PRATIK ANGAN

By PRATIK ABHIRUCHI

RG-MH-21867 · RERA P51500051773 · Last updated on MahaRERA portal: 27 Jun 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
30 of 44Construction stages doneacross 4 buildings; furthest along: Installation of Lifts, 95%
54 of 68Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 66 documents Report an error

PRATIK ANGAN is a Others project by PRATIK ABHIRUCHI in Aurangabad, Maharashtra, registered with MahaRERA as P51500051773 on 27 Jun 2023. Possession is promised by 31 Dec 2028. 14 of the 68 units on this registration are recorded sold or booked, and 30 of 44 construction stages are filed complete.

At a glance

Project

  • NamePRATIK ANGAN
  • TypeOthers
  • Location
    • GUT NO
    • 08/PART
    • NAKSHTRAWADI
    • AURANGABAD-431002.
    • NAKSHATRAWADI
    • AURANGABAD
    • Aurangabad (M Corp.)
    • Aurangabad
    • 431002
  • Pincode431002
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500051773
  • ReraGenie IDRG-MH-21867

Builder

  • NamePRATIK ABHIRUCHI
  • Entity typePartnership
  • PartnersRAM BABURAO JOGDAND, HEMANT PRATAPSINGH THAKUR, ASHWINI RAM JOGDAND, JYOTI RAM JOGDAND

Key dates

this monthRegisteredJun 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Jun 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • Buildings4 building records
  • Documents filed66 files

Current status

21%14 of 68 units booked
62.8%Work done, per cost certificate

Figures as on 27 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A Type Row HousesNA22707
B Type Row HousesNA11505
C Type Row HousesNA11505
D and E Type BuildingNA77401151

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 27 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

30 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Installation of Lifts, at 95%.

A Type Row Houses82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Type Row Houses82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
C Type Row Houses81%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.95%
D and E Type Building44%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure70%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.3%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes80%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes5%
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed85

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots85
Closed/Covered1
Open Space84
BuildingClosed/CoveredOpen SpaceTotal
A Type Row Houses145
D and E Type Building08080

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,300 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on12 Mar 2026
LandownerVillageDistrict
MEDHA SHYAMSUNDER NAIKAurangabad (M Corp.)Aurangabad
VIDYA SHYAMSUNDER NAIKGarkhedaAurangabad

Approvals and building plan

Sanctioning authoritychatrapati sambhajinagar municipal corporation
Permissible FSI5050.95
Proposed, not sanctioned5,051 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNEAR SWAMI SAMARTH KENDRA CL-8/62/02/12, CIDCO, AURANGABAD-431001
Estimated costRs 10.31 cr
Cost incurredRs 6.47 cr
Work done62.75%
BuildingWingEstimatedIncurred
D and E Type BuildingNARs 5.68 crRs 2.73 cr
-NARs 1.62 crRs 77.64 lakh
A Type Row HousesNARs 1.09 crRs 1.09 cr
B Type Row HousesNARs 1.00 crRs 1.00 cr
C Type Row HousesNARs 91.68 lakhRs 87.09 lakh

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectASHOK BALANDE
EngineerABHAY PATIL
Chartered AccountantYASH NAGAR
PartnerRole in project
PRATIK ABHIRUCHI-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jun 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 20 Apr 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed66

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 2025-26 Q4..pdf27 Jun 2026
Withdrawal Update Form 2File: Form 2 2025-26 Q3.pdf27 Jun 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q3 Sign.pdf27 Jun 2026
Withdrawal Update Form 1File: Form 1 2025-26 Q1.pdf12 Mar 2026
Withdrawal Update Form 1File: Form 1 2025-26 Q2.pdf12 Mar 2026
Withdrawal Update Form 1File: Form 1 2025-26 Q3.pdf12 Mar 2026
Withdrawal Update Form 2File: Form 2 2025-26 Q1.pdf12 Mar 2026
Withdrawal Update Form 2File: Form 2 2025-26 Q2.pdf12 Mar 2026
Withdrawal Update Form 2File: Form 2 2025-26 Q3.pdf12 Mar 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q1..pdf12 Mar 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q2 Sign.pdf12 Mar 2026
Withdrawal Update Form 3File: Form 3 2025-26 Q3 Sign.pdf12 Mar 2026
Disclosure of sold/ booked inventoryFile: sold unsold Q1.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold Q2.pdf26 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold Q3.pdf26 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q2.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q3.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 23-24 Q1.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 23-24 Q2.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 23-24 Q3.pdf28 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 23-24 Q4.pdf28 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 23-24 Signed.pdf28 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2023-24 Q1.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2023-24 Q2.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2023-24 Q3.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2023-24 Q4.pdf20 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 2024-25 Q1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2023-24 Q1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2023-24 Q2.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2023-24 Q3.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2023-24 Q4.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 2024-25 Q1.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosue of booked inventory 2023 Q1.pdf10 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosue of booked inventory 2023 Q2.pdf10 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosue of booked inventory 2023 Q3.pdf10 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosue of booked inventory 2024 Q4.pdf10 Jul 2024
Declaration about Commencement CertificateFile: Declaration abaout commencement certificate new.pdf13 Jun 2023
Layout approvalFile: Layout Plan.pdf5 Jun 2023
Building plan approvalFile: A Building.pdf5 Jun 2023
Building plan approvalFile: B Building.pdf5 Jun 2023
Building plan approvalFile: C Building.pdf5 Jun 2023
Building plan approvalFile: D and E Building.pdf5 Jun 2023
Building plan approvalFile: D and E.pdf5 Jun 2023
Building plan approvalFile: D and E 2.pdf5 Jun 2023
Copy of Layout Approval (in case of layout)File: Layout Plan.pdf5 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: A Building.pdf5 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: B Building.pdf5 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: C Building.pdf5 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: D and E Building.pdf5 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: D and E.pdf5 Jun 2023
Building Plan Approval / NA Order for plotted developmentFile: D and E 2.pdf5 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_.pdf5 Jun 2023
Disclosure of sold/ booked inventoryFile: Sold unsold 1.pdf30 May 2023
Declaration in FORM BFile: Form B Developer.pdf26 Apr 2023
Proforma of Agreement for saleFile: Final ATS.pdf26 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200266850168_For_Asset_Based_Search_24_04_2023_16_18_14_434.pdf25 Apr 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclouser.pdf25 Apr 2023
Proforma of Allotment letterFile: Allotment Letter_11zon.pdf25 Apr 2023
Copy of the legal title reportFile: legal title report 12_11zon.pdf24 Apr 2023
Details of encumbrances concerned to FinanceFile: certificate and encumbrances legal merged (1).pdf24 Apr 2023
Details of encumbrances concerned to LegalFile: certificate and encumbrances legal merged (1).pdf24 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: saperate bank account declaration 9.pdf24 Apr 2023
Deviation Report with respect to Allotment letterFile: deviation report with respect to allotment letter 5.pdf24 Apr 2023
Deviation Report with respect to model copy of AgreementFile: Deviation report with respect to the model copy of agreement 4.pdf24 Apr 2023
PAN CardFile: Firm Pan.pdf20 Apr 2023
Commencement Certificates / NA Order for plotted developmentFile: Revised Commencment.pdf20 Apr 2023

How this compares with Aurangabad

21%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one has not
32%of Aurangabad registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep PRATIK ANGAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near NAKSHATRAWADI, AURANGABAD1,400+ in Aurangabad

2 kmPRATIK ANGANCompleted 4Lapsed / revoked 7Other 12Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: PRATIK ABHIRUCHI

PRATIK ABHIRUCHI has 1 registration on MahaRERA, including PRATIK ANGAN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if PRATIK ANGAN is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRATIK ANGAN?

The registered promoter entity is PRATIK ABHIRUCHI, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRATIK ANGAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRATIK ANGAN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRATIK ANGAN?

The professionals named in the filing: Architect: ASHOK BALANDE; Engineer: ABHAY PATIL; Chartered Accountant: YASH NAGAR. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRATIK ANGAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRATIK ANGAN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRATIK ANGAN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.