Home / Browse projects / Nagpur, Maharashtra / PRAYAG PARADISE
PRAYAG PARADISE
RG-MH-22952 · RERA P50500047607 · Last updated on MahaRERA portal: 18 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 27 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PRAYAG PARADISE is a Others project by SHASHANK PANDE in Nagpur, Maharashtra, registered with MahaRERA as P50500047607 on 14 Nov 2022. Possession is promised by 31 Dec 2027. The completion date has moved by 27 months from the original filing. 12 of the 44 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NamePRAYAG PARADISE
- TypeOthers
- Location
- ASSOCIATED FRIENDS COLONY LAYOUT
- FRIENDS COLONY
- Borgaon Khu.
- Nagpur (Rural)
- Nagpur
- 440013
- Pincode440013
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50500047607
- ReraGenie IDRG-MH-22952
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on14 Nov 2022
- Promised completion31 Dec 2027
- Revised completionRevised to 31 Dec 2027 (originally 30 Sep 2025)
- Buildings1 building record
- Documents filed150 files
Current status
Figures as on 18 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PRAYAG PARADISE | NA | 9 | 8 | 22 | 22 | 44 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 18 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 96%.
PRAYAG PARADISE: 77% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 96% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 94% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 85% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 75% |
Progress on shared amenities15
As on 18 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 98% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 85% |
| Storm Water Drains | Yes | 96% |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 94% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 35% |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed125
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| ROOPCHAND WASWANI | Nagpur (M Corp.) | Nagpur |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PRAYAG PARADISE | NA | Rs 7.52 cr | Rs 7.52 cr |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | VIKAS PADOLE & ASSOCIATES |
| Engineer | VIKAS PADOLE & ASSOCIATES |
| Engineer | VIKAS PADOLE |
| Chartered Accountant | SAWALKAR AND BONDE |
| Chartered Accountant | G A D & ASSOCIATES |
| Chartered Accountant | SUMIT SANTOSH AGRAWAL & ASSOCIATES |
| Chartered Accountant | RATAN CHANDAK AND CO. LLP |
| Partner | Role in project |
|---|---|
| SHASHANK PANDE | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterTo The Secretary, Maharashtra Real Estate Regulatory Authority (MahaRERA), Housefin Bhavan, Bandra-Kurla Complex, Bandra (E), Mumbai - 400051. Subject: Application for Extension of Project Registration under Section 7(3) of the RERA Act, 2016 - PRAYAG PARADISE, MahaRERA Registration No. P50500047607. Respected Sir/Madam, We, PRAYAG DEVELOPERS & BUILDERS, Promoter of the project PRAYAG PARADISE (MahaRERA Registration No. P50500047607), located at 566/51/A, W NO. 62, CST NO. 679, SHEET NO. 132/44, KHASRA NO. 157/1,2, 59/1,2, 354/2 & 55, BORGAON KHU., NAGPUR (RURAL), NAGPUR - 440013, respectfully
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 18 Oct 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 Sep 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Apr 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Sep 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed150
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 150 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: FORM 1_PRAYAG PARADISE_MAR 2026.pdf | 18 Jul 2026 |
| Withdrawal Update Form 2File: FORM 2_PRAYAG PARADISE_MAR 2026.pdf | 18 Jul 2026 |
| Withdrawal Update Form 3File: FORM 3_PRAYAG PARADISE_MAR 2026.pdf | 18 Jul 2026 |
| Building plan approvalFile: REVISED BUILDING SANCTIONED PLAN.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1_PRAYAG PARADISE_MAR 2026.pdf | 25 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2_PRAYAG PARADISE_MAR 2026.pdf | 25 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3_PRAYAG PARADISE_MAR 2026.pdf | 25 Apr 2026 |
| Withdrawal Update Form 1File: FORM 1_PRAYAG PARADISE_MAR 2026.pdf | 21 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2_PRAYAG PARADISE_MAR 2026.pdf | 21 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3_PRAYAG PARADISE_MAR 2026.pdf | 21 Apr 2026 |
| Form 2A (FY 2025-2026)File: FORM 2A_PRAYAG PARADISE_MAR 2026.pdf | 21 Apr 2026 |
| Form 5 (FY 2025-2026)File: FORM 5 MARCH 2026.pdf | 21 Apr 2026 |
| Withdrawal Update Form 1File: FORM-1 DEC-25 PRAYAG PARADISE.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: FORM 2_PRAYAG PARADISE_DEC 2025.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: FORM 3 Prayag paradise december 2025.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: FORM-1 DEC-25 PRAYAG PARADISE.pdf | 19 Jan 2026 |
| Withdrawal Update Form 2File: FORM 2_PRAYAG PARADISE_DEC 2025.pdf | 19 Jan 2026 |
| Withdrawal Update Form 3File: FORM 3 Prayag paradise december 2025.pdf | 19 Jan 2026 |
| Withdrawal Update Form 1File: FORM-1.pdf | 20 Oct 2025 |
| Withdrawal Update Form 2File: FORM-2.pdf | 20 Oct 2025 |
| Withdrawal Update Form 3File: FORM-3.pdf | 20 Oct 2025 |
| Form 1File: FORM -1 DEC -2022.pdf | 20 Aug 2025 |
| Form 2File: FORM 2 -DEC -2022.pdf | 20 Aug 2025 |
| Form 3File: FORM -3- DEC -2022.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD-UNSOLD_DEC-22.pdf | 20 Aug 2025 |
| Form 1File: FORM 1 -MAR-2023.pdf | 20 Aug 2025 |
| Form 2File: FORM 2- MAR 2023.pdf | 20 Aug 2025 |
| Form 3File: FORM 3- MAR -2023.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD MAR-23.pdf | 20 Aug 2025 |
| Form 1File: FORM 1 -JUNE -2023.pdf | 20 Aug 2025 |
| Form 2File: FORM 2-JUNE -2023.pdf | 20 Aug 2025 |
| Form 3File: FORM-3_JUNE-2023.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD JUNE-23.pdf | 20 Aug 2025 |
| Form 1File: FORM - 1SEP -2023.pdf | 20 Aug 2025 |
| Form 2File: FORM 2 -SEP -2023.pdf | 20 Aug 2025 |
| Form 3File: FORM 3- SEP -2023.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD SEP-23.pdf | 20 Aug 2025 |
| Form 1File: FORM 1 -DEC 2023.pdf | 20 Aug 2025 |
| Form 2File: FORM 2- DEC -2023.pdf | 20 Aug 2025 |
| Form 3File: FORM 3- DEC 2023.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD DEC-23.pdf | 20 Aug 2025 |
| Form 1File: FORM 1 MAR-2024.pdf | 20 Aug 2025 |
| Form 2File: FORM 2 -MARCH -2024.pdf | 20 Aug 2025 |
| Form 3File: FORM 3- MAR 2024.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD MAR-24.pdf | 20 Aug 2025 |
| Form 1File: FORM 1 JUNE -2024.pdf | 20 Aug 2025 |
| Form 2File: FORM 2- JUNE-2024.pdf | 20 Aug 2025 |
| Form 3File: FORM 3- JUNE 2024.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD JUNE-24..pdf | 20 Aug 2025 |
| Form 1File: FORM -1 SEP -2024.pdf | 20 Aug 2025 |
| Form 2File: FORM 2 - SEP -2024.pdf | 20 Aug 2025 |
| Form 3File: FORM 3- SEP - 2024.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD SEP-24.pdf | 20 Aug 2025 |
| Form 1File: FORM -1 DEC -2024.pdf | 20 Aug 2025 |
| Form 2File: FORM 2- DEC -2024.pdf | 20 Aug 2025 |
| Form 3File: FORM 3 - DEC -2024.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD DEC-24.pdf | 20 Aug 2025 |
| Form 1File: FORM 1 -MAR -2025.pdf | 20 Aug 2025 |
| Form 2File: FORM 2- MAR -2025.pdf | 20 Aug 2025 |
| Form 3File: FORM-3 MAR-25.pdf | 20 Aug 2025 |
| Disclosure of Sold and Booked InventoryFile: SOLD & UNSOLD MAR-25.pdf | 20 Aug 2025 |
| Withdrawal Update Form 1File: FORM-1 JUNE-2025.pdf | 20 Aug 2025 |
| Withdrawal Update Form 1File: FORM-1 JUNE-2025.pdf | 20 Aug 2025 |
| Withdrawal Update Form 1File: FORM-1 JUNE-2025.pdf | 20 Aug 2025 |
| Withdrawal Update Form 1File: FORM-1 JUNE-2025.pdf | 20 Aug 2025 |
| Withdrawal Update Form 2File: FORM-2 JUN-25.pdf | 20 Aug 2025 |
| Withdrawal Update Form 2File: FORM-2 JUN-25.pdf | 20 Aug 2025 |
| Withdrawal Update Form 2File: FORM-2 JUN-25.pdf | 20 Aug 2025 |
| Withdrawal Update Form 2File: FORM-2 JUN-25.pdf | 20 Aug 2025 |
| Withdrawal Update Form 3File: FORM-3 JUN-25.pdf | 20 Aug 2025 |
| Withdrawal Update Form 3File: FORM-3 JUN-25.pdf | 20 Aug 2025 |
| Withdrawal Update Form 3File: FORM-3 JUN-25.pdf | 20 Aug 2025 |
| Withdrawal Update Form 3File: FORM-3 JUN-25.pdf | 20 Aug 2025 |
| Form 2A (FY 2022-2023)File: Form 2A March 2023.pdf | 20 Aug 2025 |
| Form 2A (FY 2023-2024)File: Form 2A March 2024.pdf | 20 Aug 2025 |
| Form 2A (FY 2024-2025)File: Form 2A March 2025.pdf | 20 Aug 2025 |
| Form 5 (FY 2024-2025)File: FORM-5 March 2025.pdf | 14 Aug 2025 |
| Form 1File: Form no-1.pdf | 1 Aug 2025 |
| Form 2File: Form no-2.pdf | 1 Aug 2025 |
| Form 3File: PRAYAG DEV FORM 3_JUNE 2025.pdf | 1 Aug 2025 |
Promoter's earlier projects4
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHANTI PRAYAG | LAXMI NAGAR | 18 | Completed | Jun 2015 | Late, Apr 2017 |
| SHRI DATTA PRAYAG | LAXMI NAGAR | 20 | Completed | Feb 2014 | Late, Jan 2015 |
| DIVYA PRAYAG | WANJARI NAGAR | 26 | Completed | Apr 2013 | Late, May 2015 |
| BHAKTI PRAYAG | LAXMI NAGAR | 15 | Completed | Feb 2011 | Late, Feb 2014 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Nagpur
Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.
Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 150 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PRAYAG PARADISE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near FRIENDS COLONY2,800+ in Nagpur
Filed coordinates, straight-line distance. 31 registered projects within 2 km.
MAHALAXMI NAGAR 39
MAHALAXMI AEDIFICATORS PRIVATE LIMITED
Naniks Ashtavinayak Bhakti-4
Bhawana Mahesh Sadhwani
Balaji Town
Surendra R Mahakalkar & 3 Others (Partner
RACHANA PURVA
Rachana Developers
OAK STERLING VISTA
OAK STERLING VISTA LLP
MB TOWN 4
MAHARANA AND BOSE ASSOCIATES
See every Nagpur project, with the district possession charts
Builder: SHASHANK PANDE
SHASHANK PANDE has 2 registrations on MahaRERA, including GALAXY PRAYAG and PRAYAG PARADISE. Its filings disclose 4 earlier MahaRERA projects: declares 0 of 4 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.
Frequently asked questions
What are my rights if PRAYAG PARADISE is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PRAYAG PARADISE?
The registered promoter entity is SHASHANK PANDE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PRAYAG PARADISE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PRAYAG PARADISE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PRAYAG PARADISE?
The professionals named in the filing: Architect: VIKAS PADOLE & ASSOCIATES; Engineer: VIKAS PADOLE & ASSOCIATES; Engineer: VIKAS PADOLE; Chartered Accountant: SAWALKAR AND BONDE; Chartered Accountant: G A D & ASSOCIATES; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PRAYAG PARADISE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback