Prime Platinum

By PRIME INFRA

RG-MH-42177 · RERA P51500023223 · Last updated on MahaRERA portal: 20 Mar 2026

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 5 months past the filed date
  • Completion date moved by 18 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
May 2026Possession promised5 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 70%
57 of 68Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 99 documents Report an error

Prime Platinum is a Others project by PRIME INFRA in Aurangabad, Maharashtra, registered with MahaRERA as P51500023223 on 6 Dec 2019. Possession was promised by 29 May 2026 and is now 5 months past that date. The completion date has moved by 18 months from the original filing. 11 of the 68 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NamePrime Platinum
  • TypeOthers
  • Location
    • Balapur
    • Aurangabad
    • 431002
  • Pincode431002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500023223
  • ReraGenie IDRG-MH-42177

Builder

  • NamePRIME INFRA
  • Entity typePartnership
  • PartnersSANJAY RAMESHWAR DARAK, GOKULDAS RIKHADAS MANDLECHA, SARITA GOKULDAS MANDLECHA
  • Other registrations2 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

5 months past promisethis monthRegisteredDec 2019First promiseNov 2024Revised toMay 2026

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on6 Dec 2019
  • Promised completion29 May 2026
  • Revised completionRevised to 29 May 2026 (originally 29 Nov 2024)
  • Buildings1 building record
  • Documents filed99 files

Current status

16%11 of 68 units booked

Figures as on 20 Mar 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRIME PLATINUMNA77204868

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Mar 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 70%.

PRIME PLATINUM: 76% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises70%
Sanitary Fittings within the flats / premises70%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.55%

Progress on shared amenities15

As on 20 Mar 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes20%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes30%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes20%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed18

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots18
Closed/Covered18

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,534 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Prime InfraAurangabad (M Corp.)Aurangabad
Vijaya Shivajirao TidkeAurangabad (M Corp.)Aurangabad
Vidya Vinaychandra BadeAurangabad (M Corp.)Aurangabad

Approvals and building plan

Sanctioning authorityCIty and Industrial Development Corparation of Maharashtra Limited
Permissible FSI3546.46
Proposed, not sanctioned3,546 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBeed ByPass Road

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMANGGAL ARCHITECTS AND INTERIOR DESIGNERS
EngineerCore Consultant
Chartered AccountantYash Nagar
PartnerRole in project
PRIME INFRA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500025127Nov 2024 → May 2026

Reason as filed by the promoterIn response to your query, we would like to clarify that we are requesting an extension from MahaRERA for only completion of 10% of the pending work for the project. As, the pending work, which includes only the finishing touches and the application for the Occupancy Certificate, will be completed within 1 year. The additional time is requested as a precautionary measure to account for any unforeseen circumstances that may arise during the final stages of the project. We assure you that the project will be completed and ready for possession well within the extension period. Also kindly note th

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 16 Nov 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 16 Nov 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Nov 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 16 Nov 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed99

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 99 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 2025-26 Q1.pdf20 Mar 2026
Form 2File: Form 2 2025-26 Q1.pdf20 Mar 2026
Form 3File: Form 3 2025-26 Q1.pdf20 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold 2025-26 Q1.pdf20 Mar 2026
Form 1File: Form 1 2025-26 Q2.pdf20 Mar 2026
Form 2File: Form 2 2025-26 Q2.pdf20 Mar 2026
Form 3File: Form 3 2025-26 Q2.pdf20 Mar 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold 2025-26 Q2.pdf20 Mar 2026
Declaration in FORM BFile: PI-Affidavit For RERA Extention - highlighted.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PI Architect Certificate Revised.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: schedule of Work and reasons.pdf10 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: schedule of Work and reasons.pdf7 Jul 2025
Declaration in FORM BFile: PI-Affidavit For RERA Extention.pdf30 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PI Architect Certificate.pdf30 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: PI CA certificate.pdf30 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PI Engg Certificate.pdf30 Jun 2025
Disclosure of sold/ booked inventoryFile: PI Sold Unsold.pdf30 Jun 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: PI form 2A.pdf30 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31_12_24.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31_12_24.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Dec 24 PI.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 24-25 Q3.pdf30 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: RERA Form 5_Prime Infra_attested.pdf24 Jan 2025
Declaration in FORM BFile: PI-Affidavit For RERA Extention.pdf27 Dec 2024
Declaration in FORM BFile: PI Form B.pdf21 Nov 2024
Declaration in FORM BFile: PI Form B.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q1.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q2.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024-25 Q1.pdf13 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 2024-25 Q2.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q1.pdf13 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q2.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q1.pdf13 Nov 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold 2024-25 Q2.pdf13 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate PI March 2024.pdf2 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg Certificate PI March 2024.pdf2 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance PI March 24 .pdf2 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold PI March 24 .pdf2 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Ca Certificate PI March 24 .pdf2 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual Report Statement of Account's .pdf23 May 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22-23.pdf16 Mar 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf12 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf12 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf12 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Prime infra Dec 23.pdf8 Mar 2024
Disclosure of sold/ booked inventoryFile: Sold unsold Details Dec 23.pdf8 Mar 2024
Disclosure of sold/ booked inventoryFile: 30032023 SOLD UNSOLD.pdf31 Jul 2023
Disclosure of sold/ booked inventoryFile: 30062023 SOLD UNSOLD.pdf31 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold 31032023.pdf25 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold 30062023.pdf25 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 19-20.pdf4 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 20-21.pdf4 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 21-22.pdf4 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 31-12-2022.pdf4 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 19-20.pdf4 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 20-21.pdf4 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 21-22.pdf4 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 31-12-2022.pdf4 Mar 2023
Disclosure of sold/ booked inventoryFile: Units sold (1).pdf4 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5Prime Infra 21-22.pdf22 Feb 2023
Details of encumbrances concerned to FinanceFile: Legal.pdf21 Feb 2023
Details of encumbrances concerned to LegalFile: Legal.pdf21 Feb 2023
Declaration about Commencement CertificateFile: Commencement Cert Declaration.pdf21 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: 19-20.pdf21 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: 20-21.pdf21 Feb 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 21-22.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized.pdf21 Feb 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: organized.pdf21 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Interest.pdf21 Feb 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: rera.PDF21 Feb 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf21 Feb 2023
Deviation Report with respect to Allotment letterFile: Allottment Letter.pdf21 Feb 2023
Deviation Report with respect to model copy of AgreementFile: Agreement.pdf21 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Prime Infra 19-20.pdf18 Feb 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Prime Infra 20-21.pdf18 Feb 2023
Disclosure of sold/ booked inventoryFile: prime inventory march 2022.pdf28 Apr 2022
Details of encumbrancesFile: Revised Encumbrances Cert.pdf30 Dec 2021
Declaration in FORM BFile: Revised Form B_compressed.pdf30 Dec 2021
Declaration in FORM BFile: Developer.pdf5 Dec 2019

How this compares with Aurangabad

16%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 18 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is among them

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep Prime Platinum on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Balapur1,400+ in Aurangabad

2 kmPrime PlatinumCompleted 2Lapsed / revoked 3Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 19 registered projects within 2 km.

Builder: PRIME INFRA

PRIME INFRA has 3 registrations on MahaRERA, including Prime Platinum and GODAVARI PARK. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What does it mean that Prime Platinum shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if Prime Platinum is delayed beyond 29 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prime Platinum?

The registered promoter entity is PRIME INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prime Platinum?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Prime Platinum?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prime Platinum?

The professionals named in the filing: Architect: MANGGAL ARCHITECTS AND INTERIOR DESIGNERS; Engineer: Core Consultant; Chartered Accountant: Yash Nagar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prime Platinum?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prime Platinum. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prime Platinum to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.