Home / Browse projects / Mumbai Suburban, Maharashtra / Ruparel Panache

Registered No litigation declared Residential / Group Housing project

Ruparel Panache

By Ruparel Infra & Realty Pvt Ltd

RG-MH-42750 · RERA P51800046597 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
21 of 33Construction stages doneacross 3 buildings; furthest along: Installation of Lifts, 95%
73 of 148Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 116 documents Report an error

Ruparel Panache is a Residential / Group Housing project by Ruparel Infra & Realty Pvt Ltd in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800046597 on 25 Aug 2022. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 75 of the 148 units on this registration are recorded sold or booked, and 21 of 33 construction stages are filed complete.

At a glance

Project

  • NameRuparel Panache
  • TypeResidential / Group Housing
  • Location
    • STATION ROAD
    • SANTACRUZ (W)
    • Andheri
    • Mumbai Suburban
    • 400054
  • Pincode400054
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800046597
  • ReraGenie IDRG-MH-42750

Builder

  • NameRuparel Infra & Realty Pvt Ltd
  • Entity typeCompany
  • Managing DirectorAmit Ruparel
  • Other registrations1 more →

Key dates

this monthRegisteredAug 2022First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on25 Aug 2022
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings3 building records
  • Documents filed116 files

Current status

51%75 of 148 units booked
59.3%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
wing CNA171731536
Wing BNA141439746
Wing ANA171766066

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

21 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 95%.

wing C80%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Wing B80%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
Wing A80%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises90%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes75%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes75%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes90%
Water conservation /Rain water harvestingYes60%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes95%
Electrical meter room, sub-station, receiving stationYes75%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed252

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots252
Closed/Covered252
BuildingClosed/CoveredTotal
wing C2323
Wing B102102
Wing A127127

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,186 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Nov 2025
LandownerVillageDistrict
Ruparel Infra and Realty Pvt. Ltd.-Mumbai City

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority
Permissible FSI10512.59
Proposed, not sanctioned10,513 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchLOWER PAREL
Estimated costRs 284.10 cr
Cost incurredRs 168.58 cr
Work done59.34%
BuildingWingEstimatedIncurred
Wing ANARs 145.18 crRs 86.15 cr
Wing BNARs 100.91 crRs 59.88 cr
wing CNARs 38.01 crRs 22.55 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRahul Kamathi
EngineerAjay Pandurang Gade
Chartered AccountantShereena
Chartered AccountantSarveshwar Sharma
PartnerRole in project
Ruparel Infra & Realty Pvt Ltd-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA21112518400Dec 2025 → Dec 2026

Reason as filed by the promoter“Ruparel Panache” (MahaRERA Registration No. P51800046597) is a single residential redevelopment project comprising three wings (A, B and C) with Ground + 18 floors and two parking towers. The project is being developed by M/s. Ruparel Infra and Realty Pvt. Ltd. under the Slum Redevelopment Scheme (SRA) in accordance with Regulation 33(10) of DCPR 2034. The latest MahaRERA registration is valid up to 31 December 2025. The project has faced delays due to circumstances beyond the control of the promoter. A major impediment arose from delayed evacuation of occupants from the existing dilapidated

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Feb 2026Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed116

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 116 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 Ruparel Panache 31032026.pdf21 Apr 2026
Withdrawal Update Form 2File: Form 2 Ruparel Panache 31032026.pdf21 Apr 2026
Withdrawal Update Form 3File: Form 3 Ruparel Panache 31032026.pdf21 Apr 2026
Withdrawal Update Form 1File: Form 1 Ruparel Panache 30092025.pdf15 Apr 2026
Withdrawal Update Form 2File: Form-2 Ruparel Panache 31012026.pdf15 Apr 2026
Withdrawal Update Form 3File: Form-3 Ruparel Panache 31012026.pdf15 Apr 2026
Layout approvalFile: Lay Out Plan 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P2 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P3 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P4 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P5 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P6 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P7 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P8 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P9 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P10 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P11 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P12 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P13 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P14 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P15 200924.pdf18 Feb 2026
Building plan approvalFile: IOA P16 200924.pdf18 Feb 2026
Commencement certificateFile: 05 CC Reendorsed Wing A B C upto 17 and Wing B Extended upto 17 Flr dt 20 0924.pdf18 Feb 2026
Withdrawal Update Form 1File: Form-1 Ruparel Panache 31012026.pdf18 Feb 2026
Withdrawal Update Form 2File: Form-2 Ruparel Panache 31012026.pdf18 Feb 2026
Withdrawal Update Form 3File: Form-3 Ruparel Panache 31012026.pdf18 Feb 2026
Withdrawal Update Form 1File: Form 1 Ruparel Panache 30092025.pdf14 Nov 2025
Withdrawal Update Form 2File: Form 2 Ruparel Panache 30092025.pdf14 Nov 2025
Withdrawal Update Form 3File: Form 3 Ruparel Panache 30092025.pdf14 Nov 2025
Form 2A (FY 2025-2026)File: Form 2A FY 2025-26.pdf13 Nov 2025
Form 5 (FY 2022-2023)File: Ruparel Panache Form 5 FY 2022-23.pdf13 Nov 2025
Form 5 (FY 2023-2024)File: Ruparel Panache Form 5 FY 2023-24.pdf13 Nov 2025
Form 5 (FY 2024-2025)File: Ruparel Panache Form 5 FY 2024-25.pdf13 Nov 2025
Form 2A (FY 2022-2023)File: Form 2A Ruparel Panache 31032023.pdf10 Nov 2025
Form 2A (FY 2023-2024)File: Form 2A Ruparel Panache 31032024.pdf10 Nov 2025
Form 2A (FY 2024-2025)File: Ruparel Panahche Form 2A 31032025.pdf10 Nov 2025
Building plan approvalFile: IOA P2 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P3 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P4 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P5 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P6 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P7 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P8 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P9 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P10 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P11 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P12 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P13 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P14 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P15 200924_rotated.pdf29 Sep 2025
Building plan approvalFile: IOA P16 200924_rotated.pdf29 Sep 2025
Layout approvalFile: Lay Out Plan 200924.pdf29 Sep 2025
Layout approvalFile: Lay Out Plan 200924_rotated.pdf29 Sep 2025
Form 1File: Form 1 Ruparel Panache 300625.pdf26 Sep 2025
Form 2File: Form 2 Ruparel Panache 300625.pdf26 Sep 2025
Form 3File: Form 3 Ruparel Panache 300625.pdf26 Sep 2025
Disclosure of Sold and Booked InventoryFile: Ruparel Panache Sold Unsold Inventory 30062025.pdf26 Sep 2025
Form 1File: Ruparel Panache Form 1 31032025.pdf23 May 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 4 Ruparel Panache Form 2A Final.pdf15 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Ruparel Panache-Form-1.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ruparel Panache-Form-3.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Ruparel Panache-Form-2.pdf7 Feb 2025
Proforma of Allotment letterFile: Allotment Letter and AFS FL.pdf22 Aug 2022
Deviation Report with respect to model copy of AgreementFile: AFS deviation report 1.pdf22 Aug 2022
Deviation Report with respect to Allotment letterFile: AL deviation.pdf18 Aug 2022
Copy of the legal title reportFile: 220616_RERA TITLE CERTIFICATE (1)_compressed.pdf17 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: Plinth CC 29722.pdf16 Aug 2022
CERSAI detailsFile: cersai clarification.pdf12 Aug 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Ruparel Panache_compressed (1).pdf12 Aug 2022
Building plan approvalFile: IOA Plans 1.pdf11 Aug 2022
Building plan approvalFile: IOA Plans 2.pdf11 Aug 2022
Building plan approvalFile: IOA Plans 3.pdf11 Aug 2022
Building plan approvalFile: IOA Plans 4.pdf11 Aug 2022
Building plan approvalFile: IOA Plans 5.pdf11 Aug 2022
Building plan approvalFile: IOA Plans 6.pdf11 Aug 2022
Building plan approvalFile: IOA Plans 7.pdf11 Aug 2022
Building plan approvalFile: IOA Plans 8.pdf11 Aug 2022
Building plan approvalFile: IOA Plans 9.pdf11 Aug 2022
Building plan approvalFile: IOA Plans 10.pdf11 Aug 2022
Building plan approvalFile: IOA Plans 11.pdf11 Aug 2022

How this compares with Mumbai Suburban

51%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 12 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Ruparel Panache on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SANTACRUZ (W)6,700+ in Mumbai Suburban

2 kmRuparel PanacheCompleted 124Lapsed / revoked 70Other 138Dot size: filed unitsN

Filed coordinates, straight-line distance. 332 registered projects within 2 km.

Builder: Ruparel Infra & Realty Pvt Ltd

Ruparel Infra & Realty Pvt Ltd has 2 registrations on MahaRERA, including Ruparel Optima Ph I and Ruparel Panache. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Ruparel Panache is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Ruparel Panache?

The registered promoter entity is Ruparel Infra & Realty Pvt Ltd, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Ruparel Panache?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Ruparel Panache?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Ruparel Panache?

The professionals named in the filing: Architect: Rahul Kamathi; Engineer: Ajay Pandurang Gade; Chartered Accountant: Shereena; Chartered Accountant: Sarveshwar Sharma. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Ruparel Panache?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Ruparel Panache. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Ruparel Panache to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.