Completed No litigation declared Residential / Group Housing project

PRAMUKH VIVANTA

By PRAMUKH DEVELOPERS

RG-MH-63447 · RERA P52100047542 · Last updated on MahaRERA portal: 11 Nov 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 9 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2025Possession promisedregistration recorded completed
8 of 8Construction stages doneevery applicable stage filed complete
25 of 38Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 98 documents Report an error

PRAMUKH VIVANTA is a Residential / Group Housing project by PRAMUKH DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100047542 on 9 Nov 2022. The registration is recorded completed; possession was promised by 30 Sep 2025. The completion date has moved by 9 months from the original filing. 13 of the 38 units on this registration are recorded sold or booked, and 8 of 8 construction stages are filed complete.

At a glance

Project

  • NamePRAMUKH VIVANTA
  • TypeResidential / Group Housing
  • Location
    • -
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • RERA no.P52100047542
  • ReraGenie IDRG-MH-63447

Builder

  • NamePRAMUKH DEVELOPERS
  • Entity typePartnership
  • PartnersSANJAY TULSHIBHAI RATHOD, TULSHIBHAI MOHANBHAI RATHOD, PRABHUDAS HARIBHAI JADAV, VALLABHBHAI DHARAMSHIBHAI SAPARIYA, MANASUKH LALAJI MANANI, DEVSIBHAI MOHANBHAI RATHOD, DHIRAJLAL MOHANBHAI RATHOD, BHAVESH VASANT MANANI, KHIMJIBHAI MOHANBHAI RATHOD
  • Other registrations11 more →
  • Completed5 of 12
  • Past their filed date1
  • Declared earlier projects4 →

Key dates

this monthRegisteredNov 2022First promiseDec 2024Revised toSep 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Nov 2022
  • Promised completion30 Sep 2025
  • Revised completionRevised to 30 Sep 2025 (originally 31 Dec 2024)
  • Buildings1 building record
  • Documents filed98 files

Current status

34%13 of 38 units booked
72.7%Work done, per cost certificate

Figures as on 11 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRAMUKH VIVANTANA7738038

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 11 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 8 construction stages are filed complete.

PRAMUKH VIVANTA: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 11 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingNoNot applicable

Parking filed115

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots115
Closed/Covered38
Open Space77

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,027 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI12344.74
Proposed, not sanctioned3,263 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGANESH NAGAR CHINTAMANI ENCLAVE SAMARATH PATH NEAR SUVARANAREKHA AUTO PUNE 411052
Estimated costRs 10.09 cr
Cost incurredRs 7.34 cr
Work done72.72%
BuildingWingEstimatedIncurred
PRAMUKH VIVANTANARs 8.78 crRs 7.17 cr
-NARs 1.31 crRs 16.77 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHAILESH PATIL
EngineerBHAVESH MANANI
EngineerSUHASH JOSHI
EngineerRUDAYKUMAR ANDHARE
Chartered AccountantP B SHAH
Chartered AccountantRUSHABH JAIN
PartnerRole in project
PRAMUKH DEVELOPERS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025469Dec 2024 → Sep 2025

Reason as filed by the promoterDue to unavailability of material and laborers on time, the promoter was unable to complete the project on 31.12.2024.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed98

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 98 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: C C Dated 19 sept 2025.pdf11 Nov 2025
Occupational CertificateFile: RECORD PLAN 1 (1).pdf11 Nov 2025
Occupational CertificateFile: RECORD PLAN 2 (1).pdf11 Nov 2025
Occupational CertificateFile: O C.pdf30 Oct 2025
Occupational CertificateFile: OC Verification Pramukh Vivanta.pdf30 Oct 2025
Occupational CertificateFile: Form 4 Pramukh Vivanta.pdf30 Oct 2025
Withdrawal Update Form 1File: FORM -1 (1).pdf17 Oct 2025
Withdrawal Update Form 2File: FORM 2 (30-9-25).pdf17 Oct 2025
Withdrawal Update Form 3File: FORM 3 (9).pdf17 Oct 2025
Withdrawal Update Form 1File: FORM -1 (1).pdf14 Oct 2025
Withdrawal Update Form 2File: FORM 2 (30-9-25).pdf14 Oct 2025
Withdrawal Update Form 3File: FORM 3 (9).pdf14 Oct 2025
Withdrawal Update Form 1File: FORM 1 (NEW FORMAT).pdf8 Oct 2025
Withdrawal Update Form 2File: FORM 2 (NEW FORMAT).pdf8 Oct 2025
Withdrawal Update Form 3File: FORM -3 (NEW FORMAT).pdf8 Oct 2025
Withdrawal Update Form 1File: FORM 1 (NEW FORMAT).pdf4 Oct 2025
Withdrawal Update Form 2File: FORM 2 (NEW FORMAT).pdf4 Oct 2025
Withdrawal Update Form 3File: FORM -3 (NEW FORMAT).pdf4 Oct 2025
Form 2A (FY 2024-2025)File: FORM 2A 2024-25.pdf17 Sep 2025
Form 5 (FY 2024-2025)File: Form 5 2024-25.pdf16 Sep 2025
Withdrawal Update Form 1File: FORM 1 (NEW FORMAT).pdf18 Jul 2025
Withdrawal Update Form 2File: FORM 2 (NEW FORMAT).pdf18 Jul 2025
Withdrawal Update Form 3File: FORM -3 (NEW FORMAT).pdf18 Jul 2025
Form 1File: FORM -1 (1).pdf17 Jul 2025
Form 2File: FORM -2.pdf17 Jul 2025
Form 3File: FORM -3.pdf17 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD (1).pdf17 Jul 2025
Withdrawal Update Form 1File: FORM 1 (NEW FORMAT).pdf17 Jul 2025
Withdrawal Update Form 2File: FORM 2 (NEW FORMAT).pdf17 Jul 2025
Withdrawal Update Form 3File: FORM -3 (NEW FORMAT).pdf17 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2.pdf15 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 UPDATE ND UPLODED.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD dec.pdf10 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 dec.pdf9 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 dec.pdf9 Jan 2025
Declaration in FORM BFile: FORM B_compressed.pdf12 Dec 2024
Disclosure of sold/ booked inventoryFile: Adobe Scan 12-Dec-2024 (7).pdf12 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 SEP DONE.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 SEP.pdf17 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Pramukh Vivanta form 2A.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 SEP.pdf14 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNITS.pdf10 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM -1 (30-6-24).pdf15 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM -2 (30-6-24).pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD (31-3-24).pdf15 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD -UNSOLD (30-6-24).pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 (31-3-24)_compressed.pdf15 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM -3 (30-6-24)_compressed (1).pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf26 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BHAVESH MANANI_compressed.pdf24 Apr 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: ilovepdf_merged.pdf23 Feb 2024
Disclosure of sold/ booked inventoryFile: 31-3-23.pdf16 Feb 2024
Disclosure of sold/ booked inventoryFile: 30-6-23.pdf16 Feb 2024
Disclosure of sold/ booked inventoryFile: 30-9-23.pdf16 Feb 2024
Disclosure of sold/ booked inventoryFile: 31-12-23.pdf16 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form B (5).pdf27 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1-3.pdf8 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2-3.pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ilovepdf_merged (31)_compressed.pdf18 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1-.pdf6 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2-2.pdf6 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Annual Report 2022-23.pdf11 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate 30-06-2023.pdf11 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 30-06-2023_compressed.pdf11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 30-06-2023_compressed.pdf11 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 30-06-2023 Final Copy.pdf11 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect certificate 30-06-2023.pdf5 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate 30-06-2023.pdf5 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate 30-06-2023.pdf5 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate.pdf17 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1.pdf8 Apr 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2.pdf8 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Form 3.pdf8 Apr 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold- unsold inventory details.pdf21 Mar 2023
Proforma of Agreement for saleFile: Agreement for sale_merged.pdf15 Sep 2022
Proforma of Allotment letterFile: Deviation report of allotment letter-2-11.pdf15 Sep 2022

How this compares with Pune

34%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 9 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRAMUKH VIVANTA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

Builder: PRAMUKH DEVELOPERS

PRAMUKH DEVELOPERS has 12 registrations on MahaRERA, including PRAMUKH PARADISE and PRAMUKH NARAYAN. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if PRAMUKH VIVANTA is delayed beyond 30 Sep 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRAMUKH VIVANTA?

The registered promoter entity is PRAMUKH DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRAMUKH VIVANTA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRAMUKH VIVANTA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRAMUKH VIVANTA?

The professionals named in the filing: Architect: SHAILESH PATIL; Engineer: BHAVESH MANANI; Engineer: SUHASH JOSHI; Engineer: RUDAYKUMAR ANDHARE; Chartered Accountant: P B SHAH; Chartered Accountant: RUSHABH JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRAMUKH VIVANTA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRAMUKH VIVANTA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRAMUKH VIVANTA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.