Completed No litigation declared Others project

Prabhus Atlantis

By Pacific Builders

RG-MH-01926 · RERA P51600009658 · Last updated on MahaRERA portal: 26 Jul 2021

Source: official MahaRERA filing

Red flags

  • 2 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 4 earlier projects delivered on promise

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Nashik registration emailed to you, free during the pilot beta.
Jun 2023Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
2Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Prabhus Atlantis is a Others project by Pacific Builders in Nashik, Maharashtra, registered with MahaRERA as P51600009658 on 22 Aug 2017. The registration is recorded completed; possession was promised by 30 Jun 2023. 2 complaints are on record with the regulator.

At a glance

Project

  • NamePrabhus Atlantis
  • TypeOthers
  • Location
    • Pipe Line Road
    • Near Wisdom Highschool
    • Aanandwali
    • Nashik
    • 422013
  • Pincode422013
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51600009658
  • ReraGenie IDRG-MH-01926

Builder

  • NamePacific Builders
  • Entity typePartnership
  • PartnersSonal Prashant Patil, Prashant Harchand Patil
  • Other registrations4 more →
  • Completed4 of 5
  • Declared earlier projects4 →

Key dates

this monthRegisteredAug 2017PromisedJun 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on22 Aug 2017
  • Promised completion30 Jun 2023
  • Revised completionNone
  • Buildings2 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A TowerNA170000
B TowerNA170000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 26 Jul 2021, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

A Tower91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B Tower91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities19

As on 26 Jul 2021, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes100%
Gymnasium With Few EquimpentsYes100%
Library Room With Indoor GamesYes100%
Net Cricket BoxYes100%
Yoga And Mediation RoomYes100%

Parking filed180

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots180
Closed/Covered78
Open Space102
BuildingClosed/CoveredOpen SpaceTotal
A Tower376097
B Tower414283

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area5,300 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Permissible FSI18842.07
Proposed, not sanctioned14,931 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch480 Y Swami R P Road Nashik Maharashtra 422002

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMilind Saraf of Subha Architect
ArchitectPrahant Harchand Patil
EngineerJw Consultant LLP
PartnerRole in project
Pacific Builders-

Complaints filed with MahaRERA2

Case no.ComplainantRespondentFiled
CC001000000040279Chirag ThakkarPrashant Harchand patil26/03/2024
CC001000000060317Rajendra Baburao GhugeM/s Pacific Builders19/04/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 29 Jul 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Jul 2017
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Aug 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 May 2018Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Status of Formation of Legal Entity (Society/Co Op etc.)File: Prabhus Atlantis Declartion.pdf26 Jul 2021
Status of ConveyanceFile: Prabhus Atlantis Declartion.pdf26 Jul 2021
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE ATLANTIS RERA 31052019.pdf9 Nov 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGG CERTIFICATE ATLANTIS 30092019.pdf9 Nov 2019
Certificates of CA (Form 3)File: CA CERTIFCATE FOR RERA RERA 30092019.pdf9 Nov 2019
Certificates of CA (Form 5)File: ATLANTIS RERA CA CERTIFICATE.pdf30 Sep 2019
Certificates of Architect (Form 4)File: ATLANTIS FORM NO4 FROM ARCHITECT.pdf24 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE ATLANTIS RERA 31052019.pdf22 Jun 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE ATLANTIS RERA 31052019.pdf22 Jun 2019
Certificates of CA (Form 3)File: CA CERTIFCATE FOR RERA RERA 31052019.pdf22 Jun 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE ATLANTIS RERA 31012019.pdf20 Mar 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE ATLANTIS RERA 31012019.pdf20 Mar 2019
Certificates of CA (Form 3)File: CA CERTIFCATE FOR RERA RERA 31012019.pdf20 Mar 2019
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE ATLANTIS RERA 31102018.pdf1 Dec 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE ATLANTIS RERA 31102018.pdf1 Dec 2018
Certificates of CA (Form 3)File: CA CERTIFCATE FOR RERA RERA 31102018.pdf1 Dec 2018
Certificates of CA (Form 5)File: Pacific Atlantis Form 5 .pdf29 Sep 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE ATLANTIS RERA 31072018.pdf24 Aug 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE ATLANTIS RERA 31072018.pdf24 Aug 2018
Certificates of CA (Form 3)File: CA CERTIFICATE PRABHU ATLANTIS 31072018.pdf24 Aug 2018
Commencement Certificates / NA Order for plotted developmentFile: Atlantis Revised Commencement Certificate.pdf23 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT CERTIFICATE RERA ATLANTIS 2ND UPDATION.pdf23 May 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE RERA ATLANTIS 2ND UPDATION.pdf23 May 2018
Certificates of CA (Form 3)File: CA CERTIFICATE RERA ATLANTIS 2ND UPDATION.pdf23 May 2018
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCHITECT Atlantis - Rera Certificate.pdf19 Feb 2018
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA ENG CERTIFICATE 31012018.pdf19 Feb 2018
Certificates of CA (Form 3)File: CA CERTIFICATE ATLANTIS 31012018.pdf19 Feb 2018
Building plan approvalFile: REVISED 1 ATLANTIS.pdf28 Aug 2017
Building plan approvalFile: REVISED 2 ATLANTIS.pdf28 Aug 2017
Building plan approvalFile: REVISED 3 ATLANTIS.pdf28 Aug 2017
Building plan approvalFile: REVISED 4 ATLANTIS.pdf28 Aug 2017
Building plan approvalFile: REVISED 5 ATLANTIS.pdf28 Aug 2017
Building plan approvalFile: REVISED 6 ATLANTIS.pdf28 Aug 2017
Building Plan Approval (IOD)File: REVISED 1 ATLANTIS.pdf28 Aug 2017
Building Plan Approval (IOD)File: REVISED 2 ATLANTIS.pdf28 Aug 2017
Building Plan Approval (IOD)File: REVISED 3 ATLANTIS.pdf28 Aug 2017
Building Plan Approval (IOD)File: REVISED 4 ATLANTIS.pdf28 Aug 2017
Building Plan Approval (IOD)File: REVISED 5 ATLANTIS.pdf28 Aug 2017
Building Plan Approval (IOD)File: REVISED 6 ATLANTIS.pdf28 Aug 2017
Layout approvalFile: Copy Of Layout Plot No 1 Atlantis.pdf29 Jul 2017
Building plan approvalFile: Atlantis 1.pdf29 Jul 2017
Building plan approvalFile: Atlantis 2.pdf29 Jul 2017
Building plan approvalFile: Atlantis 3.pdf29 Jul 2017
Building plan approvalFile: Atlantis 4.pdf29 Jul 2017
Building plan approvalFile: Atlantis 5.pdf29 Jul 2017
Building plan approvalFile: Atlantis 6.pdf29 Jul 2017
PAN CardFile: PACIFIC PAN CARD.pdf29 Jul 2017
Copy of the legal title reportFile: Legal Titel Report Atlantis By Mundada.pdf29 Jul 2017
Copy of the legal title reportFile: LEGAL TITAL REPORT ATLANTIS BY CHINDHADE.pdf29 Jul 2017
Details of encumbrancesFile: Index II ENcubrances.pdf29 Jul 2017
Copy of Layout Approval (in case of layout)File: Copy Of Layout Plot No 1 Atlantis.pdf29 Jul 2017
Building Plan Approval (IOD)File: Atlantis 1.pdf29 Jul 2017
Building Plan Approval (IOD)File: Atlantis 2.pdf29 Jul 2017
Building Plan Approval (IOD)File: Atlantis 3.pdf29 Jul 2017
Building Plan Approval (IOD)File: Atlantis 4.pdf29 Jul 2017
Building Plan Approval (IOD)File: Atlantis 5.pdf29 Jul 2017
Building Plan Approval (IOD)File: Atlantis 6.pdf29 Jul 2017
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate Atlantis BW.pdf29 Jul 2017
Declaration in FORM BFile: Affidavit cum Declaration RERA Atlantis.pdf29 Jul 2017
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Atlantis RERA.pdf29 Jul 2017
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certificate Atlantis RERA 29072017 819pm.pdf29 Jul 2017
Certificates of CA (Form 3)File: CA Certificate Atlantis RERA.pdf29 Jul 2017
Proforma of Allotment letterFile: Atlantis Allotment Letter and AGreement Draft.pdf29 Jul 2017
OtherFile: Declaration Regarding Approval Area Atlantis.pdf29 Jul 2017

Promoter's earlier projects4

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

4 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
Prabhu FortSHRI SHRI RAVISHANKAR MARG DGP NAGAR Nashik 4220061CompletedMar 2020Nov 2018
Prabhu OrbitNashik Shiwar Near Kalidas Kala Mandir Shalimar Nashik- 42200110CompletedSep 2014Mar 2014
Prabhu PlatinumWadala Shiwar Behind Inox Multiplex Nashik Puna Road Nashik 42200615CompletedOct 2012May 2012
Prabhu PlanetWadala Shiwar Behind Inox Nashik Puna Road Nashik-42200610CompletedOct 2010Jun 2010

How this compares with Nashik

10%of Nashik projects moved their completion datethis one has not
19%of Nashik registrations have lapsed or been cancelledthis one is completed

Computed across the 4,100+ Nashik projects on ReraGenie, from their own filings.

Free monthly report: Nashik on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Prabhus Atlantis on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Near Wisdom Highschool4,100+ in Nashik

Builder: Pacific Builders

Pacific Builders has 5 registrations on MahaRERA, including Prabhu Fort and Prabhus Atlantis. Its filings disclose 4 earlier MahaRERA projects: declares 4 of 4 past projects completed on time. Read the full track record. See more projects on the Nashik district page.

Frequently asked questions

What are my rights if Prabhus Atlantis is delayed beyond 30 Jun 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Prabhus Atlantis?

The registered promoter entity is Pacific Builders, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Prabhus Atlantis?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Prabhus Atlantis?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Prabhus Atlantis?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Prabhus Atlantis?

The professionals named in the filing: Architect: Milind Saraf of Subha Architect; Architect: Prahant Harchand Patil; Engineer: Jw Consultant LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Prabhus Atlantis?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Prabhus Atlantis. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Prabhus Atlantis to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.