Home / Browse projects / Pune, Maharashtra / Puneville Phase III Cluster C

Registered No litigation declared Residential / Group Housing project

Puneville Phase III Cluster C

By Benchmarrk Realty LLP

RG-MH-36657 · RERA P52100051020 · Last updated on MahaRERA portal: 24 Jan 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 10 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2029Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 14%
9 of 104Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Puneville Phase III Cluster C is a Residential / Group Housing project by Benchmarrk Realty LLP in Pune, Maharashtra, registered with MahaRERA as P52100051020 on 22 May 2023. Possession is promised by 30 Dec 2029. 95 of the 104 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NamePuneville Phase III Cluster C
  • TypeResidential / Group Housing
  • Location
    • Kate wasti
    • Punawale
    • Mulshi
    • Pune
    • 411033
  • Pincode411033
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100051020
  • ReraGenie IDRG-MH-36657

Builder

  • NameBenchmarrk Realty LLP
  • Entity typePartnership
  • CINU68100PN2025PTC237318
  • CIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • PartnersBenchmarrk Promoters and Builders Pvt Ltd, Akash Rajendra Pharande, Anil Jayram Pharande, Ramesh Jayram Pharande, Ramesh Jayram Pharande, Anil Jayram Pharande, Akash Rajendra Pharande, Benchmarrk Promoters and Builders Pvt Ltd, Ramesh Jayram Pharande, Anil Jayram Pharande, Akash Rajendra Pharande, Benchmarrk Promoters and Builders Pvt Ltd
  • Other registrations10 more →
  • Completed2 of 11
  • No longer live3 lapsed, de-registered or revoked
  • Declared earlier projects3 →

Key dates

this monthRegisteredMay 2023PromisedDec 2029

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on22 May 2023
  • Promised completion30 Dec 2029
  • Revised completionNone
  • Buildings1 building record
  • Documents filed64 files

Current status

91%95 of 104 units booked

Figures as on 24 Jan 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
P WingNA28271040104

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 24 Jan 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 14%.

P Wing: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure14%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises3%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks6%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 24 Jan 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed104

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots104
Closed/Covered104

Land and ownership12

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,890 sq m
Land owned byThe promoter, with other names on the file
Named landowners12
LandownerVillageDistrict
Suresh Kashinath BhujbalPunawalePune
Kaushalya Suresh BhujbalPunawalePune
Yamuna Vitthal BhujbalPunawalePune
Vitthal Kashinath BhujbalPunawalePune
Rahul Suresh BhujbalPunawalePune
Kashinath Babu BhujbalPunawalePune
Mangesh Vitthal BhujbalPunawalePune
Seema Suresh BhujbalPunawalePune
M/s B.B DevelopersPunawalePune
Piloo Eruch AgaPimpri Chinchawad (M Corp.)Pune
Farheez Eruch AgaPimpri Chinchawad (M Corp.)Pune
Yezdi Eruch AgaPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI14326.96
Proposed, not sanctioned14,327 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNigdi, Pune

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVK architecture
EngineerAbhijit Shivaji Gaikwad
Chartered AccountantANJK & CO LLP
Chartered AccountantG N Mantri & Associates
PartnerRole in project
BENCHMARRK REALTY PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Feb 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 27 Jan 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 27 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2029

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PUNEVILLE PHASE III CLUSTER C_ARCHITECT CERTIFICATE_DECEMBER-24_ FORM-1.pdf24 Jan 2025
Disclosure of sold/ booked inventoryFile: PUNEVILLE PHASE III CLUSTER C_SOLD-UNSOLD_DECEMBER-24.pdf24 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PUNEVILLE PHASE III CLUSTER C_ARCHITECT CERTIFICATE_SEP-24_ FORM-1.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: PUNEVILLE PHASE III CLUSTER C_CA CERTIFICATE_FORM-5_2023-24.pdf15 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PUNEVILLE PHASE III CLUSTER C_ARCHITECT CERTIFICATE_JUNE-24_ FORM-1.pdf24 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PUNEVILLE PHASE III CLUSTER C_ENGINEER CERTIFICATE_JUNE-24_FORM-2.pdf24 Jul 2024
Disclosure of sold/ booked inventoryFile: PUNEVILLE PHASE III CLUSTER C_SOLD UN-SOLD_JUNE-24.pdf24 Jul 2024
Commencement Certificates / NA Order for plotted developmentFile: 8) COMMENCEMENT CERTIFICATE-R1.pdf21 Jun 2024
Declaration about Commencement CertificateFile: 9) DECLARATION ABOUT COMMENCEMENT CERTIFICATE-R1.pdf21 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10_PUNEVILLE PHASE III CLUSTER C_ARCHITECT CERTIFICATE_MAR-24_compressed.pdf21 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10_PUNEVILLE PHASE III CLUSTER C_ENGINEER CERTIFICATE_MAR-24_FORM-2_compressed.pdf21 May 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 8_PUNEVILLE PHASE III CLUSTER C_QUALITY CERTIFICATE_FORM-2A_2023-24_compressed.pdf13 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PUNEVILLE PHASE III CLUSTER C_CA CERTIFICATE_JUNE-23_ FORM-3_compressed.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PUNEVILLE PHASE III CLUSTER C_CA CERTIFICATE_SEP-23_ FORM-3_compressed.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PUNEVILLE PHASE III CLUSTER C_CA CERTIFICATE_DEC-23_ FORM-3_compressed.pdf5 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: PUNEVILLE PHASE III CLUSTER C_ FORM-2A_2023_compressed.pdf2 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PUNEVILLE PHASE III CLUSTER C_ARCHITECT CERTIFICATE_JUNE-23_ FORM-1.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PUNEVILLE PHASE III CLUSTER C_ARCHITECT CERTIFICATE_SEP-23_ FORM-1.pdf29 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PUNEVILLE PHASE III CLUSTER C_ARCHITECT CERTIFICATE_DEC-23_ FORM-1.pdf29 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PUNEVILLE PHASE III CLUSTER C_ENGINEER CERTIFICATE_JUNE-23_ FORM-2_compressed.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PUNEVILLE PHASE III CLUSTER C_ENGINEER CERTIFICATE_SEP-23_ FORM-2_compressed.pdf24 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PUNEVILLE PHASE III CLUSTER C_ENGINEER CERTIFICATE_DEC-23_ FORM-2_compressed.pdf24 Feb 2024
Disclosure of sold/ booked inventoryFile: PUNEVILLE PHASE III CLUSTER C_SOLD UNSOLD_JUNE-23_compressed.pdf24 Feb 2024
Disclosure of sold/ booked inventoryFile: PUNEVILLE PHASE III CLUSTER C_SOLD UNSOLD_SEP-23_compressed.pdf24 Feb 2024
Disclosure of sold/ booked inventoryFile: PUNEVILLE PHASE III CLUSTER C_SOLD UNSOLD_DEC-23_compressed.pdf24 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: 8) COMMENCEMENT CERTIFICATE-1-4.pdf19 May 2023
Commencement Certificates / NA Order for plotted developmentFile: CC UNDERTAKING.pdf19 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH-FORM-1.pdf12 May 2023
Building plan approvalFile: 5) LAYOUT PLAN.pdf27 Apr 2023
Building plan approvalFile: 5) LAYOUT DECLARATION.pdf27 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 5) LAYOUT PLAN.pdf27 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: 5) LAYOUT DECLARATION.pdf27 Apr 2023
Declaration about Commencement CertificateFile: 9) DECLARATION ABOUT COMMENCEMENT CERTIFICATE.pdf27 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGG-FORM-2.pdf27 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 18) CA CERTIFICATE.pdf24 Apr 2023
Other - TechnicalFile: 34) PARKING UNDERTAKING.pdf17 Mar 2023
Building plan approvalFile: PODIUM-4-1.PDF4 Mar 2023
Building plan approvalFile: PODIUM-4-2.PDF4 Mar 2023
Building plan approvalFile: PODIUM-4-3.PDF4 Mar 2023
Building plan approvalFile: PODIUM-4-4.PDF4 Mar 2023
Details of encumbrances concerned to FinanceFile: 3) ENCUMBRANCE FINANCE.pdf4 Mar 2023
Details of encumbrances concerned to LegalFile: 3) ENCUMBRANCE FINANCE.pdf4 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: PODIUM-4-1.PDF4 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: PODIUM-4-2.PDF4 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: PODIUM-4-3.PDF4 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: PODIUM-4-4.PDF4 Mar 2023
Deviation Report with respect to Allotment letterFile: 36) DEVAITION REPORT ALLOTMENT LETTER.pdf4 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 19) DIRECTOR INTEREST IN REAL ESTATE ORGANIZATION.pdf24 Feb 2023
Proforma of Agreement for saleFile: 24) AGREEMENT TO SALE.pdf24 Feb 2023
Deviation Report with respect to model copy of AgreementFile: 37) DEVIATION REPORT AGREEMENT.pdf23 Feb 2023
Copy of the legal title reportFile: 2) LEGAL TITLE REPORT.pdf20 Feb 2023
Details of encumbrances concerned to FinanceFile: 3) ENCUMBRANCE FINANCE.pdf20 Feb 2023
Details of encumbrances concerned to LegalFile: 3) ENCUMBRANCE FINANCE.pdf20 Feb 2023
Declaration in FORM BFile: 10) FORM B.pdf20 Feb 2023
CERSAI detailsFile: 17) CERSAI REGISTRATION.pdf20 Feb 2023
Proforma of Allotment letterFile: 25) ALLOTMENT LETTER.pdf20 Feb 2023
Layout approvalFile: 5) LAYOUT PLAN.pdf27 Jan 2023
Building plan approvalFile: 6) PLAN-1.pdf27 Jan 2023
Building plan approvalFile: 6) PLAN-2.pdf27 Jan 2023
PAN CardFile: 1) PANCARD CARD.pdf27 Jan 2023
Copy of Layout Approval (in case of layout)File: 5) LAYOUT PLAN.pdf27 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 6) PLAN-1.pdf27 Jan 2023
Building Plan Approval / NA Order for plotted developmentFile: 6) PLAN-2.pdf27 Jan 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 35) BANK NO ENCUMBRANCE CERTIFICATE.pdf27 Jan 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsRegisteredStatusPromisedDelivered
Puneville Phase II Cluster AP52100000440Punawale, Pune-Jul 2017CompletedDec 2023Registered original: Dec 2022Dec 2023
The EminenceP52100022805Punawale, Pune15Oct 2019CompletedSep 2023Sep 2023
Puneville Phase IP52100000441Punawale, Pune-Jul 2017CompletedJun 2022Registered original: Dec 2020Late, Jun 2024

How this compares with Pune

91%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Puneville Phase III Cluster C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Punawale13,700+ in Pune

2 kmPuneville Phase III ClusCompleted 97Lapsed / revoked 30Other 100Dot size: filed unitsN

Filed coordinates, straight-line distance. 227 registered projects within 2 km.

Builder: Benchmarrk Realty LLP

Benchmarrk Realty LLP has 11 registrations on MahaRERA, including Puneville Phase I and Puneville Phase II Cluster A. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Puneville Phase III Cluster C is delayed beyond 30 Dec 2029?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Puneville Phase III Cluster C?

The registered promoter entity is Benchmarrk Realty LLP, a partnership as per the filing. Its CIN U68100PN2025PTC237318 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Puneville Phase III Cluster C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Puneville Phase III Cluster C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Puneville Phase III Cluster C?

The professionals named in the filing: Architect: VK architecture; Engineer: Abhijit Shivaji Gaikwad; Chartered Accountant: ANJK & CO LLP; Chartered Accountant: G N Mantri & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Puneville Phase III Cluster C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Puneville Phase III Cluster C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Puneville Phase III Cluster C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.