Registration lapsed No litigation declared Others project

ANUTHAM

By AMARDEEP CONSTRUCTIONS

RG-MH-21012 · RERA P51800006653 · Last updated on MahaRERA portal: 13 Apr 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 40 months past the filed date
  • 32 complaints at MahaRERA
  • Completion date moved by 31 months
  • 1 extension taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Jun 2023Possession promised40 months past this date
19 of 44Construction stages doneacross 4 buildings; furthest along: Staircases, 97%
32Complaints at MahaRERAon this registration
Jump to the 93 documents Report an error

ANUTHAM is a Others project by AMARDEEP CONSTRUCTIONS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800006653 on 16 Aug 2017. Possession was promised by 30 Jun 2023 and is now 40 months past that date. The completion date has moved by 31 months from the original filing. 32 complaints are on record with the regulator.

At a glance

Project

  • NameANUTHAM
  • TypeOthers
  • Location
    • 90 feet road
    • mulund east
    • Kurla
    • Mumbai Suburban
    • 400081
  • Pincode400081
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800006653
  • ReraGenie IDRG-MH-21012

Builder

  • NameAMARDEEP CONSTRUCTIONS
  • Entity typePartnership
  • PartnersJERAM J GAMI, GOVIND J GAMI, PREMJI V PATEL

Key dates

40 months past promisethis monthRegisteredAug 2017First promiseNov 2020Revised toJun 2023

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on16 Aug 2017
  • Promised completion30 Jun 2023
  • Revised completionRevised to 30 Jun 2023 (originally 30 Nov 2020)
  • Buildings4 building records
  • Documents filed93 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Sale building no 1NA50000
Building 3 Rehab Parampujya Dr Babasaheb Ambedkar Nagar SRA CHS Ltd A to D WingNA200000
Building no 4 Rehab Parampujya Dr Babasaheb Ambedkar Nagar SRA CHS Ltd A WingNA220000
ANUTHAM A, B, D,E WING ,C WING-VEENANA300000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 13 Apr 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Staircases, at 97%.

Sale building no 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Building 3 Rehab Parampujya Dr Babasaheb Ambedkar Nagar SRA CHS Ltd A to D Wing100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Building no 4 Rehab Parampujya Dr Babasaheb Ambedkar Nagar SRA CHS Ltd A Wing56%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor80%
Slabs of Super Structure90%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises54%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ANUTHAM A, B, D,E WING ,C WING-VEENA73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)70%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises57%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks97%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.84%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 13 Apr 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable
SWIMMING POOL AND GYMYes0%
RECREATION GROUNDYes0%

Parking filed401

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots401
Closed/Covered401
BuildingClosed/CoveredTotal
Sale building no 133
ANUTHAM A, B, D,E WING ,C WING-VEENA398398

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area12,337 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
M/S SHREE SAMARTH SPARK DEVELOPERS LLPMumbai CityMumbai City
AMARDEEP CONSTRUCTIONSKurlaMumbai Suburban

Approvals and building plan

Permissible FSI44175.86
Proposed, not sanctioned37,011 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch1B / 1C, Laxmi residency, A Wing,Wagle estate,Shivaji Nagar, Thane west-400604

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDILIP JAYAWANT & ASSOCIATES
PartnerRole in project
AMARDEEP CONSTRUCTIONS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800008522Nov 2020 → Dec 2022

Reason as filed by the promoter1) Due to current pandemic situation arising due to COVID-19, the progress of construction activities have been severely impacted and the site activities completely stopped during lockdown period. The construction activities have been drastically slow-down due to reverse migration of laborers to their native places. 2) The Urban Development Department, Government of Maharashtra’s Notification under no. TPB-4320/88/UD-11 dated 13th March 2020 directed/instructed the Chief Executive Engineer, Slum Rehabilitation Authority, Mumbai “under section 154 of M.R. & T.P. Act, 1966 regarding incentive FS

Complaints filed with MahaRERA32

Case no.ComplainantRespondentFiled
CC006000000210017Sachin Dhyaneshwar MoreM/s. Amardeep Constructions14/02/2022
CC006000000193396Gaurav Kirit VithlaniAmardeep Constructions08/07/2020
CC006000000193397Kirit K. VithlaniAmardeep Constructions08/07/2020
CC006000000198895DEEPALI LOHOTAMARDEEP CONSTRUCTIONS31/10/2021
CC006000000198896PRAFUL VILAS PATILAMARDEEP CONSTRUCTIONS01/11/2021
CC006000000198898Poornima PatilAnutham Constructions31/10/2021
CC006000000198899SACHIN RAMCHANDRA CHAVANAMARDEEP CONSTRUCTIONS01/11/2021
CC006000000198906rajesh devji chamariaANUTHAM CONSTRUCTION01/11/2021
CC006000000198908DEEPAK KURLEANUTHAM CONSTRUCTIONS01/11/2021
CC006000000198909ANAND CHANDRAKANT AGRAWALANUTHAM CONSTRUCTIONS01/11/2021
CC006000000198924VISHAKA VILAS SHINDEANUTHAM CONSTRUCTIONS03/11/2021
CC006000000198925SONALI KANDALKARM/S Amardeep Constructions03/11/2021
CC006000000198927Atul Parashuram ThamakeAmardeep Constructions03/11/2021
CC006000000198928Radha Keshav ChavanAmardeep Constructions04/11/2021
CC006000000198933ATUL SHIRODKARAMARDEEP CONSTRUCTIONS06/11/2021
CC006000000198934ATUL SHIRODKARAMARDEEP CONSTRUCTIONS05/11/2021
CC006000000198935SUSHANT CHAVANAMARDEEP CONSTRUCTIONS05/11/2021
CC006000000198937Manoj DesaiAMARDEEP CONSTRUCTIONS05/11/2021
CC006000000303568AjitKumar Birendranath OjhaM/s Amardeep Constructions06/12/2022
CC006000000396592Amol DeshpandeAmardeep Constructions06/07/2023
CC006000000408346Hirak Kishor ShahM/S Amardeep Constructions06/12/2023
CC006000000439632Aditi Arvind DaniAmardeep Constructions12/03/2024
CC006000000480377M/s. Amardeep ConstructionsAtul Shirodkar08/05/2024
CC006000000480385M/s. Amardeep ConstructionsAtul Shirodkar08/05/2024
CC006000000480387M/s. Amardeep ConstructionsAjitkumar Birendranath Ojha08/05/2024
CC12502972Praveen Ramchand BudhraniAMARDEEP CONSTRUCTIONS23/08/2025
CC12503442Sachin Dnyaneshwar MoreAMARDEEP CONSTRUCTIONS26/09/2025
CC12600150Kunal Lahu BhorAMARDEEP CONSTRUCTIONS09/01/2026
CC12600753Gopal Dinkar KhatkeAMARDEEP CONSTRUCTIONS09/02/2026
CC12602352AMARDEEP CONSTRUCTIONSMr Uttam Suryakant Tamhanekar21/04/2026
CC12603392Om Khemraj GahlotAMARDEEP CONSTRUCTIONS03/06/2026
CC12603393Om Khemraj GahlotAMARDEEP CONSTRUCTIONS03/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 7 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed93

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 93 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 31-3-2023_compressed.pdf13 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGG CERTIFICATE 30-6-22_compressed.pdf12 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGG CERTIFICATE 30-9-22_compressed.pdf12 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGG CERTIFICATE 31-12-22_compressed.pdf12 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 ENGG CERTIFICATE 31-3-2023_compressed.pdf12 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: FORM -2A Quality certificate March 2023.pdf12 Apr 2024
Certificates of CA (Form 3)File: Signed Form 3 as on 30-6-22_compressed.pdf12 Apr 2024
Certificates of CA (Form 3)File: Signed Form 3 as on 30-9-22_compressed.pdf12 Apr 2024
Certificates of CA (Form 3)File: Signed Form 3 as on 31-12-22_compressed.pdf12 Apr 2024
Certificates of CA (Form 3)File: Signed Form 3 as on 31-3-23_compressed.pdf12 Apr 2024
Certificates of CA (Form 5)File: Signed Form 5 FY 19-20.pdf12 Apr 2024
Certificates of CA (Form 5)File: Signed Form 5 FY 20-21.pdf12 Apr 2024
Certificates of CA (Form 5)File: Signed Form 5 FY 21-22.pdf12 Apr 2024
Certificates of CA (Form 5)File: Signed Form 5 FY 22-23.pdf12 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Signed Form 5 FY 19-20.pdf12 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Signed Form 5 FY 20-21.pdf12 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Signed Form 5 FY 21-22.pdf12 Apr 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Signed Form 5 FY 22-23.pdf12 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: ORIGINAL UPDATED CC COPY SALE BLDG 2 2021.PDF7 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 31 MAR 2022_compressed.pdf26 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed FORM 2 As on 31 12 21.pdf26 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed FORM 2 As on 31 03 22.pdf26 Jun 2023
Certificates of CA (Form 3)File: RERA CA CERTIFICATE 3112 2021 compressed.pdf26 Jun 2023
Certificates of CA (Form 3)File: RERA CA CERTIFICATE 31 03 2022 compressed.pdf26 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 31 March 2018.pdf22 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFCATE 31 march 2019 compressed.pdf22 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect certificate 31 3 2020compressed.pdf22 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE 31 MARCH 2021 compressed.pdf22 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed FORM 2 As on 31 March 2018.pdf22 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed FORM 2 As on 31 March19.pdf22 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed FORM 2 As on 31 3 20.pdf22 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed FORM 2 As on 31 3 21.pdf22 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed FORM 2 As on 30 6 21.pdf22 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Signed FORM 2 As on 30 9 21.pdf22 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: QUALITY CERTIFICATE 2021-22 - ok.PDF22 Jun 2023
Certificates of CA (Form 3)File: Signed RERA Form 3 as on 31-3-2018_compressed.pdf22 Jun 2023
Certificates of CA (Form 3)File: Signed RERA Form 3 as on 31-3-2019_compressed.pdf22 Jun 2023
Certificates of CA (Form 3)File: Signed RERA Form 3 as on 31-3-2020_compressed.pdf22 Jun 2023
Certificates of CA (Form 3)File: Signed RERA Form 3 as on 31-3-2021_compressed.pdf22 Jun 2023
Certificates of CA (Form 3)File: Signed RERA Form 3 as on 30-06-2021_compressed.pdf22 Jun 2023
Certificates of CA (Form 3)File: Signed RERA Form 3 as on 30-09-2021_compressed.pdf22 Jun 2023
OtherFile: SA 506 2022.pdf2 Nov 2022
OtherFile: 516 2022.pdf2 Nov 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY CERTIFICATE -FY 2019-2020.pdf6 Aug 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY CERTIFICATE - FY 2020-2021.pdf6 Aug 2022
CERSAI detailsFile: CERSAI_Search_Report_Asset_Based_Search.pdf6 Aug 2022
CERSAI detailsFile: CERSAI_Search_Report_Debtors_Based_Search.pdf6 Aug 2022
Details of encumbrancesFile: NO ENCUMBRANCE.pdf2 Feb 2022
Building plan approvalFile: IOD 1 3.pdf28 Jul 2021
Building plan approvalFile: IOD 4 5.pdf28 Jul 2021
Building plan approvalFile: IOD 6 7.pdf28 Jul 2021
Building plan approvalFile: IOD 7 8.pdf28 Jul 2021
Building plan approvalFile: IOD 9 11.pdf28 Jul 2021
Building Plan Approval (IOD)File: IOD 1 3.pdf28 Jul 2021
Building Plan Approval (IOD)File: IOD 4 5.pdf28 Jul 2021
Building Plan Approval (IOD)File: IOD 6 7.pdf28 Jul 2021
Building Plan Approval (IOD)File: IOD 7 8.pdf28 Jul 2021
Building Plan Approval (IOD)File: IOD 9 11.pdf28 Jul 2021
Declaration about Commencement CertificateFile: 7 DECLARATION FORMAT D 2672021.PDF26 Jul 2021
Disclosure of sold/ booked inventoryFile: 6 SSSD Sold Book Unsold flat Mulundcompressed.pdf15 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: 1 ARCHITECT LETTER 2021compressed.pdf13 Jul 2021
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: 3 RERA ENGG CERTIFICATE 1752021compressed.pdf13 Jul 2021
Disclosure of sold/ booked inventoryFile: 1 ARCHITECT LETTER 2021compressed.pdf13 Jul 2021
Disclosure of sold/ booked inventoryFile: 2 AC Disclosure of Sold Unsoldcompressed.pdf13 Jul 2021
Certificates of CA (Form 3)File: Amardeep Constructions RERA - CA Certificate Compressed and Final.pdf5 Feb 2020
Certificates of CA (Form 5)File: Amardeep Constructions Form 5.pdf18 Dec 2019
Certificates of CA (Form 5)File: Amardeep Constructions Form 5.pdf18 Dec 2019
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Amardeep Constructions Form 5.pdf18 Dec 2019
Certificates of CA (Form 5)File: Form 5 - Anutham.pdf15 Oct 2018
Commencement Certificates / NA Order for plotted developmentFile: New CC copy.PDF9 Mar 2018
Proforma of Allotment letterFile: Sale Agreement.pdf26 Oct 2017
Proforma of Allotment letterFile: Co Promoter RERA Sale Agreement Final.pdf26 Oct 2017
Building plan approvalFile: Plan App Bldg 4.pdf29 Jul 2017
Building plan approvalFile: Plan app bldg no 3.pdf29 Jul 2017
Building plan approvalFile: Plan app plan bldg no2.pdf29 Jul 2017
Building plan approvalFile: IOA- 1 mb compressed (1).pdf29 Jul 2017
PAN CardFile: Pan Card.pdf29 Jul 2017
Building Plan Approval (IOD)File: IOA- 1 mb compressed (1).pdf29 Jul 2017
Building Plan Approval (IOD)File: Plan app plan bldg no2.pdf29 Jul 2017
Building Plan Approval (IOD)File: Plan App Bldg 4.pdf29 Jul 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one moved by 31 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is among them

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ANUTHAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near mulund east6,700+ in Mumbai Suburban

2 kmANUTHAMCompleted 106Lapsed / revoked 91Other 136Dot size: filed unitsN

Filed coordinates, straight-line distance. 333 registered projects within 2 km.

Builder: AMARDEEP CONSTRUCTIONS

AMARDEEP CONSTRUCTIONS has 1 registration on MahaRERA, including ANUTHAM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What does it mean that ANUTHAM shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if ANUTHAM is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ANUTHAM?

The registered promoter entity is AMARDEEP CONSTRUCTIONS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ANUTHAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against ANUTHAM?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for ANUTHAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ANUTHAM?

The professionals named in the filing: Architect: DILIP JAYAWANT & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ANUTHAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ANUTHAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ANUTHAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.