ReraGenieLog inGet a buyer report

Home / Browse projects / Mumbai Suburban, Maharashtra / Pramukh Krupa Phase Two

Registered No litigation declared Residential / Group Housing project

Pramukh Krupa Phase Two

By Pinal Realty LLP

RG-MH-05261 · RERA P51800050490 · Last updated on MahaRERA portal: 18 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
4 of 11Construction stages donefurthest along: Slabs of Super Structure, 60%
57 of 97Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 109 documents Report an error

Pramukh Krupa Phase Two is a Residential / Group Housing project by Pinal Realty LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050490 on 17 Apr 2023. Possession is promised by 31 Mar 2027. 40 of the 97 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NamePramukh Krupa Phase Two
  • TypeResidential / Group Housing
  • Location
    • Junction of M G Road and Ganesh Gawade Road
    • Mulund West
    • Mumbai
    • Mulund
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800050490
  • ReraGenie IDRG-MH-05261

Builder

  • NamePinal Realty LLP
  • Entity typePartnership
  • LLPINAAF-9449
  • GSTIN27AASFP4084H2ZO
  • LLPIN and GSTIN are from this promoter's other MahaRERA registrations. This project's own filing does not repeat them.
  • PartnersRomil Jayesh Doshi, Jayesh Anantrai Doshi
  • Other registrations5 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2023PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Apr 2023
  • Promised completion31 Mar 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed109 files

Current status

41%40 of 97 units booked

Figures as on 18 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing A and B - ResidentialNA272197097

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 60%.

Wing A and B - Residential: 45% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor0%
Slabs of Super Structure60%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises30%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed94

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots94
Closed/Covered94

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,666 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on9 Jul 2026
LandownerVillageDistrict
Smt Shaila Kiran DoshiGhatkoparMumbai Suburban
Smt Mona Sanjay PatelGhatkoparMumbai Suburban

Approvals and building plan

Sanctioning authoritySLUM REHABILITATION AUTHORITY
Permissible FSI6049.78
Proposed, not sanctioned3,800 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No -4 Runwal Anthurium Retail Old Gabrial Factory LBS Marg In Front of Veena Nagar Mulund West

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRadius Architects
EngineerS K Consultants & Engineers
Chartered AccountantVikas Abhang & Associates
Chartered AccountantN B Sayed & Associates
PartnerRole in project
Pinal Realty LLP-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 17 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Jan 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 12 May 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed109

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 109 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Form 1 - Pramukh Krupa Phase Two as on March 2026.pdf18 Apr 2026
Form 2File: Form 2 - Pramukh Krupa Phase Two as on March 2026.pdf18 Apr 2026
Form 3File: Form 3 - Pramukh Krupa Phase Two as on March 2026.pdf18 Apr 2026
Disclosure of Sold and Booked InventoryFile: Circular 29 - Pramukh Krupa Phase Two as on March 2026.pdf18 Apr 2026
Form 1File: Form 1 - Pramukh Krupa Phase Two as on Dec 2025.pdf20 Jan 2026
Form 2File: Form 2 - Pramukh Krupa Phase Two as on Dec 2025.pdf20 Jan 2026
Form 3File: Form 3 - Pramukh Krupa Phase Two as on Dec 2025.pdf20 Jan 2026
Disclosure of Sold and Booked InventoryFile: Circular 29.pdf20 Jan 2026
Form 1File: Form 1 - Pramukh Krupa Phase Two as on Sep 2025.pdf14 Oct 2025
Form 2File: Form 2 - Pramukh Krupa Phase Two as on Sep 2025.pdf14 Oct 2025
Form 3File: Form 3 - Pramukh Krupa Phase Two as on Sep 2025.pdf14 Oct 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Pramukh Krupa Phase Two as on Sep 2025.pdf14 Oct 2025
Form 1File: Form 1 - Pramukh Krupa Phase Two on June 2025.pdf6 Sep 2025
Form 2File: Form 2 - Pramukh Krupa Phase Two as on June 2025.pdf6 Sep 2025
Form 3File: Form 3 - Pramukh Krupa Phase Two as on June 2025.pdf6 Sep 2025
Disclosure of Sold and Booked InventoryFile: Circular 29 - Pramukh Krupa Phase Two on June 2025.pdf6 Sep 2025
Commencement Certificates / NA Order for plotted developmentFile: PRAMUKH KRUPA CC 16TH UPPER FLOOR.pdf12 May 2025
Commencement Certificates / NA Order for plotted developmentFile: PRAMUKH KRUPA CC 16TH UPPER FLOOR.pdf8 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pramukh Krupa Phase Two as on March 2025.pdf15 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pramukh Krupa Phase Two as on Dec 2024 Signed.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pramukh Krupa Phase Two as on March 2025.pdf15 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pramukh Krupa Phase Two as on Dec 2024 Signed.pdf15 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pramukh Krupa Phase Two as on March 2025.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pramukh Krupa Phase Two as on Dec 2024.pdf9 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 2024 Pramukh Krupa Phase Two_compressed.pdf6 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Dec 2024 Pramukh Krupa Phase Two.pdf6 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Phase Two.pdf6 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Phase Two.pdf6 Mar 2025
Disclosure of sold/ booked inventoryFile: Circular 29 - Pramukh Krupa Phase Two - Dec 24.pdf6 Mar 2025
Declaration about Commencement CertificateFile: Format D Phase Two.pdf6 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Phase Two.pdf6 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Phase Two.pdf6 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A 2023-24 Pramukh Krupa Phase Two.pdf5 Mar 2025
Layout approvalFile: 1.pdf13 Jan 2025
Copy of Layout Approval (in case of layout)File: 1.pdf13 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pramukh Krupa Phase Two as on Dec 2024.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pramukh Krupa Phase Two as on Dec 2024.pdf13 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pramukh Krupa Phase Two as on Sept 2024.pdf9 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Pramukh Krupa Phase Two for FY 2023-24.pdf21 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Pramukh Krupa Phase Two for FY 2023-24.pdf21 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Pramukh Krupa Phase Two Sep 2024 (1).pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pramukh Krupa Phase Two as on Sept 2024.pdf13 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 of Pramukh Krupa Phase Two as on 20-09-2024.pdf13 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pramukh Krupa Phase Two as on Sept 2024.pdf13 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pramukh Krupa Phase Two as on Sept 2024.pdf13 Oct 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 PRAMUKH KRUPA PHASE TWO.pdf24 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pramukh Krupa Phase Two as on June 2024 (1).pdf13 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pramukh Krupa Phase Two as on June 2024.pdf10 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3 of Pramukh Krupa Phase Two as on 30th June 24 Final.pdf10 Jul 2024
Home Buyer /Allottee Grievance Redressal CellFile: Declaration of Allottee Grievance Redressal Cell Pramukh Krupa Phase Two.pdf27 Jun 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 PRAMUKH KRUPA PHASE TWO.pdf24 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Pramukh Krupa Phase Two as on 31st March 24.pdf13 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pramukh Krupa Phase Two as on March 2024.pdf12 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 of Pramukh Krupa Phase Two as on 31st March 24.pdf12 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pramukh Krupa Phase Two as on March 2024.pdf10 Apr 2024
Disclosure of sold/ booked inventoryFile: CIRCULAR 29 PRAMUKH KRUPA PHASE TWO.pdf15 Mar 2024
Layout approvalFile: approval.pdf12 Mar 2024
Building plan approvalFile: 1_2_3_4_merged.pdf12 Mar 2024
Building plan approvalFile: 5_6_7_merged.pdf12 Mar 2024
Building plan approvalFile: 8.pdf12 Mar 2024
Copy of Layout Approval (in case of layout)File: approval.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 1_2_3_4_merged.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 5_6_7_merged.pdf12 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 8.pdf12 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: MULUND CC.pdf11 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pramukh Krupa Phase Two as on June 2023_compressed.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pramukh Krupa Phase Two as on Sep 2023_compressed.pdf1 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pramukh Krupa Phase Two as on Dec 2023_compressed.pdf1 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pramukh Krupa Phase Two as on June 2023.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pramukh Krupa Phase Two as on Sept 2023.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pramukh Krupa Phase Two as on Dec 2023.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pramukh Krupa Phase Two as on June 2023_compressed.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pramukh Krupa Phase Two as on Sep 2023_compressed.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Pramukh Krupa Phase Two as on Dec 2023_compressed.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pramukh Krupa PHASE TWO as on June 2023.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1- Pramukh Krupa PHASE TWO as on September 2023.pdf18 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Pramukh Krupa PH 2 as on Dec 2023.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pramukh Krupa Phase Two as on June 2023.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pramukh Krupa Phase Two as on Sept 2023.pdf18 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Pramukh Krupa Phase Two as on Dec 2023.pdf18 Jan 2024

How this compares with Mumbai Suburban

41%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Pramukh Krupa Phase Two on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund West, Mumbai6,700+ in Mumbai Suburban

2 kmPramukh Krupa Phase TwoCompleted 112Lapsed / revoked 95Other 141Dot size: filed unitsN

Filed coordinates, straight-line distance. 348 registered projects within 2 km.

Builder: Pinal Realty LLP

Pinal Realty LLP has 6 registrations on MahaRERA, including Shree Pinal Project A and Pramukh Krupa Phase Two. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Pramukh Krupa Phase Two is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Pramukh Krupa Phase Two?

The registered promoter entity is Pinal Realty LLP, a partnership as per the filing. Its LLPIN AAF-9449 and GSTIN 27AASFP4084H2ZO can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Pramukh Krupa Phase Two?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Pramukh Krupa Phase Two?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Pramukh Krupa Phase Two?

The professionals named in the filing: Architect: Radius Architects; Engineer: S K Consultants & Engineers; Chartered Accountant: Vikas Abhang & Associates; Chartered Accountant: N B Sayed & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Pramukh Krupa Phase Two?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Pramukh Krupa Phase Two. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Pramukh Krupa Phase Two to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.