ReraGenieLog inGet a buyer report

Home / Browse projects / PRAMAN SPLENDOUR

Completed No litigation declared Residential / Group Housing project

PRAMAN SPLENDOUR

By Shreepati Splendour

RG-MH-09785 · RERA P51900004811 · Last updated on MahaRERA portal: 23 Apr 2021

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: .
Dec 2019Possession promisedregistration recorded completed
10 of 11Construction stages donefurthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 74 documents Report an error

PRAMAN SPLENDOUR is a Residential / Group Housing project by Shreepati Splendour in 400014, registered with MahaRERA as P51900004811 on 9 Aug 2017. The registration is recorded completed; possession was promised by 31 Dec 2019.

At a glance

Project

  • NamePRAMAN SPLENDOUR
  • TypeResidential / Group Housing
  • Location
    • 400014
  • Pincode400014
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900004811
  • ReraGenie IDRG-MH-09785

Builder

  • NameShreepati Splendour
  • Entity typeOthers
  • Named personsPRAMAN INFRASTRUCTURES PVT LTD, MEERA KOTHARI
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2017PromisedDec 2019Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on9 Aug 2017
  • Promised completion31 Dec 2019
  • Revised completionNone
  • Buildings1 building record
  • Documents filed74 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRAMAN SPLENDOURNA230000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 23 Apr 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Podiums (if any), at 0%.

PRAMAN SPLENDOUR: 91% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 23 Apr 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed31

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots31
Closed/Covered30
Open Space1

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area718 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI3309.15
Proposed, not sanctioned2,486 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHABA BUILDING TARDEO ROAD MUMBAI 400 007

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMitesh Gadhiya
PartnerRole in project
Shreepati Splendour-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 27 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 24 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 22 Apr 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Dec 2017Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 8 Aug 2019

Documents filed74

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: praman splendour c h s l certificate.pdf23 Apr 2021
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC:BCC Certifcate MATUNGA.pdf8 Aug 2019
Certificates of Architect (Form 4)File: form 4 Splendour RERA.pdf26 Apr 2019
Building plan approvalFile: MATUNGA OC approved plans.pdf22 Apr 2019
Building Plan Approval (IOD)File: MATUNGA OC approved plans.pdf22 Apr 2019
OtherFile: OCC:BCC Certifcate MATUNGA.pdf22 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate SS march19.pdf14 Apr 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate SS March2019.pdf14 Apr 2019
Certificates of CA (Form 3)File: CA certificate SS March 2019.pdf14 Apr 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects Certificate splendour dec18.pdf15 Jan 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate splendour dec18.pdf15 Jan 2019
Certificates of CA (Form 3)File: CA Certificate - SS - 31-12-18-compressed.pdf15 Jan 2019
Certificates of CA (Form 3)File: Praman Splendour - Rera Certificate CA - 30-09-18.pdf30 Oct 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: splendour architect certificate sept18_20181011171048.pdf11 Oct 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: splendour engg certificate sept18_20181011171114.pdf11 Oct 2018
Certificates of CA (Form 5)File: SHREEPATI SPLENDOR.pdf11 Oct 2018
Details of encumbrancesFile: splendour encumbrances certificate vistra.pdf21 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE DEC2017.pdf17 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE MARCH 2018.pdf17 Jul 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE June2018.pdf17 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE DEC2017.pdf17 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE MARCH2018.pdf17 Jul 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE JUNE2018.pdf17 Jul 2018
Certificates of CA (Form 3)File: CA CERTIFICATE DEC2017.pdf17 Jul 2018
Certificates of CA (Form 3)File: CA CERTIFICATE MARCH18.pdf17 Jul 2018
Certificates of CA (Form 3)File: CA CERTIFICATE June 2018.pdf17 Jul 2018
OtherFile: splendour side plaster.pdf30 Apr 2018
OtherFile: splendour front plaster.pdf30 Apr 2018
OtherFile: matunga OHT watertank.pdf30 Apr 2018
Status of Formation of Legal Entity (Society/Co Op etc.)File: praman Splendour society letter_20180330181123.pdf30 Mar 2018
Proforma of Allotment letterFile: Matunga - Agreement for sale.pdf20 Mar 2018
OtherFile: splendour front.pdf20 Mar 2018
OtherFile: splendour rear.pdf20 Mar 2018
OtherFile: Splendour side1.pdf20 Mar 2018
Building plan approvalFile: splendour approved plan full cc sheet 1.pdf6 Dec 2017
Building plan approvalFile: splendour approved plan full cc sheet 2.pdf6 Dec 2017
Building plan approvalFile: splendour approved plans full cc sheet 3.pdf6 Dec 2017
Building plan approvalFile: splendour approved plans full cc sheet 4.pdf6 Dec 2017
Building Plan Approval (IOD)File: splendour approved plan full cc sheet 1.pdf6 Dec 2017
Building Plan Approval (IOD)File: splendour approved plan full cc sheet 2.pdf6 Dec 2017
Building Plan Approval (IOD)File: splendour approved plans full cc sheet 3.pdf6 Dec 2017
Building Plan Approval (IOD)File: splendour approved plans full cc sheet 4.pdf6 Dec 2017
Commencement Certificates / NA Order for plotted developmentFile: splendour full cc dec2017.pdf6 Dec 2017
Proforma of Allotment letterFile: final Letter of allottment splendour.pdf6 Dec 2017
OtherFile: splendour frnt plaster.pdf18 Oct 2017
OtherFile: splendour photos 14 flr_20171011221555.pdf11 Oct 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certificate Matungafinal.pdf29 Jul 2017
Certificates of CA (Form 3)File: Praman Splendour CA Certificate Form 3.pdf29 Jul 2017
Proforma of Allotment letterFile: Praman Splendour - Final Document As per RERA.pdf29 Jul 2017
Building plan approvalFile: 15TH 16TH FLOOR PLAN MATUNGA.pdf27 Jul 2017
Building plan approvalFile: 17TH FLOOR PLAN MATUNGA.pdf27 Jul 2017
Building plan approvalFile: 18TH FLOOR PLAN MATUNGA.pdf27 Jul 2017
Building plan approvalFile: SECTION MATUNGA.pdf27 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE - MATUNGA 1 to 3.pdf27 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE - MATUNGA_4.pdf27 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE - MATUNGA_5.pdf27 Jul 2017
Copy of the legal title reportFile: TITLE CERTIFICATE - MATUNGA 6 to 8.pdf27 Jul 2017
Building Plan Approval (IOD)File: 15TH 16TH FLOOR PLAN MATUNGA.pdf27 Jul 2017
Building Plan Approval (IOD)File: 17TH FLOOR PLAN MATUNGA.pdf27 Jul 2017
Building Plan Approval (IOD)File: 18TH FLOOR PLAN MATUNGA.pdf27 Jul 2017
Building Plan Approval (IOD)File: SECTION MATUNGA.pdf27 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: architect's certificate matunga.pdf26 Jul 2017
Details of encumbrancesFile: encumbrancea certificate splendour.pdf25 Jul 2017
Declaration in FORM BFile: Form B Matunga.pdf25 Jul 2017
Building plan approvalFile: IOD pg 1 to 6.pdf24 Jul 2017
Building plan approvalFile: IOD PG 7 TO 12.pdf24 Jul 2017
Building plan approvalFile: APPROVED IOD PLANS.pdf24 Jul 2017
Layout approvalFile: location pdf.pdf24 Jul 2017
PAN CardFile: pan card.pdf24 Jul 2017
Copy of Layout Approval (in case of layout)File: location pdf.pdf24 Jul 2017
Building Plan Approval (IOD)File: IOD pg 1 to 6.pdf24 Jul 2017
Building Plan Approval (IOD)File: IOD PG 7 TO 12.pdf24 Jul 2017
Building Plan Approval (IOD)File: APPROVED IOD PLANS.pdf24 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: CC MATUNGA.pdf24 Jul 2017

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
Praman HeritageSicka Nagar next to Modern School V.P.Road Mumbai 40000436CompletedDec 2019Nov 2018
PRAMAN HEIGHTSC.S. NO. 2046 OFF J.S.S. ROAD ZAOBAWADI MUMBAI 400002105CompletedNov 2016Late, Apr 2017
PRAMAN RESIDENCYC.S.NO.468 APPA SHASTRI SATHE MARG NEXT TO V.P. ROAD POLICE STATION GIRGAON MUMBAI 40000429CompletedJan 2015Jan 2015

Keep PRAMAN SPLENDOUR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near this project

2 kmPRAMAN SPLENDOURCompleted 17Lapsed / revoked 11Other 27Dot size: filed unitsN

Filed coordinates, straight-line distance. 55 registered projects within 2 km.

Builder: Shreepati Splendour

Shreepati Splendour has 1 registration on MahaRERA, including PRAMAN SPLENDOUR. Its filings disclose 3 earlier MahaRERA projects: declares 2 of 3 past projects completed on time. Read the full track record.

Frequently asked questions

What are my rights if PRAMAN SPLENDOUR is delayed beyond 31 Dec 2019?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRAMAN SPLENDOUR?

The registered promoter entity is Shreepati Splendour, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRAMAN SPLENDOUR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRAMAN SPLENDOUR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRAMAN SPLENDOUR?

The professionals named in the filing: Architect: Mitesh Gadhiya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRAMAN SPLENDOUR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRAMAN SPLENDOUR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRAMAN SPLENDOUR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.