PRISTINE O2 WORLD PART 2
RG-MH-07400 · RERA P52100066545 · Last updated on MahaRERA portal: 6 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 3 other registrations and every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRISTINE O2 WORLD PART 2 is a Residential / Group Housing project by LOGIPARK WAREHOUSING LLP in Pune, Maharashtra, registered with MahaRERA as P52100066545 on 11 Jun 2024. Possession is promised by 31 Dec 2028. 343 of the 408 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.
At a glance
Project
- NamePRISTINE O2 WORLD PART 2
- TypeResidential / Group Housing
- Location
- CHOKHI DHANI ROAD
- WAGHOLI
- Haveli
- Pune
- 412207
- Pincode412207
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100066545
- ReraGenie IDRG-MH-07400
Builder
- NameLOGIPARK WAREHOUSING LLP
- Entity typePartnership
- GSTIN27AAFFL8246E1Z8
- PartnersSACHIN ISHWARCHAND GOYAL, NUMAN SACHIN GOYAL
- Other registrations3 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on11 Jun 2024
- Promised completion31 Dec 2028
- Revised completionNone
- Buildings2 building records
- Documents filed102 files
Current status
Figures as on 6 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| TOWER T6 | NA | 29 | 26 | 204 | 0 | 204 |
| TOWER T5 | NA | 28 | 26 | 204 | 0 | 204 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 6 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 46%.
TOWER T650%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 38% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 7% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
TOWER T551%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 46% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 14% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 6 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed397
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| TOWER T6 | 158 | 181 | 339 |
| TOWER T5 | 19 | 39 | 58 |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| TOWER T6 | NA | Rs 80.73 cr | Rs 28.84 cr |
| TOWER T5 | NA | Rs 80.73 cr | Rs 28.84 cr |
| - | NA | Rs 30.51 cr | Rs 5.07 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Adva Studio Pvt Ltd |
| Engineer | Praful Jagtap |
| Engineer | Sumit Pardeshi |
| Chartered Accountant | RSMS & Associates |
| Partner | Role in project |
|---|---|
| LOGIPARK WAREHOUSING LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 May 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 25 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 25 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2028
Documents filed102
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 102 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: 260630 Architects Certificate O2 Part 2.pdf | 6 Jul 2026 |
| Withdrawal Update Form 2File: 260630 Engineers Certificate O2 Part 2.pdf | 6 Jul 2026 |
| Withdrawal Update Form 3File: 260630 - CA Certificate O2 PART 2.pdf | 6 Jul 2026 |
| Withdrawal Update Form 1File: Form 1 - O2 Part 2 as on Mar 26.pdf | 16 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 - O2 Part 2 as on Mar 26.pdf | 16 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 as on Mar 26.pdf | 16 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 - Pristine 02 world Part 2 as on Dec 2025.pdf | 31 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 - Pristine 02 world Part 2 as on Dec 2025.pdf | 31 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 - Pristine 02 world Part 2 as on Dec 2025.pdf | 31 Jan 2026 |
| Form 1File: Form 1 - PRISTINE O2 WORLD PART 2 as on Sep 2025.pdf | 10 Oct 2025 |
| Form 2File: Form 2 - PRISTINE O2 WORLD PART 2 as on Sep 2025.pdf | 10 Oct 2025 |
| Form 3File: Form 3 - PRISTINE O2 WORLD PART 2 as on Sep 2025.pdf | 10 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Prisitne O2 World Part 2 as on Sep 2025.pdf | 10 Oct 2025 |
| Form 5 (FY 2024-2025)File: Form 5 - Pristine O2 World Part 2 FY 2024-25.pdf | 26 Sep 2025 |
| Form 2A (FY 2024-2025)File: Form 2A - Pristine O2 World Part 2 FY 2024-25.pdf | 24 Sep 2025 |
| Form 1File: Form 1 - Pristine O2 World Part 2 as on June 2025.pdf | 22 Sep 2025 |
| Form 2File: Form 2 - Pristine O2 World Part 2 as on June 2025.pdf | 22 Sep 2025 |
| Form 3File: Form 3 - Pristine O2 World Part 2 as on June 2025.pdf | 22 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: Circular 29 - Pristine O2 World Part 2 as on June 2025.pdf | 22 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 241219 Architects Certificate Part 2.pdf | 30 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 241221 RERA FORM 3 Part 2_compressed.pdf | 30 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 241219 Engineers Certificate Part 2.pdf | 30 Jan 2025 |
| Layout approvalFile: 1-35.pdf | 25 Dec 2024 |
| Building plan approvalFile: 11-35.pdf | 25 Dec 2024 |
| Building plan approvalFile: 12-35.pdf | 25 Dec 2024 |
| Building plan approvalFile: 13-35.pdf | 25 Dec 2024 |
| Building plan approvalFile: 14-35.pdf | 25 Dec 2024 |
| Building plan approvalFile: 15-35.pdf | 25 Dec 2024 |
| Building plan approvalFile: 16-35.pdf | 25 Dec 2024 |
| Building plan approvalFile: 17-35.pdf | 25 Dec 2024 |
| Building plan approvalFile: 18-35.pdf | 25 Dec 2024 |
| Building plan approvalFile: 19-35.pdf | 25 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: 1-35.pdf | 25 Dec 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 0 - CC 241224.pdf | 25 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 12-35.pdf | 25 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 19-35.pdf | 25 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 18-35.pdf | 25 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 17-35.pdf | 25 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 16-35.pdf | 25 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 15-35.pdf | 25 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 14-35.pdf | 25 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 13-35.pdf | 25 Dec 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: 11-35.pdf | 25 Dec 2024 |
| Proforma of Agreement for saleFile: PRISTINE O2 WORLD PART-2 Final Revised 25-12-2024 DRAFT.pdf | 25 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 240930 Architects Certificate Part 2.pdf | 25 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Part 2 (2).pdf | 25 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 240930 Engineers Certificate Part 2.pdf | 25 Oct 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Verification.pdf | 4 Jun 2024 |
| Other - LegalFile: Logipark Warehousing LLP-Supplementary Partnership deed.pdf | 4 Jun 2024 |
| Other - TechnicalFile: Order 50.pdf | 4 Jun 2024 |
| Details of encumbrances concerned to FinanceFile: No Encum- Legal.pdf | 3 Jun 2024 |
| Details of encumbrances concerned to LegalFile: No Encum- Legal.pdf | 3 Jun 2024 |
| Other - LegalFile: LOGIPARK - SALE DEED-4392-2004.pdf | 3 Jun 2024 |
| Other - LegalFile: Latest 7-12.pdf | 3 Jun 2024 |
| Building plan approvalFile: HPSC0137_compressed_rotated.pdf | 30 May 2024 |
| Building plan approvalFile: HPSC0138_compressed.pdf | 30 May 2024 |
| Building plan approvalFile: HPSC0140_compressed.pdf | 30 May 2024 |
| Building plan approvalFile: HPSC0139_compressed.pdf | 30 May 2024 |
| Building plan approvalFile: HPSC0144_compressed.pdf | 30 May 2024 |
| Building plan approvalFile: HPSC0145_compressed.pdf | 30 May 2024 |
| Building plan approvalFile: HPSC0146_compressed.pdf | 30 May 2024 |
| Building plan approvalFile: HPSC0147_compressed.pdf | 30 May 2024 |
| Building plan approvalFile: HPSC0148_compressed.pdf | 30 May 2024 |
| Building plan approvalFile: HPSC0149_compressed.pdf | 30 May 2024 |
| Building plan approvalFile: HPSC0152_compressed.pdf | 30 May 2024 |
| Building plan approvalFile: HPSC0153_compressed.pdf | 30 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0137_compressed_rotated.pdf | 30 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0138_compressed.pdf | 30 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0140_compressed.pdf | 30 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0139_compressed.pdf | 30 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0144_compressed.pdf | 30 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0145_compressed.pdf | 30 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0146_compressed.pdf | 30 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0147_compressed.pdf | 30 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0148_compressed.pdf | 30 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0149_compressed.pdf | 30 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0152_compressed.pdf | 30 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: HPSC0153_compressed.pdf | 30 May 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 240530.pdf | 30 May 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 30 May 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 3 other registrations and every project registered within 2 km, which the RERA portal never shows together
- All 102 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PRISTINE O2 WORLD PART 2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near WAGHOLI13,700+ in Pune
Filed coordinates, straight-line distance. 64 registered projects within 2 km.
Yashwin Enchante Phase 2
Vilas Javdekar Infinitee Developers Pvt. L
Godrej Greens
DREAM WORLD LANDMARKS LLP
Yashwin Enchante Phase 1
Vilas Javdekar Infinitee Developers Pvt. L
Kohinoor Kaleido
Intofinity Promoters Private Limited
VIJAY VIHAR
COL. RPS RAWAT
FLAMANTE BY VTP LUXE PHASE 1
INTEGRATED BUSINESS ECOSYSTEM PRIVATE LIMI
Builder: LOGIPARK WAREHOUSING LLP
LOGIPARK WAREHOUSING LLP has 4 registrations on MahaRERA, including PRISTINE O2 WORLD PART 1 and PRISTINE O2 WORLD PART 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if PRISTINE O2 WORLD PART 2 is delayed beyond 31 Dec 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRISTINE O2 WORLD PART 2?
The registered promoter entity is LOGIPARK WAREHOUSING LLP, a partnership as per the filing. Its GSTIN 27AAFFL8246E1Z8 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRISTINE O2 WORLD PART 2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PRISTINE O2 WORLD PART 2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRISTINE O2 WORLD PART 2?
The professionals named in the filing: Architect: Adva Studio Pvt Ltd; Engineer: Praful Jagtap; Engineer: Sumit Pardeshi; Chartered Accountant: RSMS & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRISTINE O2 WORLD PART 2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback