Vascon Onyx Residences
RG-MH-95705 · RERA PM1180002601508 · Last updated on MahaRERA portal: 17 Jul 2026
Source: official MahaRERA filing
Red flags
- Encumbrance declared on the project land
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 11 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 9 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Vascon Onyx Residences is a Mixed project by Vascon Engineers Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as PM1180002601508 on 11 Aug 2026. Possession is promised by 30 Jun 2030.
At a glance
Project
- NameVascon Onyx Residences
- TypeMixed
- Location
- Relief road
- Santacruz West
- Vileparle
- Andheri
- Mumbai Suburban
- 400054
- Pincode400054
- MapView location on Google Maps (as filed on RERA)
- RERA no.PM1180002601508
- ReraGenie IDRG-MH-95705
Builder
- NameVascon Engineers Ltd
- Entity typeCompany
- CINL70100PN1986PLC175750
- GSTIN27AAACV1249F1ZI
- Track record4 past projects →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Aug 2026
- Promised completion30 Jun 2030
- Revised completionNone
- Buildings3 building records
- Documents filed9 files
Current status
Figures as on 17 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Residential Development | A | 11 | 9 | 40 | 2 | 42 |
| Residential Development | B | 11 | 9 | 16 | 2 | 18 |
| Residential Development | C | 11 | 9 | 40 | 2 | 42 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing.
Residential Development · wing A0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Residential Development · wing B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Residential Development · wing C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | 0% |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | 0% |
| Water Supply | No | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | 0% |
| Storm Water Drains | No | 0% |
| Landscaping & Tree Planting | No | 0% |
| Street Lighting | No | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | 0% |
| Electrical meter room, sub-station, receiving station | No | 0% |
| Aggregate area of recreational Open Space | No | 0% |
| Open Parking | No | Not applicable |
Parking filed213
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Stilt / Ground | Basement | Total |
|---|---|---|---|
| Residential Development A | 10 | 89 | 99 |
| Residential Development B | 1 | 33 | 34 |
| Residential Development C | 0 | 80 | 80 |
Land and ownership1
MahaRERA does not publish landowner contact details.
| Landowner | Village | District |
|---|---|---|
| Prakash Cooperative Housing Society Limited | Vileparle | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Karan Daisaria |
| Engineer | Darshan Vasudevan Yadav |
| Chartered Accountant | Manish Surana |
| Chartered Accountant | Sharp & Tannan Associates Chartered Accontants |
| Partner | Role in project |
|---|---|
| Vascon Engineers Ltd | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
Documents filed9
As listed on the registration. The files themselves are on the MahaRERA portal.
| Document | Uploaded |
|---|---|
| Sheet No 7 All Building Units highlighted in this plan | 17 Jul 2026 |
| Sheet 1 Main Layout FSI plot area parking highlighted | 17 Jul 2026 |
| Declaration cum Undertaking R1 | 16 Jul 2026 |
| IOD Sheet 2 | 3 Jul 2026 |
| IOD Sheet 3 | 3 Jul 2026 |
| IOD Sheet 4 | 3 Jul 2026 |
| IOD Sheet 5 | 3 Jul 2026 |
| IOD Sheet 6 | 3 Jul 2026 |
| IOD Sheet 8 | 3 Jul 2026 |
Promoter's earlier projects5
As disclosed by the promoter in this filing.
| Project | Status | Promised | Delivered | Litigation |
|---|---|---|---|---|
| Willows | Completed | Nov 2013 | Late, Apr 2015 | No |
| EcoTower | Completed | Aug 2014 | Late, Nov 2016 | No |
| Forest County | Completed | Dec 2017 | Apr 2017 | No |
| ELA Hadapsar | Completed | Dec 2014 | Late, Jul 2017 | No |
| Forest County | Completed | Dec 2017 | Apr 2017 | No |
How this compares with Mumbai Suburban
Computed across the 6,722 Mumbai Suburban projects on ReraGenie, from their own filings.
Track Vascon Onyx Residences
Save this project to your account and get an email when its filing changes: status, dates, complaints, new documents. Free during the pilot beta.
Other projects near Santacruz West6,722 in Mumbai Suburban
AVIARA
BALUWALA BUILDERS
Ruparel Panache
Ruparel Infra & Realty Pvt Ltd
Vascon Orchids
Vascon Engineers Ltd
COMMERZ 54
SHREE VINAYAK REALITY PRIVATE LIMITED
REDEVELOPMENT OF SHINING STAR CHSL
PRANAV CONSTRUCTIONS LIMITED
Artteza
SUNVISION ESTATES
See every Mumbai Suburban project, with the district possession charts
Builder: Vascon Engineers Ltd
Vascon Engineers Ltd has 12 registrations on MahaRERA, including Vista II and Windermere Phase 1. Its filings disclose 4 earlier MahaRERA projects: 1 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Vascon Onyx Residences is delayed beyond 30 Jun 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Vascon Onyx Residences?
The registered promoter entity is Vascon Engineers Ltd, a company as per the filing. Its CIN L70100PN1986PLC175750 and GSTIN 27AAACV1249F1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Vascon Onyx Residences?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Vascon Onyx Residences?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Vascon Onyx Residences?
The professionals named in the filing: Architect: Karan Daisaria; Engineer: Darshan Vasudevan Yadav; Chartered Accountant: Manish Surana; Chartered Accountant: Sharp & Tannan Associates Chartered Accontants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Vascon Onyx Residences?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.