Home / Browse projects / Palghar, Maharashtra / PRECILLA CHS LTD

Completed No litigation declared Others project

PRECILLA CHS LTD

By BLUE OAK INFRASTRUCTURE

RG-MH-64108 · RERA P99000050355 · Last updated on MahaRERA portal: 8 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedregistration recorded completed
5 of 11Construction stages donefurthest along: Internal walls, 85%
20 of 52Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

PRECILLA CHS LTD is a Others project by BLUE OAK INFRASTRUCTURE in Palghar, Maharashtra, registered with MahaRERA as P99000050355 on 5 Apr 2023. The registration is recorded completed; possession was promised by 31 Dec 2026. 32 of the 52 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.

At a glance

Project

  • NamePRECILLA CHS LTD
  • TypeOthers
  • Location
    • VILLAGE TULING VARDHAMAN PARK VIJAY NAGAR
    • NALLASOPARA EAST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401209
  • Pincode401209
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000050355
  • ReraGenie IDRG-MH-64108

Builder

  • NameBLUE OAK INFRASTRUCTURE
  • Entity typePartnership
  • GSTIN27AAPFB3391N1ZT
  • PartnersAMIT BHARATKUMAR SHAH, RAMESH YADUNAND JHA, MAHAVEER SAMPATLAL JAIN

Key dates

this monthRegisteredApr 2023PromisedDec 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Apr 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Current status

62%32 of 52 units booked

Figures as on 8 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRECILLA CHS LTDNA77401252

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 8 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 85%.

PRECILLA CHS LTD: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises85%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks70%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.70%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area659 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Oct 2024
LandownerVillageDistrict
PRECILLA CHS LTDVasai-Virar City (M Corp)Palghar

Approvals and building plan

Sanctioning authorityVVCMC
Permissible FSI2258.56
Proposed, not sanctioned2,259 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNALLASOPARA WEST

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMEGA ARCH PLUS
EngineerPRADEEP PARDE
EngineerDARSH CONSULT
EngineerAbu Sahma
Chartered AccountantPRATIK VORA
Chartered AccountantS.LAKDAWALA & ASSOCIATES
Chartered AccountantMAA & COMPANY
PartnerRole in project
BLUE OAK INFRASTRUCTURE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Mar 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Mar 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Mar 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC Form4 OC Verification.pdf8 Oct 2025
Occupational CertificateFile: OC_FORM-4_New_merged.pdf25 Sep 2025
Form 5 (FY 2024-2025)File: Form 5_FY 2024-25_Signed.pdf23 Sep 2025
Form 2A (FY 2023-2024)File: 2.Form 2A Blue oak Infrastructure FY 2023-24.pdf20 Sep 2025
Form 2A (FY 2024-2025)File: Form 2A Blue oak Infrastructure FY 2024-25.pdf19 Sep 2025
Form 1File: Form-1 Apr to Jun 2025.pdf18 Aug 2025
Form 2File: Form 2 Apr to Jun 2025.pdf18 Aug 2025
Form 3File: Form 3 Apr to Jun 2025.pdf18 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold List Q-1 (25-26).pdf18 Aug 2025
Form 1File: Form 1 Jan to Mar 25.pdf16 Aug 2025
Form 2File: Form 2 Jan to March 25.pdf16 Aug 2025
Form 3File: Form 3 Jan to Mar 2025_11zon.pdf16 Aug 2025
Disclosure of Sold and Booked InventoryFile: Sold-Unsold List Q-4 (24-25).pdf16 Aug 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 23-24_Signed.pdf5 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Oct to Dec 24.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jul to Sep 2024_11zon.pdf22 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Oct to Dec 2024_11zon.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Jul to Sep 2024.pdf22 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold - Unsold Inventory (13-01-2025).pdf22 Feb 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_Blue Oak Infrastructure.pdf22 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BOI Form 1- Q1 (April-24 to June-24) .pdf8 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BOI Form 3 - April to June 2024_.pdf8 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BOI Form 2- Q1 (April-24 to June-24) .pdf8 Jan 2025
Disclosure of sold/ booked inventoryFile: BOI- Sold Unsold Inventory Record (Q1).pdf8 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (Jan to Mar 24).pdf25 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 (Jan to Mar 24).pdf25 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold (Jan to Mar 24).pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3 (Jan to Mar 24).pdf25 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration of form 3 (Q1) .pdf3 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Declaration of form 3 (Q2) .pdf3 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Blue Oak_FORM 1 (Q3) .pdf2 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Jan 25 2024.pdf2 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 .pdf2 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 dated 12-1-24.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory Record -Q3.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Inventory Record -Q3.pdf15 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Booked Inventory.pdf30 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BOI Form 1 (Q1).pdf27 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: BOI Form 1 (Q2) .pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Blue Oak Infrastructure.pdf27 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Blue Oak Infrastructure.pdf23 Dec 2023
Disclosure of sold/ booked inventoryFile: Inventory Dt 21-11-2023.pdf15 Dec 2023
CERSAI detailsFile: cersai report 28-03-2023.pdf28 Mar 2023
Details of encumbrances concerned to FinanceFile: RERA-7 Declaration for Legal and Litigation Encumbrance.pdf23 Mar 2023
Details of encumbrances concerned to LegalFile: RERA-7 Declaration for Legal and Litigation Encumbrance.pdf23 Mar 2023
Layout approvalFile: layout_11zon.pdf11 Mar 2023
Building plan approvalFile: blueprint_11zon.pdf11 Mar 2023
Copy of Layout Approval (in case of layout)File: layout_11zon.pdf11 Mar 2023
Building Plan Approval / NA Order for plotted developmentFile: blueprint_11zon.pdf11 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 CA Certificate.pdf4 Mar 2023
PAN CardFile: Pan Card.pdf2 Mar 2023
Copy of the legal title reportFile: Legal Title Report.pdf2 Mar 2023
Details of encumbrances concerned to FinanceFile: RERA-6 Declaration for Financial Encumbrance.pdf2 Mar 2023
Details of encumbrances concerned to LegalFile: RERA-6 Declaration for Financial Encumbrance.pdf2 Mar 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf2 Mar 2023
Declaration about Commencement CertificateFile: RERA-1 Declaration about Commencement Certificate.pdf2 Mar 2023
Declaration in FORM BFile: RERA-13 Form B Blue Oak Infrastructure.pdf2 Mar 2023
Declaration in FORM BFile: RERA-13 Form B Precilla chs ltd.pdf2 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - 15th Nov 2022.pdf2 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA-3A Annexure A Mahaveer Sampatlal Jain.pdf2 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA-3B Annexure A Amit BharatKumar Shah.pdf2 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA-3C Annexure A Ramesh Yadunand Jha.pdf2 Mar 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: RERA-3D Annexure A precilla chs ltd.pdf2 Mar 2023
Proforma of Agreement for saleFile: Agreement for Sale.pdf2 Mar 2023
Proforma of Allotment letterFile: Model from Allotment letter.pdf2 Mar 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: RERA-2 Declaration about Bank Account for Real Estate Project.pdf2 Mar 2023
Deviation Report with respect to Allotment letterFile: RERA-9 Information about Deviation from Model Allotment letter.pdf2 Mar 2023
Deviation Report with respect to model copy of AgreementFile: Deviation model of agreement sale.pdf2 Mar 2023

How this compares with Palghar

62%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one has not
26%of Palghar registrations have lapsed or been cancelledthis one is completed

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRECILLA CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NALLASOPARA EAST3,200+ in Palghar

2 kmPRECILLA CHS LTDCompleted 31Lapsed / revoked 32Other 98Dot size: filed unitsN

Filed coordinates, straight-line distance. 161 registered projects within 2 km.

Builder: BLUE OAK INFRASTRUCTURE

BLUE OAK INFRASTRUCTURE has 1 registration on MahaRERA, including PRECILLA CHS LTD. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if PRECILLA CHS LTD is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRECILLA CHS LTD?

The registered promoter entity is BLUE OAK INFRASTRUCTURE, a partnership as per the filing. Its GSTIN 27AAPFB3391N1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRECILLA CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRECILLA CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRECILLA CHS LTD?

The professionals named in the filing: Architect: MEGA ARCH PLUS; Engineer: PRADEEP PARDE; Engineer: DARSH CONSULT; Engineer: Abu Sahma; Chartered Accountant: PRATIK VORA; Chartered Accountant: S.LAKDAWALA & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRECILLA CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRECILLA CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRECILLA CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.