PRESIDENTIAL TOWER
By GOVIND RAVIRAJ DEVELOPERS LLP
RG-MH-76697 · RERA P52100047282 · Last updated on MahaRERA portal: 25 Apr 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Encumbrance declared on the project land
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRESIDENTIAL TOWER is a Residential / Group Housing project by GOVIND RAVIRAJ DEVELOPERS LLP in Pune, Maharashtra, registered with MahaRERA as P52100047282 on 17 Oct 2022. Possession is promised by 31 Dec 2026. 108 of the 170 units on this registration are recorded sold or booked, and 15 of 33 construction stages are filed complete.
At a glance
Project
- NamePRESIDENTIAL TOWER
- TypeResidential / Group Housing
- Location
- PIMPLE SAUDAGAR
- OPP CITY PRIDE
- Pimpale Saudagar
- Haveli
- Pune
- 411027
- Pincode411027
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100047282
- ReraGenie IDRG-MH-76697
Builder
- NameGOVIND RAVIRAJ DEVELOPERS LLP
- Entity typePartnership
- PartnersRAVINDRA NAUPATLAL SAKLA, SHATRUGHNA SITARAM KATE, ABHINANDAN RAVINDRA SAKLA, BHARAT SITARAM KATE
- Declared earlier projects2 →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on17 Oct 2022
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings3 building records
- Documents filed370 files
Current status
Figures as on 25 Apr 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| C BUILDING MAHADA AND COMMERCIAL | NA | 6 | 3 | 18 | 10 | 28 |
| B BUILDING | NA | 30 | 24 | 95 | 0 | 95 |
| A BUILDING | NA | 30 | 24 | 47 | 0 | 47 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 25 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
15 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Internal walls, at 90%.
C BUILDING MAHADA AND COMMERCIAL77%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 69% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 42% |
B BUILDING77%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 69% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 85% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 60% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 42% |
A BUILDING72%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 83% |
| Sanitary Fittings within the flats / premises | 68% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 41% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 34% |
Progress on shared amenities15
As on 25 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 30% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 40% |
| Storm Water Drains | Yes | 50% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 30% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed3
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| C BUILDING MAHADA AND COMMERCIAL | 1 | 1 |
| B BUILDING | 1 | 1 |
| A BUILDING | 1 | 1 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| C BUILDING MAHADA AND COMMERCIAL | NA | Rs 32.28 cr | Rs 24.21 cr |
| B BUILDING | NA | Rs 32.28 cr | Rs 23.88 cr |
| A BUILDING | NA | Rs 32.28 cr | Rs 27.84 cr |
| - | NA | Rs 12.58 cr | Rs 1.64 cr |
Certifying professionals and partners9
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ARC LIASONING MAHENDRA THAKUR |
| Architect | ARC DESIGN SIDDHI SAKLA |
| Architect | Dream space architect |
| Engineer | RCC PARAG CHOPADA |
| Engineer | PLUMBING SACHIN Gurubheti |
| Engineer | Mahadev Todkar |
| Engineer | Vikas M Kale |
| Chartered Accountant | Patel and Sharma |
| Chartered Accountant | Agarwal Sarawgi and Associates |
| Partner | Role in project |
|---|---|
| GOVIND RAVIRAJ DEVELOPERS LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Aug 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Apr 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Apr 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed370
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 370 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: PT- FORM 1.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: PT - FORM 2.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: PT - FORM 3 - CA.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE - FORM -1.pdf | 31 Jan 2026 |
| Withdrawal Update Form 2File: ENGINEERS CERTIFICATE - FORM 2.pdf | 31 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 - CA CERTIFICATE.pdf | 31 Jan 2026 |
| Form 2A (FY 2022-2023)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2022-23) (1).pdf | 5 Nov 2025 |
| Form 2A (FY 2023-2024)File: 1 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf | 5 Nov 2025 |
| Form 2A (FY 2024-2025)File: FORM 2A - PRESIDENTIAL TOWER 24-25.PDF | 5 Nov 2025 |
| Withdrawal Update Form 1File: PT - FORM 1.PDF | 27 Oct 2025 |
| Withdrawal Update Form 1File: PT - FORM 1.PDF | 27 Oct 2025 |
| Withdrawal Update Form 1File: PT - FORM 1.PDF | 27 Oct 2025 |
| Withdrawal Update Form 2File: PT - FORM 2.PDF | 27 Oct 2025 |
| Withdrawal Update Form 2File: PT - FORM 2.PDF | 27 Oct 2025 |
| Withdrawal Update Form 2File: PT - FORM 2.PDF | 27 Oct 2025 |
| Withdrawal Update Form 3File: FOrm 3 with sold unsold disclosure sep 25.pdf | 27 Oct 2025 |
| Withdrawal Update Form 3File: FOrm 3 with sold unsold disclosure sep 25.pdf | 27 Oct 2025 |
| Withdrawal Update Form 3File: FOrm 3 with sold unsold disclosure sep 25.pdf | 27 Oct 2025 |
| Withdrawal Update Form 1File: PT - FORM 1 - ARCHITECT CERTIFICATE.PDF | 12 Aug 2025 |
| Withdrawal Update Form 1File: PT - FORM 1 - ARCHITECT CERTIFICATE.PDF | 12 Aug 2025 |
| Withdrawal Update Form 2File: PT - FORM 2 - ENGINEERS CERTIFICATE.PDF | 12 Aug 2025 |
| Withdrawal Update Form 2File: PT - FORM 2 - ENGINEERS CERTIFICATE.PDF | 12 Aug 2025 |
| Withdrawal Update Form 3File: PT - FORM 3 - CA Certificate_compressed.pdf | 12 Aug 2025 |
| Withdrawal Update Form 3File: PT - FORM 3 - CA Certificate_compressed.pdf | 12 Aug 2025 |
| Form 1File: Form 1 mar 24.pdf | 7 Aug 2025 |
| Form 2File: Form 2 Mar 24.pdf | 7 Aug 2025 |
| Form 3File: Form 3 Mar 24.pdf | 7 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold mar 24.pdf | 7 Aug 2025 |
| Form 1File: Form 1 dec 23.pdf | 7 Aug 2025 |
| Form 2File: Form 2 dec 23.pdf | 7 Aug 2025 |
| Form 3File: Form 3 dec23.pdf | 7 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold dec 23.pdf | 7 Aug 2025 |
| Form 1File: Form 1 sept 23.pdf | 7 Aug 2025 |
| Form 2File: Form 2 sept 23.pdf | 7 Aug 2025 |
| Form 3File: Form 3 sept 23.pdf | 7 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold sept 23.pdf | 7 Aug 2025 |
| Form 1File: Form 1 june 23.pdf | 7 Aug 2025 |
| Form 2File: Form 2 June 23.pdf | 7 Aug 2025 |
| Form 3File: Form 3 june 23.pdf | 7 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold june 23.pdf | 7 Aug 2025 |
| Form 1File: Form 1 Mar 23.pdf | 7 Aug 2025 |
| Form 2File: Form 2 mar 23.pdf | 7 Aug 2025 |
| Form 3File: Form 3 mar 23.pdf | 7 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold mar 23.pdf | 7 Aug 2025 |
| Form 1File: Form 1 Dec 22.pdf | 7 Aug 2025 |
| Form 2File: Form 2 dec 22.pdf | 7 Aug 2025 |
| Form 3File: Form 3 dec22.pdf | 7 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold unsold dec22.pdf | 7 Aug 2025 |
| Form 1File: PT - FORM 1 - ARCHITECT CERTIFICATE.PDF | 22 Jul 2025 |
| Form 2File: PT - FORM 2 - ENGINEERS CERTIFICATE.PDF | 22 Jul 2025 |
| Form 3File: PT - FORM 3 - CA Certificate_compressed.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: PT- DISCLOSURE OF SOLD UNSOLD INVENTORIES.PDF | 22 Jul 2025 |
| Form 1File: Presidential Form 1 30062024.PDF | 22 Jul 2025 |
| Form 2File: Presidential Form 2 30062024.PDF | 22 Jul 2025 |
| Form 3File: Presidential Form 3 30062024 compressed.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Presidential Sold Unsold 30062024.PDF | 22 Jul 2025 |
| Form 1File: PRESIDENTIAL TOWER - FORM 1.PDF | 22 Jul 2025 |
| Form 2File: PRESIDENTIAL TOWER - FORM 2.PDF | 22 Jul 2025 |
| Form 3File: PRESIDENTIAL TOWER - FORM 3_compressed.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: PRESIDENTIAL TOWER - SOLD UNSOLD.PDF | 22 Jul 2025 |
| Form 1File: Form 1 - Architect Certificate - 31 12 2024.PDF | 22 Jul 2025 |
| Form 2File: Form 2 - Engineers Certificate - 31 12 2024.PDF | 22 Jul 2025 |
| Form 3File: Form 3 - CA Certificate - 31 12 2024_compressed.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventories -31 12 2024.PDF | 22 Jul 2025 |
| Form 1File: FORM 1 - ARCHITECT CERTIFICATE - PT.PDF | 22 Jul 2025 |
| Form 2File: PRESIDENTIAL TOWER - - ENGINEERS CERTIFICATE.PDF | 22 Jul 2025 |
| Form 3File: FORM 3 - CA CERTIFICATE - PT_compressed.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLD UNSOLD - PT.PDF | 22 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE - PT.PDF | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE - PT_compressed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: PRESIDENTIAL TOWER - - ENGINEERS CERTIFICATE.PDF | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD - PT.PDF | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE - PT.PDF | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE - PT.PDF | 15 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 - ARCHITECT CERTIFICATE - PT.PDF | 15 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - CA CERTIFICATE - PT_compressed.pdf | 15 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: DISCLOSURE OF SOLD UNSOLD - PT.PDF | 15 Apr 2025 |
| Declaration about Commencement CertificateFile: Presidential Tower - Declaration about CC.PDF | 9 Apr 2025 |
| Layout approvalFile: 1-15 HPSC0901 Layout.pdf | 8 Apr 2025 |
| Building plan approvalFile: 2-15 HPSC0902 A, B, C 2nd Floor Basement plan.pdf | 8 Apr 2025 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| WEST AVENUE | OPP PMRDA OFFICE AUNDH PUNE | 242 | Completed | Dec 2022 | Late, Dec 2022 |
| 93 AVENUE | FATIM NAGAR JUNCTION WANWADI PUNE | 320 | Completed | Aug 2018 | Late, Aug 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 370 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PRESIDENTIAL TOWER on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near OPP CITY PRIDE13,700+ in Pune
Filed coordinates, straight-line distance. 223 registered projects within 2 km.
VANTAGE TWENTY ONE
VIVANTA REALTY
SHAKTI GARDENS
Grandwell Properties and Leasing Private L
24K OPULA
KOLTE-PATIL DEVELOPERS LIMITED
Sukhwani Minerva
Sukhwani Ramchandani LLP
MIDORI TOWER PHASE 4
VIKRAM DEVELOPERS AND PROMOTERS
Sai Aura
WJV LANDMARKS LLP
Builder: GOVIND RAVIRAJ DEVELOPERS LLP
GOVIND RAVIRAJ DEVELOPERS LLP has 1 registration on MahaRERA, including PRESIDENTIAL TOWER. Its filings disclose 2 earlier MahaRERA projects: declares 0 of 2 past projects completed on time. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if PRESIDENTIAL TOWER is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRESIDENTIAL TOWER?
The registered promoter entity is GOVIND RAVIRAJ DEVELOPERS LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRESIDENTIAL TOWER?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PRESIDENTIAL TOWER?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRESIDENTIAL TOWER?
The professionals named in the filing: Architect: ARC LIASONING MAHENDRA THAKUR; Architect: ARC DESIGN SIDDHI SAKLA; Architect: Dream space architect; Engineer: RCC PARAG CHOPADA; Engineer: PLUMBING SACHIN Gurubheti; Engineer: Mahadev Todkar. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRESIDENTIAL TOWER?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback