Home / Browse projects / Pune, Maharashtra / PRESIDENTIAL TOWER

Registered No litigation declared Residential / Group Housing project

PRESIDENTIAL TOWER

By GOVIND RAVIRAJ DEVELOPERS LLP

RG-MH-76697 · RERA P52100047282 · Last updated on MahaRERA portal: 25 Apr 2026

Source: official MahaRERA filing

Red flags

  • Encumbrance declared on the project land

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
15 of 33Construction stages doneacross 3 buildings; furthest along: Internal walls, 90%
62 of 170Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 370 documents Report an error

PRESIDENTIAL TOWER is a Residential / Group Housing project by GOVIND RAVIRAJ DEVELOPERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100047282 on 17 Oct 2022. Possession is promised by 31 Dec 2026. 108 of the 170 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.

At a glance

Project

  • NamePRESIDENTIAL TOWER
  • TypeResidential / Group Housing
  • Location
    • PIMPLE SAUDAGAR
    • OPP CITY PRIDE
    • Pimpale Saudagar
    • Haveli
    • Pune
    • 411027
  • Pincode411027
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047282
  • ReraGenie IDRG-MH-76697

Builder

  • NameGOVIND RAVIRAJ DEVELOPERS LLP
  • Entity typePartnership
  • PartnersRAVINDRA NAUPATLAL SAKLA, SHATRUGHNA SITARAM KATE, ABHINANDAN RAVINDRA SAKLA, BHARAT SITARAM KATE
  • Declared earlier projects2 →

Key dates

this monthRegisteredOct 2022PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Oct 2022
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings3 building records
  • Documents filed370 files

Current status

64%108 of 170 units booked
70.9%Work done, per cost certificate

Figures as on 25 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
C BUILDING MAHADA AND COMMERCIALNA63181028
B BUILDINGNA302495095
A BUILDINGNA302447047

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.

C BUILDING MAHADA AND COMMERCIAL77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises69%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.42%
B BUILDING77%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises90%
Sanitary Fittings within the flats / premises69%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.42%
A BUILDING72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises83%
Sanitary Fittings within the flats / premises68%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.41%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.34%

Progress on shared amenities15

As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes30%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes30%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed3

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3
Closed/Covered3
BuildingClosed/CoveredTotal
C BUILDING MAHADA AND COMMERCIAL11
B BUILDING11
A BUILDING11

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area7,096 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
CERSAI search filedYes
Declared on29 Jul 2025

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI30609.28
Proposed, not sanctioned29,799 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNANAPETH,612-B, PARSI AGIARY, NANAPETH, PUNE 411002
Estimated costRs 109.41 cr
Cost incurredRs 77.57 cr
Work done70.9%
BuildingWingEstimatedIncurred
C BUILDING MAHADA AND COMMERCIALNARs 32.28 crRs 24.21 cr
B BUILDINGNARs 32.28 crRs 23.88 cr
A BUILDINGNARs 32.28 crRs 27.84 cr
-NARs 12.58 crRs 1.64 cr

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARC LIASONING MAHENDRA THAKUR
ArchitectARC DESIGN SIDDHI SAKLA
ArchitectDream space architect
EngineerRCC PARAG CHOPADA
EngineerPLUMBING SACHIN Gurubheti
EngineerMahadev Todkar
EngineerVikas M Kale
Chartered AccountantPatel and Sharma
Chartered AccountantAgarwal Sarawgi and Associates
PartnerRole in project
GOVIND RAVIRAJ DEVELOPERS LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 31 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Apr 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 8 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed370

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 370 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: PT- FORM 1.pdf25 Apr 2026
Withdrawal Update Form 2File: PT - FORM 2.pdf25 Apr 2026
Withdrawal Update Form 3File: PT - FORM 3 - CA.pdf25 Apr 2026
Withdrawal Update Form 1File: ARCHITECT CERTIFICATE - FORM -1.pdf31 Jan 2026
Withdrawal Update Form 2File: ENGINEERS CERTIFICATE - FORM 2.pdf31 Jan 2026
Withdrawal Update Form 3File: FORM 3 - CA CERTIFICATE.pdf31 Jan 2026
Form 2A (FY 2022-2023)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (1).pdf5 Nov 2025
Form 2A (FY 2023-2024)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf5 Nov 2025
Form 2A (FY 2024-2025)File: FORM 2A - PRESIDENTIAL TOWER 24-25.PDF5 Nov 2025
Withdrawal Update Form 1File: PT - FORM 1.PDF27 Oct 2025
Withdrawal Update Form 1File: PT - FORM 1.PDF27 Oct 2025
Withdrawal Update Form 1File: PT - FORM 1.PDF27 Oct 2025
Withdrawal Update Form 2File: PT - FORM 2.PDF27 Oct 2025
Withdrawal Update Form 2File: PT - FORM 2.PDF27 Oct 2025
Withdrawal Update Form 2File: PT - FORM 2.PDF27 Oct 2025
Withdrawal Update Form 3File: FOrm 3 with sold unsold disclosure sep 25.pdf27 Oct 2025
Withdrawal Update Form 3File: FOrm 3 with sold unsold disclosure sep 25.pdf27 Oct 2025
Withdrawal Update Form 3File: FOrm 3 with sold unsold disclosure sep 25.pdf27 Oct 2025
Withdrawal Update Form 1File: PT - FORM 1 - ARCHITECT CERTIFICATE.PDF12 Aug 2025
Withdrawal Update Form 1File: PT - FORM 1 - ARCHITECT CERTIFICATE.PDF12 Aug 2025
Withdrawal Update Form 2File: PT - FORM 2 - ENGINEERS CERTIFICATE.PDF12 Aug 2025
Withdrawal Update Form 2File: PT - FORM 2 - ENGINEERS CERTIFICATE.PDF12 Aug 2025
Withdrawal Update Form 3File: PT - FORM 3 - CA Certificate_compressed.pdf12 Aug 2025
Withdrawal Update Form 3File: PT - FORM 3 - CA Certificate_compressed.pdf12 Aug 2025
Form 1File: Form 1 mar 24.pdf7 Aug 2025
Form 2File: Form 2 Mar 24.pdf7 Aug 2025
Form 3File: Form 3 Mar 24.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold mar 24.pdf7 Aug 2025
Form 1File: Form 1 dec 23.pdf7 Aug 2025
Form 2File: Form 2 dec 23.pdf7 Aug 2025
Form 3File: Form 3 dec23.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold dec 23.pdf7 Aug 2025
Form 1File: Form 1 sept 23.pdf7 Aug 2025
Form 2File: Form 2 sept 23.pdf7 Aug 2025
Form 3File: Form 3 sept 23.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold sept 23.pdf7 Aug 2025
Form 1File: Form 1 june 23.pdf7 Aug 2025
Form 2File: Form 2 June 23.pdf7 Aug 2025
Form 3File: Form 3 june 23.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold june 23.pdf7 Aug 2025
Form 1File: Form 1 Mar 23.pdf7 Aug 2025
Form 2File: Form 2 mar 23.pdf7 Aug 2025
Form 3File: Form 3 mar 23.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold mar 23.pdf7 Aug 2025
Form 1File: Form 1 Dec 22.pdf7 Aug 2025
Form 2File: Form 2 dec 22.pdf7 Aug 2025
Form 3File: Form 3 dec22.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold unsold dec22.pdf7 Aug 2025
Form 1File: PT - FORM 1 - ARCHITECT CERTIFICATE.PDF22 Jul 2025
Form 2File: PT - FORM 2 - ENGINEERS CERTIFICATE.PDF22 Jul 2025
Form 3File: PT - FORM 3 - CA Certificate_compressed.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: PT- DISCLOSURE OF SOLD UNSOLD INVENTORIES.PDF22 Jul 2025
Form 1File: Presidential Form 1 30062024.PDF22 Jul 2025
Form 2File: Presidential Form 2 30062024.PDF22 Jul 2025
Form 3File: Presidential Form 3 30062024 compressed.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Presidential Sold Unsold 30062024.PDF22 Jul 2025
Form 1File: PRESIDENTIAL TOWER - FORM 1.PDF22 Jul 2025
Form 2File: PRESIDENTIAL TOWER - FORM 2.PDF22 Jul 2025
Form 3File: PRESIDENTIAL TOWER - FORM 3_compressed.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: PRESIDENTIAL TOWER - SOLD UNSOLD.PDF22 Jul 2025
Form 1File: Form 1 - Architect Certificate - 31 12 2024.PDF22 Jul 2025
Form 2File: Form 2 - Engineers Certificate - 31 12 2024.PDF22 Jul 2025
Form 3File: Form 3 - CA Certificate - 31 12 2024_compressed.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventories -31 12 2024.PDF22 Jul 2025
Form 1File: FORM 1 - ARCHITECT CERTIFICATE - PT.PDF22 Jul 2025
Form 2File: PRESIDENTIAL TOWER - - ENGINEERS CERTIFICATE.PDF22 Jul 2025
Form 3File: FORM 3 - CA CERTIFICATE - PT_compressed.pdf22 Jul 2025
Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD - PT.PDF22 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE - PT.PDF19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE - PT_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PRESIDENTIAL TOWER - - ENGINEERS CERTIFICATE.PDF19 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD - PT.PDF19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE - PT.PDF15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE - PT.PDF15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE - PT.PDF15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE - PT_compressed.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD - PT.PDF15 Apr 2025
Declaration about Commencement CertificateFile: Presidential Tower - Declaration about CC.PDF9 Apr 2025
Layout approvalFile: 1-15 HPSC0901 Layout.pdf8 Apr 2025
Building plan approvalFile: 2-15 HPSC0902 A, B, C 2nd Floor Basement plan.pdf8 Apr 2025

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered late
ProjectLocationFlatsStatusPromisedDelivered
WEST AVENUEOPP PMRDA OFFICE AUNDH PUNE242CompletedDec 2022Late, Dec 2022
93 AVENUEFATIM NAGAR JUNCTION WANWADI PUNE320CompletedAug 2018Late, Aug 2018

How this compares with Pune

64%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRESIDENTIAL TOWER on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OPP CITY PRIDE13,700+ in Pune

2 kmPRESIDENTIAL TOWERCompleted 96Lapsed / revoked 44Other 83Dot size: filed unitsN

Filed coordinates, straight-line distance. 223 registered projects within 2 km.

Builder: GOVIND RAVIRAJ DEVELOPERS LLP

GOVIND RAVIRAJ DEVELOPERS LLP has 1 registration on MahaRERA, including PRESIDENTIAL TOWER. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PRESIDENTIAL TOWER is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRESIDENTIAL TOWER?

The registered promoter entity is GOVIND RAVIRAJ DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRESIDENTIAL TOWER?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRESIDENTIAL TOWER?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRESIDENTIAL TOWER?

The professionals named in the filing: Architect: ARC LIASONING MAHENDRA THAKUR; Architect: ARC DESIGN SIDDHI SAKLA; Architect: Dream space architect; Engineer: RCC PARAG CHOPADA; Engineer: PLUMBING SACHIN Gurubheti; Engineer: Mahadev Todkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRESIDENTIAL TOWER?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRESIDENTIAL TOWER. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRESIDENTIAL TOWER to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.