ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / Pristine

Completed No litigation declared Residential / Group Housing project

Pristine

By Wadhwa Group Holdings Private Limited

RG-MH-81837 · RERA P51900017186 · Last updated on MahaRERA portal: 11 May 2023

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Dec 2024Possession promisedregistration recorded completed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 72%
0Complaints at MahaRERAon this registration
Jump to the 49 documents Report an error

Pristine is a Residential / Group Housing project by Wadhwa Group Holdings Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900017186 on 17 Jul 2018. The registration is recorded completed; possession was promised by 30 Dec 2024.

At a glance

Project

  • NamePristine
  • TypeResidential / Group Housing
  • Location
    • Bal Govinddas Marg
    • Matunga West
    • GNorth-400028
    • Ward GNorth
    • Mumbai City
    • 400028
  • Pincode400028
  • RERA no.P51900017186
  • ReraGenie IDRG-MH-81837

Builder

  • NameWadhwa Group Holdings Private Limited
  • Entity typeCompany
  • DirectorsNavin Amarlal Makhija, Manohar Chhabria
  • Other registrations1 more →
  • Completed2 of 2
  • Declared earlier projects1 →

Key dates

this monthRegisteredJul 2018PromisedDec 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on17 Jul 2018
  • Promised completion30 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed49 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PristineNA410000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 72%.

Pristine: 43% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure72%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises5%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities17

As on 11 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable
Society OfficeYes100%
Fitness CentreYes100%

Parking filed152

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots152
Closed/Covered152

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area354 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Bhagyalaxmi Narayan Chauhan-Mumbai City
Yashraj Narayan Chauhan-Mumbai City
Narayan Gopalji Chauhan-Mumbai City

Approvals and building plan

Permissible FSI8862.02
Proposed, not sanctioned612 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchMatunga West

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMs A Plus Architects & Planners
EngineerS R Estimation
Chartered AccountantGmj & Co.
PartnerRole in project
Wadhwa Group Holdings Private Limited-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jun 2018
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jun 2018
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Jun 2018
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 18 Mar 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 11 May 2023

Documents filed49

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of CA (Form 3)File: Form-3 Pristine Dec-21 Signed_compressed.pdf11 May 2023
Certificates of CA (Form 3)File: Form-3 Signed Pristine Mar-22.pdf11 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Signed Pristine FY 2021-22.pdf11 May 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Pristine OC.pdf11 May 2023
Architect’s Certificate on Completion of Project (Form 4)File: Pristine Form-4 Completion Certificate.pdf11 May 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: Status of Formation of Legal Entity.pdf11 May 2023
Foreclosure of the ProjectFile: RERA Letter for Pristine.pdf18 Feb 2023
Other - LegalFile: RERA Letter for Pristine.pdf18 Feb 2023
Certificates of CA (Form 3)File: Form-3 Jun-21-Pristine compressed.pdf18 Jan 2022
Certificates of CA (Form 3)File: Form-3 Sep-21 Wadhwa Pristine_compressed.pdf18 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March 21_Arch certificate_Pristine.pdf19 Jun 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Pristine_March-2021_stamp.pdf13 May 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Letter for Quality - Form 2A Pristine March- 2021.pdf13 May 2021
Certificates of CA (Form 3)File: Wadhwa Pristine Sept2020_compressed.pdf19 Mar 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Pristine_Form 5.pdf11 Mar 2021
Certificates of CA (Form 3)File: March2020-Wadhwa Pristine.pdf3 Feb 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer_Pristine_Sept-2020.pdf4 Dec 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Pristine - 25112020.pdf26 Nov 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: March-2020-Form 1-Pristine_compressed.pdf12 Aug 2020
Details of Restarting of Construction work post lockdownFile: Post Covd- Pristine.pdf20 Jul 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_ Pristine-31-03-20.pdf14 Jul 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: sign Letter for Wadhwa Pristine - Quality - Form - 2A March-2020.pdf9 Jul 2020
Commencement Certificates / NA Order for plotted developmentFile: CC 34 Floors 17032020 Pristine.pdf18 Mar 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate_ Pristine-31-12-19.pdf27 Jan 2020
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Letter for Wadhwa Pristine Dec 2019.pdf27 Jan 2020
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect-Signed-Sept19.pdf24 Jan 2020
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers _ Pristine-Sept-2019.pdf24 Jan 2020
Certificates of CA (Form 3)File: CA-June19 - Wadhwa Pristine.pdf24 Jan 2020
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form5-18-19.pdf24 Jan 2020
Commencement Certificates / NA Order for plotted developmentFile: CC pristine.pdf20 Nov 2018
Declaration in FORM BFile: Affidavit-Co-Promoter-ilovepdf-compressed.pdf9 Jul 2018
Declaration in FORM BFile: Affidavit-Promoter.pdf6 Jul 2018
Building plan approvalFile: 180314_IOD_Pristine.pdf29 Jun 2018
Layout approvalFile: 180314_IOD_Pristine_Drawing 1.pdf29 Jun 2018
Layout approvalFile: 180314_IOD_Pristine_Drawing 2.pdf29 Jun 2018
Layout approvalFile: 180314_IOD_Pristine_Drawing 3.pdf29 Jun 2018
Layout approvalFile: 180314_IOD_Pristine_Drawing 4.pdf29 Jun 2018
PAN CardFile: PAN_CARD_WADHWAGROUP HOLDINGS PVT LTD.pdf29 Jun 2018
Copy of the legal title reportFile: 180629_Title Certificate_Pristine.pdf29 Jun 2018
Details of encumbrancesFile: NoEncumbrances.pdf29 Jun 2018
Copy of Layout Approval (in case of layout)File: 180314_IOD_Pristine_Drawing 1.pdf29 Jun 2018
Copy of Layout Approval (in case of layout)File: 180314_IOD_Pristine_Drawing 2.pdf29 Jun 2018
Copy of Layout Approval (in case of layout)File: 180314_IOD_Pristine_Drawing 3.pdf29 Jun 2018
Copy of Layout Approval (in case of layout)File: 180314_IOD_Pristine_Drawing 4.pdf29 Jun 2018
Building Plan Approval (IOD)File: 180314_IOD_Pristine.pdf29 Jun 2018
Commencement Certificates / NA Order for plotted developmentFile: 180314_IOD_Pristine.pdf29 Jun 2018
Proforma of Allotment letterFile: NoAgreement.pdf29 Jun 2018
Certificates of CA (Form 3)File: Signed CA Cert_Pristine_28-02-2018_NCF.pdf26 Apr 2018
Certificates of CA (Form 3)File: Signed CA Cert_Pristine_28-02-2018_TWG.pdf26 Apr 2018

How this compares with Mumbai City

33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is completed

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pristine on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Matunga West780+ in Mumbai City

Builder: Wadhwa Group Holdings Private Limited

Wadhwa Group Holdings Private Limited has 2 registrations on MahaRERA, including Pristine and Wadhwa Pristine. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Pristine is delayed beyond 30 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pristine?

The registered promoter entity is Wadhwa Group Holdings Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pristine?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Pristine?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pristine?

The professionals named in the filing: Architect: Ms A Plus Architects & Planners; Engineer: S R Estimation; Chartered Accountant: Gmj & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pristine?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pristine. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pristine to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.