvanchal Phase 1 22-23.pdf14 Sep 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 PURVANCHAL PH 1 30062022.pdf26 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 PURVANCHAL PH 1 30092022.pdf26 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 PURVANCHAL PH 1 31122022.pdf26 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 PURVANCHAL PH 1 31032023.pdf26 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Purvanchal Ph I Dec21.pdf23 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sept-21.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec-22.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar-22.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: June-22.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sept-22.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec-22.pdf17 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar-23.pdf17 Jun 2023
Certificates of CA (Form 3)File: Form 3 Purvanchal 1.pdf17 Jun 2023
Certificates of CA (Form 3)File: Form 3 Purvanchal PhI.pdf17 Jun 2023
Certificates of CA (Form 3)File: Form 3 VTP Corp PhI, Jun-22_compressed (1).pdf25 May 2023
Certificates of CA (Form 3)File: Form 3 VTP Corp PhI, Sept-22_compressed (1).pdf25 May 2023
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Purvanchal Phase 1 AB 9032023.pdf18 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - 30062021 1.pdf13 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - 30092021 1.pdf13 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - 31122021 1.pdf13 Mar 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - 31032022.pdf13 Mar 2023
Certificates of CA (Form 3)File: FORM-3 PHASE-1 - 15032018.pdf13 Mar 2023
Certificates of CA (Form 3)File: Form 3 PURVANCHAL Phase-I - 310321_compressed.pdf13 Mar 2023
Certificates of CA (Form 3)File: Form 3 30062021_compressed.pdf13 Mar 2023
Certificates of CA (Form 3)File: Form 3 30092021_compressed.pdf13 Mar 2023
Certificates of CA (Form 3)File: Form 3 31032022_compressed (2).pdf13 Mar 2023
Certificates of CA (Form 3)File: Form 3 31122021_compressed.pdf13 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Purvanchal Phase I_compressed.pdf3 Dec 2022
Details of encumbrancesFile: Purvanchal Ph-1 A,B.pdf14 Nov 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SIGNED FORM-5_PH I_compressed (1).pdf1 Mar 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: PURVANCHAL - Completion Certificate - 25-1-22.pdf28 Jan 2022
Disclosure of sold/ booked inventoryFile: Purv 1AB_merged.pdf27 Jan 2022
Certificates of CA (Form 3)File: Form 3 Purvanchal Phase I.pdf12 Oct 2021
Declaration about Commencement CertificateFile: VTP_PURVANCHAL(1).pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: A,B BLDG JAN 20 TO MARCH 20.pdf11 Oct 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: A,B BLDG JAN 21 TO MARCH 21.pdf11 Oct 2021
Disclosure of sold/ booked inventoryFile: Sold inventory Singned.pdf11 Oct 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 Purvancha Phase 1 AB 2018 -19.pdf10 Aug 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Purvanchal Phase I 2019-20.pdf10 Aug 2021
Certificates of CA (Form 5)File: Form 5 Purvancha Phase 1 AB 2018 -19.pdf14 Jul 2021
Certificates of CA (Form 5)File: Form 5 Purvanchal Phase I 2019-20.pdf14 Jul 2021
Certificates of CA (Form 5)File: Purvanchal Phase 1 AB P52100001109.pdf23 Oct 2018
Details of encumbrancesFile: Encumbrance Certificate Purvanchal.pdf16 Feb 2018
Building plan approvalFile: purvanchal layout.pdf19 Jul 2017
Layout approvalFile: purvanchal layout.pdf19 Jul 2017
Copy of Layout Approval (in case of layout)File: purvanchal layout.pdf19 Jul 2017
Building Plan Approval (IOD)File: purvanchal layout.pdf19 Jul 2017
Declaration in FORM BFile: BVP Form B.pdf19 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: VTP CORPORATION LLP ENG CERI.pdf19 Jul 2017
Certificates of CA (Form 3)File: Form 3 Purvanchal.pdf18 Jul 2017
Proforma of Allotment letterFile: Purvanchal AOS.pdf18 Jul 2017
PAN CardFile: vtp corporation llp.pdf17 Jul 2017
Copy of the legal title reportFile: tilte search purvanchal 1.pdf17 Jul 2017
Details of encumbrancesFile: Encumbrance Purvanchal.pdf17 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate17.pdf17 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE.pdf17 Jul 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 18 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Purvanchal Phase1 AB on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kesnand13,700+ in Pune

2 kmPurvanchal Phase1 ABCompleted 17Lapsed / revoked 15Other 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 52 registered projects within 2 km.

Builder: VTP Corpartion LLP

VTP Corpartion LLP has 2 registrations on MahaRERA, including Purvanchal Phase1 AB and Purvanchal F Building. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Purvanchal Phase1 AB is delayed beyond 29 Dec 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Purvanchal Phase1 AB?

The registered promoter entity is VTP Corpartion LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Purvanchal Phase1 AB?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Purvanchal Phase1 AB?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Purvanchal Phase1 AB?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Purvanchal Phase1 AB?

The professionals named in the filing: Architect: Ankur Associates; Architect: Minal Firake; Engineer: SS Patne Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Purvanchal Phase1 AB?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Purvanchal Phase1 AB. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Purvanchal Phase1 AB to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.