ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / PRIMAL SAUNDARYAM

Registered No litigation declared Residential / Group Housing project

PRIMAL SAUNDARYAM

By PRIMAL SAUNDARYAM

RG-MH-30902 · RERA P52100079240 · Last updated on MahaRERA portal: 17 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 20%
78 of 88Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 71 documents Report an error

PRIMAL SAUNDARYAM is a Residential / Group Housing project by PRIMAL SAUNDARYAM in Pune, Maharashtra, registered with MahaRERA as P52100079240 on 18 Feb 2025. Possession is promised by 31 Dec 2030. 10 of the 88 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NamePRIMAL SAUNDARYAM
  • TypeResidential / Group Housing
  • Location
    • GAT NO 127(P) AND 128(P)
    • CHIKHALI
    • Haveli
    • Pune
    • 411062
  • Pincode411062
  • RERA no.P52100079240
  • ReraGenie IDRG-MH-30902

Builder

  • NamePRIMAL SAUNDARYAM
  • Entity typePartnership

Key dates

this monthRegisteredFeb 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Feb 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed71 files

Current status

11%10 of 88 units booked
120.3%Work done, per cost certificate

Figures as on 17 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRIMAL SAUNDARYAMNA171488088

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 20%.

PRIMAL SAUNDARYAM: 38% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure20%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 17 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed149

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots149
Closed/Covered149

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,000 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on6 Aug 2025

Approvals and building plan

Sanctioning authoritypimpri chinchwad municipal corporation
Permissible FSI8395.52
Proposed, not sanctioned8,396 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchOMKAR PLAZA GRND FLR PLOT NO GP 77 G BLOCK MIDC NR THERMAX CHOWK PIMPRI CHINCHWAD PUNE 411019
Estimated costRs 10.24 cr
Cost incurredRs 12.32 cr
Work done120.33%
BuildingWingEstimatedIncurred
PRIMAL SAUNDARYAMNARs 10.06 crRs 12.10 cr
-NARs 18.02 lakhRs 21.69 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectIP ASSOCIATES
EngineerCHETAN PATIL
EngineerYOGESHWARI CHANDRAKANT PATIL
Chartered AccountantPatni & Patni
Chartered AccountantNavdeep Jindal
Chartered AccountantDolly Gandhi
PartnerRole in project
PRIMAL SAUNDARYAM-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 30 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 18 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 18 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed71

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf17 Jun 2026
Withdrawal Update Form 2File: Form -2.pdf17 Jun 2026
Withdrawal Update Form 3File: Form 3 Signed.pdf17 Jun 2026
Building plan approvalFile: 2-8.pdf18 Feb 2026
Layout approvalFile: 1 Layout.pdf18 Feb 2026
Form 5 (FY 2024-2025)File: Form 5 2024-25.pdf16 Feb 2026
Form 2A (FY 2024-2025)File: Form 2A.pdf14 Feb 2026
Withdrawal Update Form 1File: Form 1 Sign.pdf9 Feb 2026
Withdrawal Update Form 1File: Form 1 sign.pdf9 Feb 2026
Withdrawal Update Form 2File: Form 2 Sign.pdf9 Feb 2026
Withdrawal Update Form 2File: Form 2.pdf9 Feb 2026
Withdrawal Update Form 3File: Form 3 Sign.pdf9 Feb 2026
Withdrawal Update Form 3File: Form 3 Sign.pdf9 Feb 2026
Building plan approvalFile: 2,3,4,5,6,8,9,10 floor plan.pdf4 Sep 2025
Building plan approvalFile: First floor plan.pdf4 Sep 2025
Building plan approvalFile: Ground parking plan.pdf4 Sep 2025
Building plan approvalFile: Podium floor plan.pdf4 Sep 2025
Building plan approvalFile: Seventh floor plan.pdf4 Sep 2025
Layout approvalFile: Terrace floor plan.pdf4 Sep 2025
Form 1File: FORM 1.pdf21 Aug 2025
Form 2File: FORM 2 (1).pdf21 Aug 2025
Form 3File: FORM 3 (2).pdf21 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Of Sold Unsold Units_page-0001 (1).pdf21 Aug 2025
Withdrawal Update Form 1File: Primal Saundaryam Form 1 - 30062025.pdf21 Aug 2025
Withdrawal Update Form 2File: Primal Saundaryam Form 2 - 30062025.pdf21 Aug 2025
Withdrawal Update Form 3File: Form 3 Jun 25.pdf21 Aug 2025
Proforma of Agreement for saleFile: PRIMAL SAUNDARYAM DRAFT AGREEMENT.pdf11 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: DocScanner 08-Jan-2025 1-24 pm.pdf15 Jan 2025
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B.pdf9 Jan 2025
Details of encumbrances concerned to FinanceFile: Encumbrances merged.pdf8 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: CC Verification.pdf8 Jan 2025
CERSAI detailsFile: Cersai Undertaking.pdf8 Jan 2025
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf8 Jan 2025
Details of encumbrances concerned to LegalFile: Encumbrances merged.pdf8 Jan 2025
Copy of the legal title reportFile: PRIMAL SUNDARAM - RERA.pdf30 Dec 2024
Building plan approvalFile: HPSCANNER2458.pdf27 Dec 2024
Building plan approvalFile: HPSCANNER2459.pdf27 Dec 2024
Building plan approvalFile: HPSCANNER2460.pdf27 Dec 2024
Building plan approvalFile: HPSCANNER2461.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER2458.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER2459.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER2460.pdf27 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: HPSCANNER2461.pdf27 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 CA Scanned final_compressed.pdf25 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engg.pdf25 Dec 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report With Respect To Agreement To Sale.pdf25 Dec 2024
Proforma of Allotment letterFile: ALLOTMENT LETTER_compressed.pdf23 Dec 2024
Declaration in FORM BFile: FORM B.pdf23 Dec 2024
Deviation Report with respect to Allotment letterFile: DEVIATION IN RESPECT TO ALLOTMENT LETTER.pdf23 Dec 2024
Other - TechnicalFile: NEW DECLARATION.pdf23 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE ADITYA.pdf23 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE DHANANJAY.pdf23 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE GORAKSHNATH.pdf23 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE YOGESH.pdf23 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE NAVNATH.pdf23 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: DISCLOSURE AKASH.pdf23 Dec 2024
Layout approvalFile: SANCTION'.pdf19 Dec 2024
Copy of Layout Approval (in case of layout)File: SANCTION'.pdf19 Dec 2024
Other - LegalFile: 3_Saundaryam - POA -8386-2024.pdf19 Dec 2024
Other - LegalFile: 2_Saundaryam - POA -8386-2024.pdf19 Dec 2024
Other - LegalFile: 1_Saundaryam - POA -8386-2024.pdf19 Dec 2024
Other - LegalFile: 6_Saundaryam Sale deed -8384-2024.pdf19 Dec 2024
Other - LegalFile: 4_Saundaryam Sale deed -8384-2024.pdf19 Dec 2024
Other - LegalFile: 3_Saundaryam Sale deed -8384-2024.pdf19 Dec 2024
Other - LegalFile: 2_Saundaryam Sale deed -8384-2024.pdf19 Dec 2024
Other - LegalFile: 1_Saundaryam Sale deed -8384-2024.pdf19 Dec 2024
Other - LegalFile: 5_Saundaryam Sale deed -8384-2024.pdf19 Dec 2024
Disclosure for secured/unsecured finance availed for the projectFile: LOAN DISCLOSURE.pdf19 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf18 Dec 2024
Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT.pdf18 Dec 2024
PAN CardFile: Firm PAN.pdf28 Oct 2024

How this compares with Pune

11%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRIMAL SAUNDARYAM on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHIKHALI13,700+ in Pune

Builder: PRIMAL SAUNDARYAM

PRIMAL SAUNDARYAM has 1 registration on MahaRERA, including PRIMAL SAUNDARYAM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PRIMAL SAUNDARYAM is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRIMAL SAUNDARYAM?

The registered promoter entity is PRIMAL SAUNDARYAM, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRIMAL SAUNDARYAM?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRIMAL SAUNDARYAM?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRIMAL SAUNDARYAM?

The professionals named in the filing: Architect: IP ASSOCIATES; Engineer: CHETAN PATIL; Engineer: YOGESHWARI CHANDRAKANT PATIL; Chartered Accountant: Patni & Patni; Chartered Accountant: Navdeep Jindal; Chartered Accountant: Dolly Gandhi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRIMAL SAUNDARYAM?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRIMAL SAUNDARYAM. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRIMAL SAUNDARYAM to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.