Home / Browse projects / Raigarh, Maharashtra / PRAARAMBH SADANIKA

Registered No litigation declared Residential / Group Housing project

PRAARAMBH SADANIKA

By S.B. REALTORS

RG-MH-06256 · RERA P52000053148 · Last updated on MahaRERA portal: 13 Jul 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 12 months from the original
4 of 11Construction stages donefurthest along: Internal walls, 95%
22 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

PRAARAMBH SADANIKA is a Residential / Group Housing project by S.B. REALTORS in Raigarh, Maharashtra, registered with MahaRERA as P52000053148 on 17 Oct 2023. Possession is promised by 31 Dec 2026. The completion date has moved by 12 months from the original filing. 6 of the 28 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.

At a glance

Project

  • NamePRAARAMBH SADANIKA
  • TypeResidential / Group Housing
  • Location
    • KOLHARE
    • KOLHARE NERAL
    • Karjat
    • Raigarh
    • 410101
  • Pincode410101
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000053148
  • ReraGenie IDRG-MH-06256

Builder

  • NameS.B. REALTORS
  • Entity typePartnership
  • GSTIN27AEUFS0996M1ZW
  • PartnersRAJESH VITTAL KHANDARE, SWAPNIL MAHENDRA DESHMUKH, VISHWNATH RAGHUNATH MALI, BHARAT RAMA KARALE, GAJANAN VITTHAL KHANDARE
  • PartnerSANDESH TUKARAM BHOIR

Key dates

this monthRegisteredOct 2023First promiseDec 2025Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Oct 2023
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed80 files

Current status

21%6 of 28 units booked
81.8%Work done, per cost certificate

Figures as on 13 Jul 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
PRAARAMBH SADANIKANA6628028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 13 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 95%.

PRAARAMBH SADANIKA: 67% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises95%
Sanitary Fittings within the flats / premises60%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks90%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.30%

Progress on shared amenities15

As on 13 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed24

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots24
Closed/Covered24

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area526 sq m
Land owned byNot the promoter
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Jul 2025
LandownerVillageDistrict
Vilas Shreeram DhondeAmbarnath (R)Thane
Mukta Tukaram BhoirVangani (CT)Thane

Approvals and building plan

Sanctioning authorityCOLLECTOR RAIGAD ALIBAG
Permissible FSI1177.51
Proposed, not sanctioned1,178 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNERAL
Estimated costRs 2.85 cr
Cost incurredRs 2.33 cr
Work done81.78%
BuildingWingEstimatedIncurred
PRAARAMBH SADANIKANARs 2.53 crRs 2.33 cr
-NARs 31.64 lakh-

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectTHE DESIGN INDIA GROUP
EngineerTHE DESIGN INDIA GROUP
Chartered AccountantH V KATARIA & ASSOCIATES KATARIA
Chartered AccountantHARISH WAGARAM CHOUDHARY
PartnerRole in project
S.B. REALTORS-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA18122518734Dec 2025 → Dec 2026

Reason as filed by the promoterDue to inadequate availability of funds the construction progress was slowed down and the project could not completed within the stipulated completion date 31.12.2025

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 19 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Jul 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf13 Jul 2026
Withdrawal Update Form 2File: FORM 2 16 04 2026.pdf13 Jul 2026
Withdrawal Update Form 3File: form 3.pdf13 Jul 2026
Withdrawal Update Form 1File: FORM 1 16 04 026.pdf19 Jun 2026
Withdrawal Update Form 2File: FORM 2 16 04 2026.pdf19 Jun 2026
Withdrawal Update Form 3File: Form 3 18 04 2026.pdf19 Jun 2026
Form 2A (FY 2025-2026)File: praarambh sadanika form 2 A.pdf19 Jun 2026
Withdrawal Update Form 1File: FORM 1 praarambh sadanika.pdf30 Jan 2026
Withdrawal Update Form 2File: FORM 2 Praarambh Sadnika.pdf30 Jan 2026
Withdrawal Update Form 3File: FORM 3 PRAARAMBH SADANIKA.pdf30 Jan 2026
Withdrawal Update Form 1File: sb realtors form 1.pdf12 Dec 2025
Withdrawal Update Form 1File: sb realtors form 1.pdf12 Dec 2025
Withdrawal Update Form 1File: sb realtors form 1.pdf12 Dec 2025
Withdrawal Update Form 2File: sb realtors form 2.pdf12 Dec 2025
Withdrawal Update Form 2File: sb realtors form 2.pdf12 Dec 2025
Withdrawal Update Form 2File: sb realtors form 2.pdf12 Dec 2025
Withdrawal Update Form 3File: sb realtors form 3.pdf12 Dec 2025
Withdrawal Update Form 3File: sb realtors form 3.pdf12 Dec 2025
Withdrawal Update Form 3File: sb realtors form 3.pdf12 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A SB Realtors.pdf5 Dec 2025
Form 5 (FY 2024-2025)File: Sb Realtors Form 5(2).pdf24 Nov 2025
Withdrawal Update Form 1File: sb realtors form 1.pdf3 Nov 2025
Withdrawal Update Form 2File: sb realtors form 2.pdf3 Nov 2025
Withdrawal Update Form 3File: sb realtors form 3.pdf3 Nov 2025
Withdrawal Update Form 1File: 0cbd066a-d7f9-409f-83da-5abdd61d0e89.pdf10 Oct 2025
Withdrawal Update Form 1File: 0cbd066a-d7f9-409f-83da-5abdd61d0e89.pdf10 Oct 2025
Withdrawal Update Form 2File: 3179066c-43e1-45a5-be45-845d7e74d5a2.pdf10 Oct 2025
Withdrawal Update Form 2File: 3179066c-43e1-45a5-be45-845d7e74d5a2.pdf10 Oct 2025
Withdrawal Update Form 3File: 712af2cb-db05-4ae7-b667-4844a8960a92.pdf10 Oct 2025
Withdrawal Update Form 3File: 712af2cb-db05-4ae7-b667-4844a8960a92.pdf10 Oct 2025
Form 1File: FORM 1 prarambh sadanika.pdf18 Jul 2025
Form 2File: FORM 2 prarambh sadanika.pdf18 Jul 2025
Form 3File: Form No 3 CA certificate.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: SOLD BOOKED INVENTORY prarambh.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 FAINAL.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FAINAL.pdf7 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 FAIN AL.pdf7 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3.pdf18 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf18 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 S B Realtors 30 09 24.pdf29 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 S B REALTORS.pdf16 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 S B REALTORS.pdf16 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARCHITECT CERTIFICATE SB REALTORS.pdf5 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 ENGINEER CERTIFICATE SB REALTORS_compressed.pdf5 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE SB REALTORS.pdf18 Jun 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: S B REALTORS FORM 2.pdf18 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A SB REALTORS.pdf18 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 S B REALTORS.pdf14 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERTIFICATE 23 OCT 2023.pdf26 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEERS CERTIFICATE 23 OCT 2023.pdf26 Oct 2023
Other - TechnicalFile: MAIL CONFORMATION.pdf6 Sep 2023
Declaration about Commencement CertificateFile: format b.pdf21 Aug 2023
Other - TechnicalFile: sb realtors.pdf21 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 - PAGE 1_merged_compressed.pdf2 Aug 2023
Building plan approvalFile: PLAN COPY.pdf20 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: PLAN COPY.pdf20 Jul 2023
Copy of the legal title reportFile: legal report.pdf19 Jul 2023
Other - FinanceFile: SB realtors financial query.pdf11 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: building cc (1)_compressed (1).pdf8 Jul 2023
Declaration in FORM BFile: SB REALTORS FORM B.pdf8 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SB REALTORS ANNEXURE A Bharat karale.pdf8 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SB REALTORS ANNEXURE A gajanan khandre.pdf8 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SB REALTORS ANNEXURE A Rajesh khandare.pdf8 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SB REALTORS ANNEXURE A sandesh bhoir.pdf8 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SB REALTORS ANNEXURE A vishvanath mali.pdf8 Jul 2023
Proforma of Agreement for saleFile: AGREEMENT OF SALE FINAL.pdf8 Jul 2023
Layout approvalFile: BUILDING PLAN_compressed_compressed_compressed (1)_compressed.pdf5 Jul 2023
PAN CardFile: PAN CARD.pdf5 Jul 2023
Details of encumbrances concerned to FinanceFile: SB Realtors no Encumbrance Concern to Finance.pdf5 Jul 2023
Details of encumbrances concerned to FinanceFile: SB realtors No Encumbrance concern to legal.pdf5 Jul 2023
Details of encumbrances concerned to LegalFile: SB Realtors no Encumbrance Concern to Finance.pdf5 Jul 2023
Details of encumbrances concerned to LegalFile: SB realtors No Encumbrance concern to legal.pdf5 Jul 2023
Copy of Layout Approval (in case of layout)File: BUILDING PLAN_compressed_compressed_compressed (1)_compressed.pdf5 Jul 2023
CERSAI detailsFile: SB realtors report to CERSAI.pdf5 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: SB realtors Annexure A SANJAY DESHMUKH.pdf5 Jul 2023
Proforma of Allotment letterFile: ALLOTMENT LETTER FINAL.pdf5 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SB realtors Format A.pdf5 Jul 2023
Deviation Report with respect to Allotment letterFile: SB realtors no deviation in the allotment letter.pdf5 Jul 2023
Deviation Report with respect to model copy of AgreementFile: SB realtors no deviation in the agreement for sale.pdf5 Jul 2023

How this compares with Raigarh

21%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 12 months
26%of Raigarh registrations have lapsed or been cancelledthis one is on the register

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep PRAARAMBH SADANIKA on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KOLHARE NERAL5,900+ in Raigarh

2 kmPRAARAMBH SADANIKACompleted 58Lapsed / revoked 30Other 38Dot size: filed unitsN

Filed coordinates, straight-line distance. 126 registered projects within 2 km.

Builder: S.B. REALTORS

S.B. REALTORS has 1 registration on MahaRERA, including PRAARAMBH SADANIKA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if PRAARAMBH SADANIKA is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of PRAARAMBH SADANIKA?

The registered promoter entity is S.B. REALTORS, a partnership as per the filing. Its GSTIN 27AEUFS0996M1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in PRAARAMBH SADANIKA?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for PRAARAMBH SADANIKA?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at PRAARAMBH SADANIKA?

The professionals named in the filing: Architect: THE DESIGN INDIA GROUP; Engineer: THE DESIGN INDIA GROUP; Chartered Accountant: H V KATARIA & ASSOCIATES KATARIA; Chartered Accountant: HARISH WAGARAM CHOUDHARY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in PRAARAMBH SADANIKA?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About PRAARAMBH SADANIKA. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save PRAARAMBH SADANIKA to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.