Registered No litigation declared Mixed project

Vascon Onyx Residences

RG-MH-95705 · RERA PM1180002601508 · Last updated on MahaRERA portal: 17 Jul 2026

Source: official MahaRERA filing

Red flags

  • Encumbrance declared on the project land

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
Jump to the 9 documents Report an error

Vascon Onyx Residences is a Mixed project by Vascon Engineers Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as PM1180002601508 on 11 Aug 2026. Possession is promised by 30 Jun 2030.

At a glance

Project

  • NameVascon Onyx Residences
  • TypeMixed
  • Location
    • Relief road
    • Santacruz West
    • Vileparle
    • Andheri
    • Mumbai Suburban
    • 400054
  • Pincode400054
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PM1180002601508
  • ReraGenie IDRG-MH-95705

Builder

  • NameVascon Engineers Ltd
  • Entity typeCompany
  • CINL70100PN1986PLC175750
  • GSTIN27AAACV1249F1ZI
  • Track record4 past projects →

Key dates

todayRegisteredAug 2026PromisedJun 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on11 Aug 2026
  • Promised completion30 Jun 2030
  • Revised completionNone
  • Buildings3 building records
  • Documents filed9 files

Current status

0%0 of 102 units booked

Figures as on 17 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Residential DevelopmentA11940242
Residential DevelopmentB11916218
Residential DevelopmentC11940242

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing.

Residential Development · wing A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Residential Development · wing B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Residential Development · wing C0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNo0%
Open ParkingNoNot applicable

Parking filed213

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots213
Stilt / Ground11
Basement202
BuildingStilt / GroundBasementTotal
Residential Development A108999
Residential Development B13334
Residential Development C08080

Land and ownership1

MahaRERA does not publish landowner contact details.

Land area3,540 sq m
Promoter owns the landNo
Named landowners1
Encumbrance on the landDeclared present
CERSAI search filedYes
Declared on14 Jul 2026
LandownerVillageDistrict
Prakash Cooperative Housing Society LimitedVileparleMumbai Suburban

Approvals and building plan

Permissible FSI11944.35
Proposed, not sanctioned11,944 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Satguru House 362/6, CTS. No. 30, Ground Floor, Bund Garden Road, Pune.411001

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKaran Daisaria
EngineerDarshan Vasudevan Yadav
Chartered AccountantManish Surana
Chartered AccountantSharp & Tannan Associates Chartered Accontants
PartnerRole in project
Vascon Engineers Ltd-

Complaints filed with MahaRERA

No complaints on record against this registration.

Documents filed9

As listed on the registration. The files themselves are on the MahaRERA portal.

DocumentUploaded
Sheet No 7 All Building Units highlighted in this plan17 Jul 2026
Sheet 1 Main Layout FSI plot area parking highlighted17 Jul 2026
Declaration cum Undertaking R116 Jul 2026
IOD Sheet 23 Jul 2026
IOD Sheet 33 Jul 2026
IOD Sheet 43 Jul 2026
IOD Sheet 53 Jul 2026
IOD Sheet 63 Jul 2026
IOD Sheet 83 Jul 2026

Promoter's earlier projects5

As disclosed by the promoter in this filing.

2 delivered on promise3 delivered late
ProjectStatusPromisedDeliveredLitigation
WillowsCompletedNov 2013Late, Apr 2015No
EcoTowerCompletedAug 2014Late, Nov 2016No
Forest CountyCompletedDec 2017Apr 2017No
ELA HadapsarCompletedDec 2014Late, Jul 2017No
Forest CountyCompletedDec 2017Apr 2017No

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
31%of Mumbai Suburban projects moved their completion datethis one has not
22%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,722 Mumbai Suburban projects on ReraGenie, from their own filings.

Track Vascon Onyx Residences

Save this project to your account and get an email when its filing changes: status, dates, complaints, new documents. Free during the pilot beta.

How alerts work

Other projects near Santacruz West6,722 in Mumbai Suburban

Builder: Vascon Engineers Ltd

Vascon Engineers Ltd has 12 registrations on MahaRERA, including Vista II and Windermere Phase 1. Its filings disclose 4 earlier MahaRERA projects: 1 of 4 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Vascon Onyx Residences is delayed beyond 30 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Vascon Onyx Residences?

The registered promoter entity is Vascon Engineers Ltd, a company as per the filing. Its CIN L70100PN1986PLC175750 and GSTIN 27AAACV1249F1ZI can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Vascon Onyx Residences?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Vascon Onyx Residences?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Vascon Onyx Residences?

The professionals named in the filing: Architect: Karan Daisaria; Engineer: Darshan Vasudevan Yadav; Chartered Accountant: Manish Surana; Chartered Accountant: Sharp & Tannan Associates Chartered Accontants. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Vascon Onyx Residences?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Planning to buy here? The Rs 499 buyer report adds red flags, the progress-versus-promise read, this promoter's other registrations and what the filed documents say, plus a ZIP of every document on the filing. It includes the Rs 299 project watch free for 90 days: an email in plain words every time this project's filing changes. See a real sample report before you buy. Get the buyer report · Rs 499
Studying this micro-market? The developer project analysis maps every registration within 5 km of this project from filed coordinates, reads what the market absorbs and what competes, prices the parcel, and takes the promoter's whole book apart, facts with their N, never a verdict. See a complete sample first. Get the developer analysis · Rs 2,999

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Vascon Onyx Residences. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.