ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai City, Maharashtra / Prestige Ocean Towers - North

Registered Litigation declared Residential / Group Housing project

Prestige Ocean Towers - North

By Prestige Projects Private Limited

RG-MH-06719 · RERA P51900053993 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Litigation declared, 5 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai City registration emailed to you, free during the pilot beta.
Jun 2030Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 0%
42 of 112Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 186 documents Report an error

Prestige Ocean Towers - North is a Residential / Group Housing project by Prestige Projects Private Limited in Mumbai City, Maharashtra, registered with MahaRERA as P51900053993 on 18 Dec 2023. Possession is promised by 30 Jun 2030. 70 of the 112 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NamePrestige Ocean Towers - North
  • TypeResidential / Group Housing
  • Location
    • Junction of Maharshi Karve Rd and Dr. Babasaheb Jaykar Marg and SK Patil Udyan
    • Charni Road
    • Mumbai City
    • 400002
  • Pincode400002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900053993
  • ReraGenie IDRG-MH-06719

Builder

  • NamePrestige Projects Private Limited
  • Entity typeCompany
  • DirectorsBadrunissa Irfan, Almas Rezwan, Sameera Noaman, Neelam Chhiber
  • Other registrations1 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredDec 2023PromisedJun 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on18 Dec 2023
  • Promised completion30 Jun 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed186 files

Current status

62%70 of 112 units booked
17.8%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Prestige Ocean Towers - North - Wing 1 /Tower 1NA59441120112

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 0%.

Prestige Ocean Towers - North - Wing 1 /Tower 1: 0% average across the applicable activities

ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed355

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots355
Closed/Covered355

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,116 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI21604.93
Proposed, not sanctioned21,605 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Towers, 1 Commissariat Road, Bangalore - 560025
Estimated costRs 547.14 cr
Cost incurredRs 97.26 cr
Work done17.78%
BuildingWingEstimatedIncurred
Prestige Ocean Towers - North - Wing 1 /Tower 1NARs 419.52 crRs 78.98 cr
-NARs 127.62 crRs 18.28 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPRAJAKTA KADU
EngineerSHREE VENKATADRI ASSOCIATES
EngineerSterling Engineering Consultancy PVT LTD
Chartered AccountantMs. BHUVANA BHAT & ASSOCIATES
Chartered AccountantMuniyal Padmanabha Bhat
PartnerRole in project
Prestige Projects Private Limited-

Litigation declared5

CaseCourtStatus
94/2015Bombay High CourtOngoing
1603/2018Bombay High CourtClosed
6002/2019Bombay High CourtOngoing
1020/2007Small Causes CourtOngoing
OA-3/2024MREATOngoing

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 30 Mar 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 30 Mar 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2030

Documents filed186

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 186 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Q4_Form 1_Ocean Tower_North.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2_Q4_Ocean Tower_North.pdf20 Apr 2026
Withdrawal Update Form 3File: Q3 Form 3 OT_North.pdf20 Apr 2026
Form 2A (FY 2024-2025)File: Form 2 FY 24 - 25 (North).pdf1 Apr 2026
Form 5 (FY 2024-2025)File: Ocean Tower North Form 5.pdf1 Apr 2026
Building plan approvalFile: Page 2.pdf30 Mar 2026
Building plan approvalFile: Page 3.pdf30 Mar 2026
Building plan approvalFile: Page 4.pdf30 Mar 2026
Building plan approvalFile: Page 5.pdf30 Mar 2026
Building plan approvalFile: Page 6.pdf30 Mar 2026
Building plan approvalFile: Page 7.pdf30 Mar 2026
Building plan approvalFile: Page 8.pdf30 Mar 2026
Building plan approvalFile: Page 9.pdf30 Mar 2026
Building plan approvalFile: Page 10.pdf30 Mar 2026
Building plan approvalFile: Page 11.pdf30 Mar 2026
Building plan approvalFile: Page 12.pdf30 Mar 2026
Building plan approvalFile: Page 13.pdf30 Mar 2026
Building plan approvalFile: Page 14.pdf30 Mar 2026
Building plan approvalFile: Page 15.pdf30 Mar 2026
Building plan approvalFile: Page 16.pdf30 Mar 2026
Building plan approvalFile: Page 17.pdf30 Mar 2026
Building plan approvalFile: Page 18.pdf30 Mar 2026
Building plan approvalFile: Page 19.pdf30 Mar 2026
Building plan approvalFile: Page 20.pdf30 Mar 2026
Building plan approvalFile: Page 21.pdf30 Mar 2026
Building plan approvalFile: Page 22.pdf30 Mar 2026
Building plan approvalFile: Page 23.pdf30 Mar 2026
Building plan approvalFile: Page 24.pdf30 Mar 2026
Building plan approvalFile: Page 25.pdf30 Mar 2026
Building plan approvalFile: Page 26.pdf30 Mar 2026
Layout approvalFile: Layout Plan - Page 1 (2).pdf30 Mar 2026
Withdrawal Update Form 1File: Q3 Form 1_OT North.pdf27 Mar 2026
Withdrawal Update Form 2File: Q3 Form 2 OT_North.pdf27 Mar 2026
Withdrawal Update Form 3File: Q3 Form 3 OT_North.pdf27 Mar 2026
Form 1File: Q2_Form 1_OT_North.pdf29 Jan 2026
Form 2File: Q2 Form 2_OT_North.pdf29 Jan 2026
Form 3File: Q2_Form 3_OT North.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: Ocean Tower-North-sold unsold.pdf29 Jan 2026
Form 1File: Q1_Form_1_OT North _.pdf29 Jan 2026
Form 2File: Q1 Form 2_OT_North.pdf29 Jan 2026
Form 3File: Q1_Form 3_OT North.pdf29 Jan 2026
Disclosure of Sold and Booked InventoryFile: Q1_OT_North.pdf29 Jan 2026
Form 1File: Q3 Form 1_OT North.pdf28 Jan 2026
Form 2File: Q3 Form 2 OT_North.pdf28 Jan 2026
Form 3File: Q3 Form 3 OT_North.pdf28 Jan 2026
Disclosure of Sold and Booked InventoryFile: Q3_OT North_Sold Unsold.pdf28 Jan 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 OT North Q4.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 OT North Q4.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 OT North Q4.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold OT North Q4.pdf19 Apr 2025
Other - FinanceFile: Details of Encumbrances - Finance - OT-N.pdf28 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: OT North Form 1 Q3.pdf29 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: OT North Form 3 Q3.pdf29 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: OT North Form 2 Q3.pdf29 Jan 2025
Disclosure of sold/ booked inventoryFile: OT North Sold Unsold Q3.pdf29 Jan 2025
Layout approvalFile: 1.pdf16 Dec 2024
Building plan approvalFile: 2.pdf16 Dec 2024
Building plan approvalFile: 3.pdf16 Dec 2024
Building plan approvalFile: 4.pdf16 Dec 2024
Building plan approvalFile: 5.pdf16 Dec 2024
Building plan approvalFile: 6.pdf16 Dec 2024
Building plan approvalFile: 7.pdf16 Dec 2024
Building plan approvalFile: 8.pdf16 Dec 2024
Building plan approvalFile: 9.pdf16 Dec 2024
Building plan approvalFile: 10.pdf16 Dec 2024
Building plan approvalFile: 11.pdf16 Dec 2024
Building plan approvalFile: 12.pdf16 Dec 2024
Building plan approvalFile: 13.pdf16 Dec 2024
Building plan approvalFile: 14.pdf16 Dec 2024
Building plan approvalFile: 15.pdf16 Dec 2024
Building plan approvalFile: 16.pdf16 Dec 2024
Building plan approvalFile: 17.pdf16 Dec 2024
Building plan approvalFile: 18.pdf16 Dec 2024
Building plan approvalFile: 19.pdf16 Dec 2024
Building plan approvalFile: 20.pdf16 Dec 2024
Building plan approvalFile: 21.pdf16 Dec 2024
Building plan approvalFile: 22.pdf16 Dec 2024
Copy of Layout Approval (in case of layout)File: 1.pdf16 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 13.pdf16 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: 11.pdf16 Dec 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationStatusPromisedDelivered
Prestige Great AcresThe Prestige City Anekal BangaloreCompletedAug 2022Late, Apr 2023

How this compares with Mumbai City

62%of this project is bookeddistrict median 17%
33%of Mumbai City projects moved their completion datethis one has not
25%of Mumbai City registrations have lapsed or been cancelledthis one is on the register

Computed across the 780+ Mumbai City projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Prestige Ocean Towers - North on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Charni Road780+ in Mumbai City

2 kmPrestige Ocean Towers - Completed 21Lapsed / revoked 23Other 52Dot size: filed unitsN

Filed coordinates, straight-line distance. 96 registered projects within 2 km.

Builder: Prestige Projects Private Limited

Prestige Projects Private Limited has 2 registrations on MahaRERA, including Prestige Ocean Towers - North and Prestige Ocean Towers - South. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai City district page.

Frequently asked questions

What are my rights if Prestige Ocean Towers - North is delayed beyond 30 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prestige Ocean Towers - North?

The registered promoter entity is Prestige Projects Private Limited, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prestige Ocean Towers - North?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Prestige Ocean Towers - North?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prestige Ocean Towers - North?

The professionals named in the filing: Architect: PRAJAKTA KADU; Engineer: SHREE VENKATADRI ASSOCIATES; Engineer: Sterling Engineering Consultancy PVT LTD; Chartered Accountant: Ms. BHUVANA BHAT & ASSOCIATES; Chartered Accountant: Muniyal Padmanabha Bhat. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prestige Ocean Towers - North?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prestige Ocean Towers - North. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prestige Ocean Towers - North to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.