Home / Browse projects / Mumbai Suburban, Maharashtra / PSK ALTAIR 77
PSK ALTAIR 77
RG-MH-18878 · RERA P51800077820 · Last updated on MahaRERA portal: 15 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 4 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 2 earlier projects delivered on promise
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PSK ALTAIR 77 is a Others project by JAYDEEP DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800077820 on 7 Nov 2024. Possession is promised by 30 Apr 2028. The completion date has moved by 4 months from the original filing. 3 of the 17 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NamePSK ALTAIR 77
- TypeOthers
- Location
- SARASWATI ROAD
- SANTACRUZ WEST
- Bandra
- Andheri
- Mumbai Suburban
- 400054
- Pincode400054
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800077820
- ReraGenie IDRG-MH-18878
Builder
- NameJAYDEEP DEVELOPERS
- Entity typePartnership
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on7 Nov 2024
- Promised completion30 Apr 2028
- Revised completionRevised to 30 Apr 2028 (originally 31 Dec 2027)
- Buildings1 building record
- Documents filed56 files
Current status
Figures as on 15 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PSK ALTAIR 77 | NA | 11 | 0 | 13 | 4 | 17 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 15 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 93%.
PSK ALTAIR 77: 53% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 93% |
| Podiums (if any) | 85% |
| Plinth | 100% |
| Stilt Floor | 85% |
| Slabs of Super Structure | 60% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 15% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 48% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 15 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed68
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| LOPA CO-OPERATIVE SOCIETY LIMITED | Bandra | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PSK ALTAIR 77 | NA | Rs 17.69 cr | Rs 9.73 cr |
| - | NA | Rs 11.80 cr | - |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Taranath Shetty & Associates |
| Engineer | Rajesh Ganpat Choudhari |
| Chartered Accountant | Nehali & Co. |
| Chartered Accountant | Vikram Viresh Bhate |
| Partner | Role in project |
|---|---|
| JAYDEEP DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterNA
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 11 Oct 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 11 Oct 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Oct 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Apr 2028
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form - 1_Q1_JDN.pdf | 15 Sep 2026 |
| Withdrawal Update Form 2File: JDN_Form 2_Q1.pdf | 15 Sep 2026 |
| Withdrawal Update Form 3File: JDN_Form-3_Q4.pdf | 15 Sep 2026 |
| Withdrawal Update Form 1File: Form 1_Q4_JDN.pdf | 6 Jun 2026 |
| Withdrawal Update Form 2File: JDN_Form-2_Q4.pdf | 6 Jun 2026 |
| Withdrawal Update Form 3File: JDN_Form-3_Q4.pdf | 6 Jun 2026 |
| Withdrawal Update Form 1File: Form - 1_Q3_JDN.pdf | 20 May 2026 |
| Withdrawal Update Form 2File: JDN_Form-2_Q3.pdf | 20 May 2026 |
| Withdrawal Update Form 3File: JDN_Form-3_Q3.pdf | 20 May 2026 |
| Withdrawal Update Form 1File: Form - 1_Q2_JDN.pdf | 4 May 2026 |
| Withdrawal Update Form 2File: JDN_Form-2_Q2.pdf | 4 May 2026 |
| Withdrawal Update Form 3File: JDN_Form-3_Q2.pdf | 4 May 2026 |
| Withdrawal Update Form 1File: Form - 1_Q1_JDN.pdf | 16 Apr 2026 |
| Withdrawal Update Form 2File: JDN_Form-2_Q1.pdf | 16 Apr 2026 |
| Withdrawal Update Form 3File: Declaration in form 3.pdf | 16 Apr 2026 |
| Form 1File: Form 1 (1).pdf | 12 Jul 2025 |
| Form 2File: Form 2 (2).pdf | 12 Jul 2025 |
| Form 3File: Form 3 (3).pdf | 12 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Discoluser of Inventory.pdf | 12 Jul 2025 |
| Other - TechnicalFile: Unit details statement certificate.pdf | 24 Jan 2025 |
| Other - TechnicalFile: Unit details statement certificate.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 22 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 22 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration in form 3.pdf | 23 Oct 2024 |
| Building plan approvalFile: APPROVED IOD CERTIFICATE_LOPA CHS.pdf | 11 Oct 2024 |
| Layout approvalFile: FINAL 3 PLAN.pdf | 11 Oct 2024 |
| PAN CardFile: Pan Card.pdf | 11 Oct 2024 |
| Copy of the legal title reportFile: Legal Title Report Dt FINAL.pdf | 11 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance of Project_rotated.pdf | 11 Oct 2024 |
| Details of encumbrances concerned to FinanceFile: No Encumbrance of land (1)_rotated (1).pdf | 11 Oct 2024 |
| Copy of Layout Approval (in case of layout)File: FINAL 3 PLAN.pdf | 11 Oct 2024 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL (10) (1).pdf | 11 Oct 2024 |
| Declaration in FORM BFile: Form b Declaration project_compressed.pdf | 11 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_rotated (1).pdf | 11 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 (5).pdf | 11 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_rotated.pdf | 11 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: PSK Altair 77 FirstCC_signed.pdf | 11 Oct 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: APPROVED IOD CERTIFICATE_LOPA CHS.pdf | 11 Oct 2024 |
| Declaration about Commencement CertificateFile: Format D (2).pdf | 11 Oct 2024 |
| CERSAI detailsFile: Cersai_rotated.pdf | 11 Oct 2024 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A (10).pdf | 11 Oct 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report (2).pdf | 11 Oct 2024 |
| Details of encumbrances concerned to LegalFile: No Encumbrance of Project_rotated.pdf | 11 Oct 2024 |
| Details of encumbrances concerned to LegalFile: No Encumbrance of land (1)_rotated (1).pdf | 11 Oct 2024 |
| Other - TechnicalFile: Annexure A (10).pdf | 11 Oct 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report on Agreement 08-10-2024.pdf | 11 Oct 2024 |
| Proforma of Agreement for saleFile: AGREEMENT FOR SALE MARKED IN YELLOW DEVIATION (1) (1) (1).pdf | 11 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Premji Patel_rotated.pdf | 11 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Annexure-A (Disclosure of Interest in Other Real Estate Organisation (4-10-2024).pdf | 11 Oct 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 7 Disclosure of Interest on Other real estate Organisation (5-10-2024).pdf | 11 Oct 2024 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Format B.pdf | 11 Oct 2024 |
| Disclosure for secured/unsecured finance availed for the projectFile: Disclosuer (1)_rotated.pdf | 11 Oct 2024 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Registered | Status | Promised | Delivered |
|---|---|---|---|---|---|---|
| CREST AND CELESTIAP51800030894 | AMBEDKAR NAGAR MULUND EAST, Mumbai Suburban | 83 | Sep 2021 | Completed | Dec 2024Registered original: Dec 2022 | Jul 2024 |
| ANUTHAMP51800006653 | mulund east, Mumbai Suburban | - | Aug 2017 | Completed | Jun 2023Registered original: Nov 2020 | Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PSK ALTAIR 77 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SANTACRUZ WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 312 registered projects within 2 km.
AVIARA
BALUWALA BUILDERS
Ruparel Panache
Ruparel Infra & Realty Pvt Ltd
Vascon Orchids
Vascon Engineers Ltd
COMMERZ 54
SHREE VINAYAK REALITY PRIVATE LIMITED
Vascon Onyx Residences
Vascon Engineers Ltd
REDEVELOPMENT OF SHINING STAR CHSL
PRANAV CONSTRUCTIONS LIMITED
See every Mumbai Suburban project, with the district possession charts
Builder: JAYDEEP DEVELOPERS
JAYDEEP DEVELOPERS has 1 registration on MahaRERA, including PSK ALTAIR 77. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if PSK ALTAIR 77 is delayed beyond 30 Apr 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PSK ALTAIR 77?
The registered promoter entity is JAYDEEP DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PSK ALTAIR 77?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PSK ALTAIR 77?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PSK ALTAIR 77?
The professionals named in the filing: Architect: Taranath Shetty & Associates; Engineer: Rajesh Ganpat Choudhari; Chartered Accountant: Nehali & Co.; Chartered Accountant: Vikram Viresh Bhate. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PSK ALTAIR 77?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback