Home / Browse projects / Pune, Maharashtra / PRITHVI PROXIMUS
PRITHVI PROXIMUS
RG-MH-12961 · RERA P52100021774 · Last updated on MahaRERA portal: 7 Jul 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 15 months past the filed date
- 4 complaints at MahaRERA
- Completion date moved by 12 months
- 1 extension taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRITHVI PROXIMUS is a Residential / Group Housing project by PRITHVI EDIFICE PVT LTD in Pune, Maharashtra, registered with MahaRERA as P52100021774 on 24 Jul 2019. Possession was promised by 30 Jul 2025 and is now 15 months past that date. The completion date has moved by 12 months from the original filing. 214 of the 220 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete. 4 complaints are on record with the regulator.
At a glance
Project
- NamePRITHVI PROXIMUS
- TypeResidential / Group Housing
- Location
- OFF MAGARPATTA ROAD
- Planet IT Campus Opp Magarpatta City Main Gate
- Hadapsar
- Haveli
- Pune
- 411028
- Pincode411028
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100021774
- ReraGenie IDRG-MH-12961
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on24 Jul 2019
- Promised completion30 Jul 2025
- Revised completionRevised to 30 Jul 2025 (originally 31 Jul 2024)
- Buildings1 building record
- Documents filed114 files
Current status
Figures as on 7 Jul 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Building | NA | 23 | 20 | 220 | 0 | 220 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 7 Jul 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Installation of Lifts, at 90%.
Building: 86% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 85% |
| Sanitary Fittings within the flats / premises | 75% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Progress on shared amenities15
As on 7 Jul 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 90% |
| Water Supply | Yes | 85% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 90% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 25% |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | Yes | 75% |
| Open Parking | Yes | 80% |
Parking filed265
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Building | NA | Rs 44.45 cr | Rs 40.50 cr |
| - | NA | Rs 44.45 cr | Rs 40.50 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Axiis Architects |
| Engineer | Mr Sandip N Patil |
| Engineer | Structform Consultant pvt ltd |
| Chartered Accountant | SPAK and Co Chartered accounts Shivraj Patil |
| Chartered Accountant | JAP & Associates |
| Partner | Role in project |
|---|---|
| KELE REALCORP PVT LTD | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAn extension of one year is required under section 6 of the act Form B with the extended date attached herewith
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC12400977 | Sagar Ravindra Tikait | PRITHVI EDIFICE PVT LTD | 02/12/2024 |
| CC12504676 | Anuradha Sudhir Shreshth | PRITHVI EDIFICE PVT LTD | 29/12/2025 |
| CC12600512 | Suryakant Narsing Shelke | PRITHVI EDIFICE PVT LTD | 29/01/2026 |
| CC12601234 | Shriniwwas Bhagwat Kaawtaykwar | KELE REALCORP PVT LTD | 06/03/2026 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 14 Jul 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jun 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 22 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed114
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form1.pdf | 7 Jul 2025 |
| Withdrawal Update Form 1File: Form1.pdf | 7 Jul 2025 |
| Withdrawal Update Form 2File: Form2.pdf | 7 Jul 2025 |
| Withdrawal Update Form 2File: Form2.pdf | 7 Jul 2025 |
| Withdrawal Update Form 3File: Form3.pdf | 7 Jul 2025 |
| Withdrawal Update Form 3File: Form3.pdf | 7 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ProximusArchitect 28052024.pdf | 4 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf | 4 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf | 4 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf | 4 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1.pdf | 4 Apr 2025 |
| Certificates of CA (Form 3)File: Proximus Form 3 28052024.pdf | 4 Apr 2025 |
| Certificates of CA (Form 3)File: Form3.pdf | 4 Apr 2025 |
| Certificates of CA (Form 3)File: Form3.pdf | 4 Apr 2025 |
| Certificates of CA (Form 3)File: Form3.pdf | 4 Apr 2025 |
| Certificates of CA (Form 3)File: Form3_compressed.pdf | 4 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Proximus Form 228052024.pdf | 4 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf | 4 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf | 4 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf | 4 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2.pdf | 4 Apr 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form-5 CA - 2023-2024.pdf | 3 Feb 2025 |
| Other - LegalFile: Certificate of Incorporation Kele Realcorp (NEW).pdf | 27 Jan 2025 |
| Proforma of Agreement for saleFile: Copy - Agreement to Sale Draft - 19 to 21 Floors.pdf | 2 Jul 2024 |
| Building plan approvalFile: Plan - 6 - 18th Floor.pdf | 27 Jun 2024 |
| Building Plan Approval (IOD)File: Plan - 6 - 18th Floor.pdf | 27 Jun 2024 |
| Building plan approvalFile: Plan - 5 - 12th, 14th, 15th, 16th, 17th, 19th, 20th, 21st Floor.pdf | 22 Jun 2024 |
| Building plan approvalFile: Plan - 1 - Site Plan.pdf | 22 Jun 2024 |
| Building plan approvalFile: Plan - 1 - Site Plan.pdf | 22 Jun 2024 |
| Building plan approvalFile: Plan - 9 - Elevation.pdf | 22 Jun 2024 |
| Layout approvalFile: Plan - 11 - Parking.pdf | 22 Jun 2024 |
| Building plan approvalFile: Plan - 8 - Section.pdf | 22 Jun 2024 |
| Building plan approvalFile: Plan - 2 - 1st, 3rd, 5th, 7th, 9th, 11th Floor.pdf | 22 Jun 2024 |
| Building plan approvalFile: Plan - 3 - 2nd, 4th, 6th, 10th Floor.pdf | 22 Jun 2024 |
| Building plan approvalFile: Plan - 4 - 8th Floor.pdf | 22 Jun 2024 |
| Building plan approvalFile: Plan - 10 - Club House.pdf | 22 Jun 2024 |
| Building plan approvalFile: Plan - 7 - 13th Floor.pdf | 22 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: Plan - 11 - Parking.pdf | 22 Jun 2024 |
| Building Plan Approval (IOD)File: Plan - 5 - 12th, 14th, 15th, 16th, 17th, 19th, 20th, 21st Floor.pdf | 22 Jun 2024 |
| Building Plan Approval (IOD)File: Plan - 1 - Site Plan.pdf | 22 Jun 2024 |
| Building Plan Approval (IOD)File: Plan - 1 - Site Plan.pdf | 22 Jun 2024 |
| Building Plan Approval (IOD)File: Plan - 9 - Elevation.pdf | 22 Jun 2024 |
| Building Plan Approval (IOD)File: Plan - 8 - Section.pdf | 22 Jun 2024 |
| Building Plan Approval (IOD)File: Plan - 2 - 1st, 3rd, 5th, 7th, 9th, 11th Floor.pdf | 22 Jun 2024 |
| Building Plan Approval (IOD)File: Plan - 3 - 2nd, 4th, 6th, 10th Floor.pdf | 22 Jun 2024 |
| Building Plan Approval (IOD)File: Plan - 4 - 8th Floor.pdf | 22 Jun 2024 |
| Building Plan Approval (IOD)File: Plan - 10 - Club House.pdf | 22 Jun 2024 |
| Building Plan Approval (IOD)File: Plan - 7 - 13th Floor.pdf | 22 Jun 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 2024.pdf | 22 Jun 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 2A - Jan-2021 to Dec-2021.pdf | 24 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A - Jan-2022 to Dec-2022.pdf | 24 Feb 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 2A - Jan-2023 to Dec-2023.pdf | 24 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form-5 CA - 2019-2020.pdf | 24 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form-5 CA - 2020-2021.pdf | 24 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form-5 CA - 2021-2022.pdf | 24 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form-5 CA - 2022-2023.pdf | 24 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Prithivi Proximus Jan 24.pdf | 12 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Prithivi Proximus Jan 24.pdf | 12 Feb 2024 |
| Certificates of CA (Form 3)File: Form 3 Printhvi Proximus 31 jan 24.pdf | 12 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Data.pdf | 23 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Architect Certificate Nov 2023.pdf | 24 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Engineer Certificate Nov 2023.pdf | 24 Nov 2023 |
| Certificates of CA (Form 3)File: FORM 3 CA Certificate Nov 2023.pdf | 24 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Proximus 8 to12 Floors.pdf | 21 Nov 2023 |
| Declaration about Commencement CertificateFile: Format D second cc.pdf | 21 Nov 2023 |
| Declaration in FORM BFile: FORM-B Affidavit cum Declaration fro extention.pdf | 21 Nov 2023 |
| Building plan approvalFile: Plan No 5 12th 14th 15th 16th 17th Floor Plan.pdf | 9 Nov 2023 |
| Building plan approvalFile: Plan No 6 13th Floor Plan.pdf | 9 Nov 2023 |
| Building Plan Approval (IOD)File: Plan No 5 12th 14th 15th 16th 17th Floor Plan.pdf | 9 Nov 2023 |
| Building Plan Approval (IOD)File: Plan No 6 13th Floor Plan.pdf | 9 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - Architect Certificate.pdf | 20 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form no 2A Proximus.pdf | 18 Jan 2020 |
| Details of encumbrancesFile: PP UPLOAD.pdf | 23 Jul 2019 |
| Proforma of Allotment letterFile: FINAL AGREEMENT FOR SALE OF FLAT-FORMAT-3-07-2019.pdf | 18 Jul 2019 |
| Proforma of Allotment letterFile: Allotement Letter.pdf | 18 Jul 2019 |
| Certificates of CA (Form 3)File: Final CA Certificate.pdf | 17 Jul 2019 |
| PAN CardFile: download pan.pdf | 16 Jul 2019 |
| Declaration in FORM BFile: SELF DECLARATION 1MB.pdf | 16 Jul 2019 |
| Building plan approvalFile: 1 Layout Plan.pdf | 14 Jul 2019 |
| Building plan approvalFile: 2 Building Plan 1st 2nd 3rd 5th 7th 9th 11th Floor.pdf | 14 Jul 2019 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| PRITHVI PRESIDIO A Building | Magarpatta Road | 77 | Completed | Jun 2016 | Late, Apr 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 114 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep PRITHVI PROXIMUS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Planet IT Campus Opp Magarpatta City Main Gate13,700+ in Pune
Filed coordinates, straight-line distance. 268 registered projects within 2 km.
Amanora Arbano Towers 73,74,75 and 76
City Corporation Limited
Astrana
Dilip Baburao Tupe
Leisure Town Phase 1
Sai Proviso Homes
ARV Newtown Phase III
Vedant Infracon
Kumar Parc Residences - A2
Kumar Properties Infratech Developers Pvt
Kumar Parc residences - A1
Kumar Properties Infratech Developers Pvt
Builder: PRITHVI EDIFICE PVT LTD
PRITHVI EDIFICE PVT LTD has 4 registrations on MahaRERA, including Prithvi Presidio, Buiding B, Phase-1 and PRITHVI PROXIMUS. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What does it mean that PRITHVI PROXIMUS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if PRITHVI PROXIMUS is delayed beyond 30 Jul 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRITHVI PROXIMUS?
The registered promoter entity is PRITHVI EDIFICE PVT LTD, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRITHVI PROXIMUS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PRITHVI PROXIMUS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PRITHVI PROXIMUS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRITHVI PROXIMUS?
The professionals named in the filing: Architect: Axiis Architects; Engineer: Mr Sandip N Patil; Engineer: Structform Consultant pvt ltd; Chartered Accountant: SPAK and Co Chartered accounts Shivraj Patil; Chartered Accountant: JAP & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRITHVI PROXIMUS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback