Home / Browse projects / Kolhapur, Maharashtra / PUNYA SHLOK-TOWER 3

Registered No litigation declared Residential / Group Housing project

PUNYA SHLOK-TOWER 3

By RAMSINA CONSTRUCTIONS PVT LTD

RG-MH-30853 · RERA P53000079191 · Last updated on MahaRERA portal: 30 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Kolhapur registration emailed to you, free during the pilot beta.
Apr 2029Possession promisedmoved 4 months from the original
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 60%
18 of 20Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

PUNYA SHLOK-TOWER 3 is a Residential / Group Housing project by RAMSINA CONSTRUCTIONS PVT LTD in Kolhapur, Maharashtra, registered with MahaRERA as P53000079191 on 14 Feb 2025. Possession is promised by 30 Apr 2029. The completion date has moved by 4 months from the original filing. 2 of the 20 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NamePUNYA SHLOK-TOWER 3
  • TypeResidential / Group Housing
  • Location
    • C S NO 2100 / C-279
    • OLD R S NO 304/3
    • E WARD
    • Kolhapur (M Corp.)
    • Karvir
    • Kolhapur
    • 416005
  • Pincode416005
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P53000079191
  • ReraGenie IDRG-MH-30853

Builder

  • NameRAMSINA CONSTRUCTIONS PVT LTD
  • Entity typeCompany
  • DirectorVIKESH ABHAYKUMAR OSWAL
  • Other registrations3 more →
  • No longer live3 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2025First promiseDec 2028Revised toApr 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Feb 2025
  • Promised completion30 Apr 2029
  • Revised completionRevised to 30 Apr 2029 (originally 31 Dec 2028)
  • Buildings1 building record
  • Documents filed54 files

Current status

10%2 of 20 units booked
29.8%Work done, per cost certificate

Figures as on 30 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PUNYA SHLOK TOWER 3NA6520020

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.

PUNYA SHLOK TOWER 3: 40% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises25%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks60%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 30 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed70

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots70
Closed/Covered35
Open Space35

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area755 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Sep 2025
LandownerVillageDistrict
RAMSINA CONSTRUCTIONS PVT LTDKolhapur (M Corp.)Kolhapur
SALAG SAHAKARI GRUH NIRMAN SANSTHA MARYADIT KOPKolhapur (M Corp.)Kolhapur

Approvals and building plan

Sanctioning authorityKOLHAPUR MUNICIPAL CORPORATION KOLHAPUR
Permissible FSI2058.21
Proposed, not sanctioned2,058 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Vasant Plaza, Near Udyog Bhavan, Rajaram Road, Rajarampuri, Kolhapur.416001
Estimated costRs 6.26 cr
Cost incurredRs 1.87 cr
Work done29.81%
BuildingWingEstimatedIncurred
PUNYA SHLOK TOWER 3NARs 6.10 crRs 1.87 cr
-NARs 15.74 lakh-

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAmar Tendulkar Architects
EngineerShekhar Revalkar and Associates
EngineerAMIT D PATIL
Chartered AccountantSRUSHTI AKSHAY PARMAR
Chartered AccountantSAW & Associates
PartnerRole in project
RAMSINA CONSTRUCTIONS PVT LTD-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P53000079191/WarDec 2028 → Apr 2029

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 7 Jan 2025
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 7 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 7 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2029

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2024-2025)File: Form 2A_14022025to31032025.pdf30 Sep 2026
Form 2A (FY 2025-2026)File: Form 2A_01042025to31032026.pdf30 Sep 2026
Form 5 (FY 2024-2025)File: Form 5-202425.pdf30 Sep 2026
Form 5 (FY 2025-2026)File: Form 5-202526.pdf30 Sep 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 (F).pdf18 Jul 2026
Withdrawal Update Form 2File: Withdrawal Application Form2(F).pdf18 Jul 2026
Withdrawal Update Form 3File: Withdrawal Application Form3(F).pdf18 Jul 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 (F).pdf14 May 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 (F).pdf14 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form3_Shlok3_Q4202526_(F).pdf14 May 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 (F).pdf13 May 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 (F).pdf13 May 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 (F).pdf13 May 2026
Withdrawal Update Form 1File: Withdrawal Application Form1 (F).pdf16 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form2 (F).pdf16 Jan 2026
Withdrawal Update Form 3File: Withdrawal Application Form3 (F).pdf16 Jan 2026
Form 1File: Form-1-Architect's Certificate (F).pdf8 Sep 2025
Form 2File: Form-2-Engineer's certificate_Shlok (F).pdf8 Sep 2025
Form 3File: PUNYA SHLOK TOWER III MAR-25 (F).pdf8 Sep 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD BOOKED INVENTORY_Shlok_31032025.pdf8 Sep 2025
Withdrawal Update Form 1File: Form-1-Architectu0027s Certificate (F).pdf8 Sep 2025
Withdrawal Update Form 2File: Form-2-Engineeru0027s certificate_Shlok (F).pdf8 Sep 2025
Withdrawal Update Form 3File: PUNYA SHLOK TOWER III-JUNE-25 (F).pdf8 Sep 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3, CACertificate (F)R.pdf6 Feb 2025
Proforma of Allotment letterFile: MODEL FORM OF ALLOTMENT LETTER.pdf24 Jan 2025
Deviation Report with respect to Allotment letterFile: No Deviation Allotment Letter_Punya Shlok_Tower III.pdf24 Jan 2025
Deviation Report with respect to model copy of AgreementFile: No Deviation AFS_Punya Shlok Tower III.pdf24 Jan 2025
Proforma of Agreement for saleFile: Model Form of Agreement.pdf24 Jan 2025
Other - TechnicalFile: 6-Declaration-Cum-Undertaking Annexure A.pdf11 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: 1-RERA Designated Bank Account_Format A.pdf9 Jan 2025
Other - FinanceFile: 5-DECLARATION ABOUT FORM NO 3 (TABLE C).pdf9 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 2-RERA Designated Bank Account_Format B.pdf9 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: 3-Disclosure of Secured Unsecured Loan.pdf9 Jan 2025
Layout approvalFile: 5-LAYOUT_241231_120807_compressed.pdf7 Jan 2025
Building plan approvalFile: 6-PUNYA SHLOK t-3 SANCTION DWG_compressed.pdf7 Jan 2025
PAN CardFile: 1-PanCard Ramsina Constructions PVT LTD.pdf7 Jan 2025
Copy of the legal title reportFile: 2-1-Shlok_III_Flow of Title.pdf7 Jan 2025
Copy of the legal title reportFile: 2-2-Shlok_III_Legal Titile Report.pdf7 Jan 2025
Copy of the legal title reportFile: 2-3-Shlok_III_Title n Encumbrances Report.pdf7 Jan 2025
Details of encumbrances concerned to FinanceFile: 3-Encumbrance Related Finance.pdf7 Jan 2025
Details of encumbrances concerned to FinanceFile: 4-Encumbrance Related Legal.pdf7 Jan 2025
Copy of Layout Approval (in case of layout)File: 5-LAYOUT_241231_120807_compressed.pdf7 Jan 2025
Declaration in FORM BFile: 9-FORM-B_Ramsina Constructions PVT LTD_compressed.pdf7 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10-Form-1-Architect's Certificate (F).pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11-Form-2-Engineer's certificate_Shlok (F).pdf7 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: 7-CC_Shlok Tower III.pdf7 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 6-PUNYA SHLOK t-3 SANCTION DWG_compressed.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: 18-DISCLOSURE OF SOLD BOOKED INVENTORY_Shlok.pdf7 Jan 2025
Declaration about Commencement CertificateFile: 8-Declaration About CC.pdf7 Jan 2025
CERSAI detailsFile: 19-Cersai report Salag 2100 k 279.pdf7 Jan 2025
CERSAI detailsFile: 19-1-Declaration About Cersai.pdf7 Jan 2025
Details of encumbrances concerned to LegalFile: 3-Encumbrance Related Finance.pdf7 Jan 2025
Details of encumbrances concerned to LegalFile: 4-Encumbrance Related Legal.pdf7 Jan 2025
Disclosure of Interest in Other Real Estate OrganizationsFile: 21-Disclosure of interest in other organisations.pdf7 Jan 2025

How this compares with Kolhapur

10%of this project is bookeddistrict median 19%
17%of Kolhapur projects moved their completion datethis one moved by 4 months
25%of Kolhapur registrations have lapsed or been cancelledthis one is on the register

Computed across the 880+ Kolhapur projects on ReraGenie, from their own filings.

Keep PUNYA SHLOK-TOWER 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near E WARD880+ in Kolhapur

2 kmPUNYA SHLOK-TOWER 3Completed 44Lapsed / revoked 22Other 49Dot size: filed unitsN

Filed coordinates, straight-line distance. 115 registered projects within 2 km.

Builder: RAMSINA CONSTRUCTIONS PVT LTD

Ramsina Constructions Pvt. Ltd has 4 registrations on MahaRERA, including TUSTI and PUNYA ARPIT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Kolhapur district page.

Frequently asked questions

What are my rights if PUNYA SHLOK-TOWER 3 is delayed beyond 30 Apr 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PUNYA SHLOK-TOWER 3?

The registered promoter entity is RAMSINA CONSTRUCTIONS PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PUNYA SHLOK-TOWER 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PUNYA SHLOK-TOWER 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PUNYA SHLOK-TOWER 3?

The professionals named in the filing: Architect: Amar Tendulkar Architects; Engineer: Shekhar Revalkar and Associates; Engineer: AMIT D PATIL; Chartered Accountant: SRUSHTI AKSHAY PARMAR; Chartered Accountant: SAW & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PUNYA SHLOK-TOWER 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PUNYA SHLOK-TOWER 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PUNYA SHLOK-TOWER 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.