Purvanchal F Building
RG-MH-12875 · RERA P52100021535 · Last updated on MahaRERA portal: 29 Aug 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- Litigation declared, 2 cases
- 2 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
- Rs 45.00 crore secured on the land, in favour of CAPRI GLOBAL CAPITAL LIMITED
Clear
- Separate project account declared
- Allotment letter follows the model form
7 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Purvanchal F Building is a Residential / Group Housing project by VTP Corpartion LLP in Pune, Maharashtra, registered with MahaRERA as P52100021535 on 8 Jul 2019. Possession was promised by 29 Jun 2025 and is now 16 months past that date. The completion date has moved by 12 months from the original filing. 78 of the 84 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete. 2 complaints are on record with the regulator.
At a glance
Project
- NamePurvanchal F Building
- TypeResidential / Group Housing
- Location
- Wagholi kesnand Road
- kesnand
- Haveli
- Pune
- 412207
- Pincode412207
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100021535
- ReraGenie IDRG-MH-12875
Builder
- NameVTP Corpartion LLP
- Entity typePartnership
- PartnersVilaskumar Thanmal Palresha, Nilesh Vilaskumar Palresha, Dheeraj Prabhakar Malineni, Manoj Prabhakar Malineni
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on8 Jul 2019
- Promised completion29 Jun 2025
- Revised completionRevised to 29 Jun 2025 (originally 30 Jun 2024)
- Buildings1 building record
- Documents filed87 files
Current status
Figures as on 29 Aug 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| F1 and F2 building | NA | 9 | 7 | 84 | 0 | 84 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 29 Aug 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.
F1 and F2 building: 71% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 75% |
| Sanitary Fittings within the flats / premises | 50% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 70% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 50% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Progress on shared amenities15
As on 29 Aug 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 88% |
| Water Supply | Yes | 88% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 75% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 55% |
| Solid Waste Management And Disposal | Yes | 40% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 25% |
| Electrical meter room, sub-station, receiving station | Yes | 45% |
| Aggregate area of recreational Open Space | Yes | 45% |
| Open Parking | Yes | 0% |
Parking filed110
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership10
MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
| Landowner | Village | District |
|---|---|---|
| Ramchandra Jadhav | Kesnand | Pune |
| Balasaheb Jadhav | Kesnand | Pune |
| Nandkumar Jadhav | Kesnand | Pune |
| Dattatray Jadhav | Kesnand | Pune |
| Vilas Waval | - | Pune |
| Sunil Gaikwad | - | Pune |
| Pandurang Waval | - | Pune |
| Nitin Dhumal | - | Pune |
| Lata Satav | - | Pune |
| Dattatray Hargude | - | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VTP Realty |
| Architect | Ankur Associates |
| Architect | Minal Firake |
| Engineer | RAJESH MORE |
| Engineer | VTP Realty |
| Chartered Accountant | CA Priyanka Chordiya |
| Chartered Accountant | S A C CO & LLP |
| Partner | Role in project |
|---|---|
| VTP Corpartion LLP | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIn accordance with circular no 28, we hereby apply for extension of our project u/s 6 in Format B. The project was delayed for reasons beyond our control on account of various reasons and more particularly on account of the pandemic of Covid-19.
Litigation declared2
| Case | Court | Status |
|---|---|---|
| 87/2015/2015 | CJSD | Pending |
| 57/2015 | CJSD | Ongoing |
Complaints filed with MahaRERA2
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12601046 | VTP Corpartion LLP | Mr ABDUL KADAR MOHAMMED HAROON | 26/02/2026 |
| CC12601053 | VTP Corpartion LLP | BAJIRAO BALASAHEB KADAM | 26/02/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Jun 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 15 Jun 2019 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 15 Jun 2019 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Jun 2019Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 4 Jun 2024
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 5 (FY 2024-2025)File: FORM 5- PURVANCHAL F.pdf | 29 Aug 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A PURVANCHAL F BUILDING.pdf | 27 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Purvanchal F Building.pdf | 22 Apr 2025 |
| Certificates of CA (Form 3)File: FORM 3 Purvanchal F Building.pdf | 21 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Purvanchal F FORM 2.pdf | 21 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: PURVANCHAL F BLDG 31032025.pdf | 7 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: PURVANCHAL F BLDG 31122024.pdf | 16 Jan 2025 |
| Certificates of CA (Form 3)File: Form 3 - Purvanchal F.pdf | 14 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM PURVANCHAL F 31122024.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Phase III.pdf | 13 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Purvanchal F Building 30092024.pdf | 29 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PURVANCHAL F BUILDING 30092024.pdf | 19 Oct 2024 |
| Certificates of CA (Form 3)File: FORM_3_Purvanchal_Building_30-09-2024_compressed.pdf | 16 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: PURVANCHAL F.pdf | 14 Oct 2024 |
| Declaration in FORM BFile: AFFIDAVIT-PURVANCHAL F BUILDING.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Phase III - Form 5.pdf | 7 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Purvanchal F Building 30062024.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 PURVANCHAL F BUILDING 30062024.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Phase III.pdf | 18 Jul 2024 |
| Certificates of CA (Form 3)File: form 3 Purvanchal 3.pdf | 18 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: PURVANCHAL F 30062024.pdf | 10 Jul 2024 |
| Declaration in FORM BFile: 20240703004050_rotated.pdf | 3 Jul 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: kesnand F1 building completion certificate.pdf | 4 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A PURVANCHAL PHASE 3 31032024.pdf | 16 May 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTIORY PURVANCHAL PHASE 3 31122023.pdf | 10 May 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTIORY PURVANCHAL PHASE 3 31032024.pdf | 10 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PURVANCHAL PHASE 3 31032024.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 PURVANCHAL PHASE 3 31032024.pdf | 26 Apr 2024 |
| Certificates of CA (Form 3)File: FORM 3 PURVANCHAL PHASE 3 31032024.pdf | 26 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 PURVANCHAL F 31122023.pdf | 23 Jan 2024 |
| Certificates of CA (Form 3)File: FORM 3 PURVANCHAL F 31122023.pdf | 23 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PURVANCHAL F 31122023.pdf | 13 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: INVENTORY PURVANCHAL F 30062022.pdf | 8 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY PURVANCHAL F 30092022.pdf | 8 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY PURVANCHAL F 31122022.pdf | 8 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY PURVANCHAL F 31032023.pdf | 8 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY PURVANCHAL F 30062023.pdf | 8 Nov 2023 |
| Disclosure of sold/ booked inventoryFile: INVENTORY PURVANCHAL F 30092023.pdf | 8 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 PURVANCHAL PHASE 3 30092023.pdf | 28 Oct 2023 |
| Certificates of CA (Form 3)File: FORM 3 PURVANCHAL PHASE 3 30092023.pdf | 28 Oct 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PURVANCHAL F 30092023.pdf | 9 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Form 5 Purvanchal phase 3 22-23.pdf | 14 Sep 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FROM 1 PURVNCHAL F 30062023.pdf | 12 Sep 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Purvanchal Phase III - 300623.pdf | 25 Aug 2023 |
| Certificates of CA (Form 3)File: FORM 3 PURVANCHAL PHASE 3 30062023_compressed.pdf | 21 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PURVANCHAL PH 3 30062022.pdf | 26 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PURVANCHAL PH 3 30092022.pdf | 26 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PURVANCHAL PH 3 31122022.pdf | 26 Jul 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 PURVANCHAL PH 3 31032023.pdf | 26 Jul 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate PhIII Dec-21.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Purvanchal PhIII Mar22.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Purvanchal PhIII Jun-22.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Purvanchal PhIII Dec-22.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Purvanchal PhIII Sep-22.pdf | 23 Jun 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineering Certificate Purvanchal PhIII Mar-23.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 Purvanchal PhIII Dec-22_compressed.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3)File: Form 3 Purvanchal PhIII Mar-23_compressed.pdf | 23 Jun 2023 |
| Certificates of CA (Form 3)File: VTP Corp PhIII, Jun-22_compressed.pdf | 25 May 2023 |
| Certificates of CA (Form 3)File: VTP Corp PhIII, Sept-22_compressed.pdf | 25 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Purvanchal PhIII 300621.pdf | 13 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Purvanchal PhIII 300921.pdf | 13 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31122021.pdf | 13 Mar 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 31032022.pdf | 13 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3 30062021_compressed (2).pdf | 13 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3 30092021_compressed (2).pdf | 13 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3 31122021_compressed (2).pdf | 13 Mar 2023 |
| Certificates of CA (Form 3)File: Form 3 31032022_compressed (3).pdf | 13 Mar 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Purvanchal Phase III.pdf | 3 Dec 2022 |
| Details of encumbrancesFile: Purvanchal F.pdf | 14 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Purvanchal F.pdf | 12 Apr 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: SIGNED FORM-5_PH III_compressed.pdf | 1 Mar 2022 |
| Disclosure of sold/ booked inventoryFile: Purvanchal F.pdf | 12 Jan 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: f bldg-jan 21 to march 21.pdf | 11 Dec 2021 |
| Declaration about Commencement CertificateFile: Purvanchal F.pdf | 18 Nov 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: f bldg-jan 20 to march 20.pdf | 18 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Purvanchal Phase III 2019-20.pdf | 14 Jul 2021 |
| Certificates of CA (Form 3)File: fORM 3 (2).pdf | 28 Jun 2019 |
| Details of encumbrancesFile: Encumbrance_Certificate.pdf | 17 Jun 2019 |
| Building plan approvalFile: NEW BLOCK-Model-compressed (1).pdf | 15 Jun 2019 |
| Layout approvalFile: NEW BLOCK-Model-compressed (1).pdf | 15 Jun 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 7 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Purvanchal F Building on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near kesnand13,700+ in Pune
Filed coordinates, straight-line distance. 35 registered projects within 2 km.
Yashwin Enchante Phase 2
Vilas Javdekar Infinitee Developers Pvt. L
Godrej Greens
DREAM WORLD LANDMARKS LLP
Yashwin Enchante Phase 1
Vilas Javdekar Infinitee Developers Pvt. L
Kohinoor Kaleido
Intofinity Promoters Private Limited
VIJAY VIHAR
COL. RPS RAWAT
FLAMANTE BY VTP LUXE PHASE 1
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMI
Builder: VTP Corpartion LLP
VTP Corpartion LLP has 2 registrations on MahaRERA, including Purvanchal Phase1 AB and Purvanchal F Building. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that Purvanchal F Building shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Purvanchal F Building is delayed beyond 29 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Purvanchal F Building?
The registered promoter entity is VTP Corpartion LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Purvanchal F Building?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against Purvanchal F Building?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for Purvanchal F Building?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Purvanchal F Building?
The professionals named in the filing: Architect: VTP Realty; Architect: Ankur Associates; Architect: Minal Firake; Engineer: RAJESH MORE; Engineer: VTP Realty; Chartered Accountant: CA Priyanka Chordiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Purvanchal F Building?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback