Prakash Pratima
RG-MH-12737 · RERA P51700022999 · Last updated on MahaRERA portal: 21 Dec 2024
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration and every project registered within 2 km.
See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Prakash Pratima is a Others project by Anant Developers in Thane, Maharashtra, registered with MahaRERA as P51700022999 on 11 Nov 2019. The registration is recorded completed; possession was promised by 30 Dec 2023.
At a glance
Project
- NamePrakash Pratima
- TypeOthers
- Location
- MAHATMA PHULE ROAD
- GARIBACHA WADA
- DOMBIVLI
- Kalyan
- Thane
- 421202
- Pincode421202
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51700022999
- ReraGenie IDRG-MH-12737
Builder
- NameAnant Developers
- Entity typePartnership
- PartnersSANTOSH ANANT BHOIR, POORNIMA SANTOSH BHOIR, NITESH ANANT BHOIR, PARAG PRAKASH VARDAM, SUDHISH KAILASH NAWAL, CHINMAY GAJANAN VYAPARI, DAYANAND TULSHIRAM KIRATKAR, BABLI DATTATRAY CHAVAN
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on11 Nov 2019
- Promised completion30 Dec 2023
- Revised completionNone
- Buildings1 building record
- Documents filed60 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Prakash Pratima | NA | 20 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 21 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 70%.
Prakash Pratima: 44% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 70% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 10% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities16
As on 21 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| Society Office Common enterance lobby common toilet and refuge area | Yes | 0% |
Land and ownership6
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| DATTATRAY RAKAMAJI GHAG | DOMBIVLI | Thane |
| NITESH ANANT BHOIR | DOMBIVLI | Thane |
| SANTOSH ANANT BHOIR | DOMBIVLI | Thane |
| SUDHAKAR TUKARAM BHOIR | DOMBIVLI | Thane |
| SURESH SAKHARAM BHOIR | DOMBIVLI | Thane |
| KIRAN ANANT BHOIR | DOMBIVLI | Thane |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | TIBIN TONSON THOMAS |
| Engineer | MANOHAR VISHNU PATIL |
| Chartered Accountant | SONALI SUNIL MHATRE |
| Chartered Accountant | SWAPNIL SURESH VARDAM |
| Partner | Role in project |
|---|---|
| Anant Developers | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 2 Oct 2019 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Feb 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 24 Feb 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Feb 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 26 Oct 2023
Documents filed60
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 Anant Developers.pdf | 21 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form No 5 Anant Developers.pdf | 7 Nov 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC certificate.pdf | 26 Oct 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Cert.pdf | 26 Oct 2023 |
| Layout approvalFile: Plan 1.pdf | 24 Feb 2023 |
| Building plan approvalFile: Plan 2.pdf | 24 Feb 2023 |
| Copy of Layout Approval (in case of layout)File: Plan 1.pdf | 24 Feb 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Plan 2.pdf | 24 Feb 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: scan20220205_16291029_347.pdf | 24 Feb 2023 |
| Declaration about Commencement CertificateFile: Declaration about Commencement Certificate.pdf | 24 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 02 Anant Dev Arch Cert 31122021.pdf | 11 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 03 Anant Dev Arch Cert 31032022.pdf | 11 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 04 Anant Dev Arch Cert 30062022.pdf | 11 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 05 Anant Dev Arch Cert 30092022.pdf | 11 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 06 Anant Dev Arch Cert 31122022.pdf | 11 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 01 Anant Dev Arch Cert 21122021.pdf | 11 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 02 Anant Dev Engg Cert 31122021.pdf | 11 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 03 Anant Dev Engg Cert 31032022.pdf | 11 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 04 Anant Dev Engg Cert 30062022.pdf | 11 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 05 Anant Dev Engg Cert 30092022.pdf | 11 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 06 Anant Dev Engg Cert 31122022.pdf | 11 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 21122021_compressed.pdf | 11 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2021_compressed.pdf | 11 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Mar 2022_compressed.pdf | 11 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Jun 2022_compressed.pdf | 11 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Sep 2022_compressed.pdf | 11 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Dec 2022_compressed.pdf | 11 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Anant Developers FY 2021 22 Form No5.pdf | 18 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Rera Audit Form No 5 FY 202021.pdf | 24 Sep 2022 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_Final_June 2021_compressed.pdf | 2 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form No 5 RERA Audit.pdf | 2 Oct 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_CA Certificate_June 2021_compressed.pdf | 31 Aug 2021 |
| Declaration about Commencement CertificateFile: Declearation about Commencement Certificate.pdf | 14 Aug 2021 |
| Layout approvalFile: plan01_C1_compressed.pdf | 12 Aug 2021 |
| Building plan approvalFile: plan02-compressed_compressed.pdf | 12 Aug 2021 |
| Copy of Layout Approval (in case of layout)File: plan01_C1_compressed.pdf | 12 Aug 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: plan02-compressed_compressed.pdf | 12 Aug 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Revised CC doc_compressed.pdf | 12 Aug 2021 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_Architect Certificate_compressed.pdf | 12 Aug 2021 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_Engineer Certificate_compressed.pdf | 12 Aug 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form 2A_Final_June 2021_compressed.pdf | 12 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory of Flat as on 30062021.pdf | 12 Aug 2021 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory of Flat as on 31072021.pdf | 12 Aug 2021 |
| Proforma of Allotment letterFile: Allotment Letter final.pdf | 16 Oct 2019 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer Certificate compressed.pdf | 5 Oct 2019 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA Certificate compressed.pdf | 5 Oct 2019 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architech Certificate compressed.pdf | 4 Oct 2019 |
| Proforma of Allotment letterFile: Agreement for Sale.pdf | 4 Oct 2019 |
| Layout approvalFile: MYSCAN_२०१९०९३०_0018.pdf | 2 Oct 2019 |
| Building plan approvalFile: MYSCAN_२०१९०९३०_0019.pdf | 2 Oct 2019 |
| PAN CardFile: PAN Card Firm.pdf | 2 Oct 2019 |
| Copy of the legal title reportFile: Survey No 29 Hissa No 11 compressed.pdf | 2 Oct 2019 |
| Copy of the legal title reportFile: Survey No 29 Hissa No 12 compressed.pdf | 2 Oct 2019 |
| Copy of the legal title reportFile: Survey No 31 Hissa No 26.pdf | 2 Oct 2019 |
| Copy of the legal title reportFile: Survey No 31 Hissa No 27.pdf | 2 Oct 2019 |
| Details of encumbrancesFile: No Encrumbance Certificate.pdf | 2 Oct 2019 |
| Copy of Layout Approval (in case of layout)File: MYSCAN_२०१९०९३०_0018.pdf | 2 Oct 2019 |
| Building Plan Approval / NA Order for plotted developmentFile: MYSCAN_२०१९०९३०_0019.pdf | 2 Oct 2019 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate compressed.pdf | 2 Oct 2019 |
| Declaration in FORM BFile: Form B Partner Santosh A Bhoir compressed.pdf | 2 Oct 2019 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Thane
Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.
Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 60 filed documents as one ZIP, foldered, with a manifest
Keep Prakash Pratima on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GARIBACHA WADA7,600+ in Thane
Filed coordinates, straight-line distance. 91 registered projects within 2 km.
Swaminarayan City Phase 1C
Swaminarayan Life Space LLP
Swaminarayan City Phase I
Swaminarayan Life Space LLP
BHOIR JEWELS
SHANKAR NAMAJI BHOIR
Swaminarayan City Phase 1D
Swaminarayan Life Space LLP
Amar Galaxy Bldg No. 2 Wing B and C
AMAR REALTY
Swaminarayan City Phase 1B
Swaminarayan Life Space LLP
See every Thane project, with the district possession charts
Builder: Anant Developers
Anant Developers has 2 registrations on MahaRERA, including Anant Nagar and Prakash Pratima. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.
Frequently asked questions
What are my rights if Prakash Pratima is delayed beyond 30 Dec 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Prakash Pratima?
The registered promoter entity is Anant Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Prakash Pratima?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Prakash Pratima?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Prakash Pratima?
The professionals named in the filing: Architect: TIBIN TONSON THOMAS; Engineer: MANOHAR VISHNU PATIL; Chartered Accountant: SONALI SUNIL MHATRE; Chartered Accountant: SWAPNIL SURESH VARDAM. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Prakash Pratima?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback