PRISTINE CITY PLOTS

By PRISTINE DEVELOPERS

RG-MH-58233 · RERA P52100055128 · Last updated on MahaRERA portal: 7 May 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 18 months past the filed date

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2025Possession promised18 months past this date
203 of 203Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

PRISTINE CITY PLOTS is a Plotted project by PRISTINE DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100055128 on 4 Mar 2024. Possession was promised by 1 Apr 2025 and is now 18 months past that date. 0 of the 203 units on this registration are recorded sold or booked.

At a glance

Project

  • NamePRISTINE CITY PLOTS
  • TypePlotted
  • Location
    • Bakori
    • Wagholi Road
    • Haveli
    • Pune
    • 412207
  • Pincode412207
  • RERA no.P52100055128
  • ReraGenie IDRG-MH-58233

Builder

  • NamePRISTINE DEVELOPERS
  • Entity typePartnership
  • PartnersSACHIN ISHWARCHAND GOYAL, NUMAN SACHIN GOYAL
  • Other registrations3 more →
  • Completed3 of 4
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects4 →

Key dates

18 months past promisethis monthRegisteredMar 2024PromisedApr 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on4 Mar 2024
  • Promised completion1 Apr 2025
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed69 files

Current status

0%0 of 203 units booked

Figures as on 7 May 2025, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 7 May 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 7 May 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area25,835 sq m
Land owned byThe promoter
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBhandarkar road, opp Gowilkar Lab, Shivaji Nagar, Pune

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
PRISTINE DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 May 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Feb 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Feb 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 2 Apr 2025

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pristine City Plots as on March 2025.pdf7 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 20250328193506.pdf2 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pristine City Plots - 31-12-2024.pdf25 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pristine City Plots - 31-12-2024.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pristine City Plots as on 31-12-2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pristine City Plots - 31st March 2024.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pristine City Plots - 30th June 2024.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pristine City Plots - 30th September 2024.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pristine City Plots as on March 2024.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pristine City Plots as on June 2024.pdf27 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pristine City Plots as on September 2024.pdf27 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Pristine City Plots as on 31-03-2024.pdf27 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: Disclosure-Project Loan 13082024.pdf13 Aug 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format-A Declaration-RERA Bank Ac 13082024.pdf13 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 Engineer’s Certificate on Cost Incurred on Project (Form 2) (2).pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ggggggggggggggg.pdf20 Jul 2024
Details of encumbrances concerned to FinanceFile: Financial Encumbrances 26062024.pdf6 Jul 2024
Details of encumbrances concerned to LegalFile: Financial Encumbrances 26062024.pdf6 Jul 2024
Declaration in FORM BFile: Form-B Affidavit 26062024.pdf6 Jul 2024
Declaration in FORM BFile: Declaration Form-B 26062024.pdf6 Jul 2024
CERSAI detailsFile: CERSAI Undertaking 26062024.pdf6 Jul 2024
CERSAI detailsFile: CERSAI Search Report (Mortgage) 26062024.pdf6 Jul 2024
Copy of the legal title reportFile: Legal Title Report 14022024.pdf31 May 2024
Proforma of Agreement for saleFile: Agreement To Sell (Mortgage clause).pdf31 May 2024
Details of encumbrances concerned to FinanceFile: Pristine Developers Mortgage Deed.pdf23 May 2024
Details of encumbrances concerned to LegalFile: Pristine Developers Mortgage Deed.pdf23 May 2024
Proforma of Agreement for saleFile: Agreement For Sale-Draft 09032024.pdf16 Mar 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report-Agreement for Sale 09032024.pdf16 Mar 2024
Other - TechnicalFile: ilovepdf_merged (72).pdf22 Feb 2024
Copy of the legal title reportFile: Legal Title Report 14022024.pdf16 Feb 2024
CERSAI detailsFile: CERSAI Search Report 16022024.pdf16 Feb 2024
Other - LegalFile: Annexure A Declaration-Cum-Undertaking 16022024.pdf16 Feb 2024
Other - LegalFile: CC Authentication Mail 19012024.pdf16 Feb 2024
Other - TechnicalFile: 20240222194415.pdf16 Feb 2024
Other - TechnicalFile: CC Authentication Mail 19012024.pdf16 Feb 2024
PAN CardFile: PAN Pristine Developer.pdf15 Feb 2024
Proforma of Agreement for saleFile: Agreement For Sale-Draft.pdf15 Feb 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report-Agreement for Sale 14022024.pdf15 Feb 2024
Other - LegalFile: Partnership Deed.pdf15 Feb 2024
Details of encumbrances concerned to FinanceFile: No Encrumbrance Finance 08022024.pdf9 Feb 2024
Details of encumbrances concerned to LegalFile: No Encrumbrance Finance 08022024.pdf9 Feb 2024
Other - LegalFile: Sale Deed 11951-2011 v-1-15.pdf3 Feb 2024
Other - LegalFile: Sale Deed 11951-2011 v-16-30.pdf3 Feb 2024
Other - LegalFile: Sale Deed 11951-2011 v-31-41.pdf3 Feb 2024
Layout approvalFile: 2 Copy of Layout Approval (in case of layout) (4).pdf2 Feb 2024
Layout approvalFile: 3 Copy of Layout Approval (in case of layout) (3).pdf2 Feb 2024
Layout approvalFile: scan0203_compressed (1).pdf2 Feb 2024
Building plan approval or NA orderFile: NA Order 29012015.pdf2 Feb 2024
Details of encumbrances concerned to FinanceFile: No Encrumbrances Legal 20112023.pdf2 Feb 2024
Details of encumbrances concerned to FinanceFile: No Encumbrance Other.pdf2 Feb 2024
Details of encumbrances concerned to LegalFile: No Encrumbrances Legal 20112023.pdf2 Feb 2024
Details of encumbrances concerned to LegalFile: No Encumbrance Other.pdf2 Feb 2024
Copy of Layout Approval (in case of layout)File: scan0203_compressed (1).pdf2 Feb 2024
Copy of Layout Approval (in case of layout)File: 2 Copy of Layout Approval (in case of layout) (4).pdf2 Feb 2024
Copy of Layout Approval (in case of layout)File: 3 Copy of Layout Approval (in case of layout) (3).pdf2 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: NA Order 29012015.pdf2 Feb 2024
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate 04102023.pdf2 Feb 2024
Declaration about Commencement CertificateFile: Declaration Certificate.pdf2 Feb 2024
Declaration in FORM BFile: Form-B Affidavit 21122023.pdf2 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Architect Certificate 19122023.pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Engineers Certificate 07112023 revised.pdf2 Feb 2024
CERSAI detailsFile: CERSAI Undertaking.pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3 CA Certificate 15012024.pdf2 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Numan Goyal 21122023.pdf2 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest Sachin Goyal 21122023.pdf2 Feb 2024
Proforma of Allotment letterFile: Proforma Allotment Letter.pdf2 Feb 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration abt Separate Bank Ac 21222023.pdf2 Feb 2024
Deviation Report with respect to Allotment letterFile: Deviation Report Allotment Letter 15012024.pdf2 Feb 2024

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
NEO CITY PART 2Gat No 735 734 739 NEO City Behind Jain College Near JSPM and Lexicon International School Bakori Road Wagholi 412207150CompletedAug 2019Late, Dec 2020
NEO CITY PART 1Gat No 735 734 739 NEO City Behind Jain College Near JSPM and Lexicon International School Bakori Road Wagholi832CompletedJul 2017Jul 2017

How this compares with Pune

0%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRISTINE CITY PLOTS on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Wagholi Road13,700+ in Pune

Builder: PRISTINE DEVELOPERS

PRISTINE DEVELOPERS has 4 registrations on MahaRERA, including PRISTINE CITY BEF and Pristine Prolife III. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 4 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that PRISTINE CITY PLOTS shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if PRISTINE CITY PLOTS is delayed beyond 1 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRISTINE CITY PLOTS?

The registered promoter entity is PRISTINE DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRISTINE CITY PLOTS?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRISTINE CITY PLOTS?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in PRISTINE CITY PLOTS?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRISTINE CITY PLOTS. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRISTINE CITY PLOTS to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.