Home / Browse projects / Mumbai Suburban, Maharashtra / POONAM HEIGHTS
POONAM HEIGHTS
RG-MH-24704 · RERA P51800005555 · Last updated on MahaRERA portal: 16 Feb 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 16 months past the filed date
- 4 complaints at MahaRERA
- Completion date moved by 78 months
- 3 extensions taken
Clear
- No litigation declared
- Separate project account declared
- Allotment letter follows the model form
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
POONAM HEIGHTS is a Residential / Group Housing project by SHAH & MEHTA ASSOCIATES in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800005555 on 11 Aug 2017. Possession was promised by 30 Jun 2025 and is now 16 months past that date. The completion date has moved by 78 months from the original filing. 112 of the 116 units on this registration are recorded sold or booked, and 22 of 22 construction stages are filed complete. 4 complaints are on record with the regulator.
At a glance
Project
- NamePOONAM HEIGHTS
- TypeResidential / Group Housing
- Location
- s.v.road
- udhaya nagar
- Borivali
- Mumbai Suburban
- 400062
- Pincode400062
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800005555
- ReraGenie IDRG-MH-24704
Builder
- NameSHAH & MEHTA ASSOCIATES
- Entity typeOthers
- Named personTIMESTAR LIMITED
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Aug 2017
- Promised completion30 Jun 2025
- Revised completionRevised to 30 Jun 2025 (originally 31 Dec 2018)
- Buildings2 building records
- Documents filed104 files
Current status
Figures as on 16 Feb 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| POONAM HEIGHTS A WING | NA | 25 | 20 | 58 | 0 | 58 |
| POONA HEIGHTS B WING | NA | 25 | 20 | 58 | 0 | 58 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 16 Feb 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
22 of 22 construction stages are filed complete across 2 buildings.
POONAM HEIGHTS A WING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
POONA HEIGHTS B WING100%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 16 Feb 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 95% |
| Storm Water Drains | Yes | 95% |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 50% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 10% |
| Open Parking | Yes | 10% |
Parking filed204
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| POONAM HEIGHTS A WING | 67 | 35 | 102 |
| POONA HEIGHTS B WING | 66 | 36 | 102 |
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| TIMESTAR LTD | Borivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| POONAM HEIGHTS A WING | NA | Rs 74.92 cr | Rs 74.39 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aakar Architects |
| Architect | ARCH Reza Kabul |
| Engineer | J W Consultants |
| Chartered Accountant | JAY JHAVERI & CO |
| Partner | Role in project |
|---|---|
| SHAH & MEHTA ASSOCIATES | - |
Extensions applied for3
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterAmenity Open Space Handover & Transfer of Ownership in name of MCGM is In Progress. Because of No Name transfer, permission for constructing Swimming pool & Club House is restricted; Supreme Court Order for Debris Removal & Dumping Ground; Application of DCPR 2034 (No Clarification on transition policy), FSI on Gross Plot Area as per proposed DCPR 2034 (No Clarification on policy). Detailed explanation given in letter attached.
Reason as filed by the promoterThere are elevation features from 3rd floor to 16th floor and passages which are enclosed by the flat owners, Elevation features are filled to floor level by some of the flat owners which otherwise were left void as per approved drawing by the builder, Toilet ducts are filled and extended and created contravening toilets, Windows are shifted to elevation line, Internal walls are changed and flats are combined, etc without the approval from RCC consultant or from MCGM. All these changes in the building are affecting the proposal in BMC and our further approvals has been stuck up. We had also re
Reason as filed by the promoterDear Sir, We hereby apply for extension u/s 7(3) of the registered project bearing vide no. P5180000555 do hereby declare that the extended date of completion of above mentioned project was 30th October 2020.We would like to inform you that the project is 92.65% completed. There are some unsold units in the project which need to be sold but without the Extension Number, we are unable to sell those apartments. We have applied for the extension as per MahaRERA circular no. 27/2020 , Regulatory case no. 11/2023, in our extension matter Hon’ble Chairperson Ajoy Mehta conducted a hearing on 16th Fe
Complaints filed with MahaRERA4
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000161383 | Poonam Heights Welfare Association | Time Star Ltd & Ors | 26/11/2019 |
| CC006000000193969 | Poonam Heights Welfare Association | TIMESTAR LIMITED | 15/09/2020 |
| CC006000000197575 | MR. MANOHAR SANTARAM PEVEKAR | M/S. TIMESTAR LIMITED | 12/07/2021 |
| CC006000000197152 | Shah & Mehta Assocaites | Poonam Heights Welfare | 11/06/2021 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 27 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 27 Jul 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 27 Jul 2017 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 27 Jul 2017Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 2 Sep 2019
Documents filed104
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 104 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate.pdf | 16 Feb 2026 |
| Withdrawal Update Form 2File: engineering certifcate upto sept 25.pdf | 16 Feb 2026 |
| Withdrawal Update Form 3File: Form 3_June 2025.pdf | 16 Feb 2026 |
| Certificates of CA (Form 3)File: form 3 upto march 25.pdf | 6 May 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch certificate upto march 25.pdf | 2 Apr 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate upto march 25.pdf | 2 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold unsold upto march 25.pdf | 2 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality control upto march 25.pdf | 2 Apr 2025 |
| Certificates of CA (Form 3)File: oct to dec 24.pdf | 1 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: form 5 ts fy 23-24.pdf | 8 Jan 2025 |
| Certificates of CA (Form 3)File: form 3 june24.pdf | 11 Dec 2024 |
| Certificates of CA (Form 3)File: form 3 sept24.pdf | 11 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: sm form 5 for fy 23-24.pdf | 11 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: engineer certificate upto march 24.pdf | 1 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: quality certificate upto march 24.pdf | 1 Jul 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch certificate.pdf | 26 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold unit.pdf | 26 Jun 2024 |
| Certificates of CA (Form 3)File: Ca form 3 upto dec 23.pdf | 26 Jun 2024 |
| Certificates of CA (Form 3)File: Revised CA certiciate upto march 24.pdf | 26 Jun 2024 |
| Disclosure of sold/ booked inventoryFile: disclosure of flat.pdf | 9 Jan 2024 |
| OtherFile: monthly project report.pdf | 6 Jan 2024 |
| OtherFile: MOnthly report.pdf | 5 Jan 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: ts form 5 fy 22-23.pdf | 22 Dec 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: eng certifiicate.pdf | 22 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch certificae.pdf | 21 Nov 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Quality assurance.pdf | 21 Nov 2023 |
| Certificates of CA (Form 3)File: sm form 3.pdf | 20 Nov 2023 |
| Certificates of CA (Form 3)File: sm form 3.pdf | 20 Nov 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: sm form 5 2022-23.pdf | 10 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: arch certificate.pdf | 14 Jun 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER'S CERTIFICATE.pdf | 14 Jun 2023 |
| Disclosure of sold/ booked inventoryFile: disclosure of flats.pdf | 14 Jun 2023 |
| Certificates of CA (Form 3)File: form 3.pdf | 14 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY ENGINEER FY 19-20.pdf | 24 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ENGINEER FY 20-21.pdf | 24 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Sm Form 5 2019-20.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Sm Form 5 2020-21.pdf | 16 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: sm Form 5 2021-22.pdf | 16 Feb 2023 |
| OtherFile: SHAH MEHTA ASSOCIATES.pdf | 16 Feb 2023 |
| Certificates of CA (Form 3)File: Form 3- oct 22 to dec 22.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: sm form 5 fy 18-19.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: timestar form 5 fy -18-19.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: timestar form 5- fy 19-20.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: timestar form 5- fy 20-21.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: timestar form 5- fy 21-22.pdf | 15 Feb 2023 |
| Details of encumbrances concerned to FinanceFile: 1 Details of encumbrances.pdf | 14 Feb 2023 |
| Details of encumbrances concerned to LegalFile: 1 Details of encumbrances.pdf | 14 Feb 2023 |
| Proforma of Agreement for saleFile: GetUserDocumentFileContent.pdf | 14 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: SCAN_20230210_142143778.pdf | 10 Feb 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Scanned Documents.pdf | 10 Feb 2023 |
| Declaration about Commencement CertificateFile: declaration of cc.pdf | 9 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: engineer quality certificate upto.pdf | 9 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: disclosure of sold unsold units.pdf | 9 Feb 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A- disclosure of interest.pdf | 9 Feb 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: ARCH CERTIFICATE.pdf | 2 Jan 2023 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: ENGINEER CERTIFICATE.pdf | 2 Jan 2023 |
| Certificates of CA (Form 3)File: rera certificate sept 22.pdf | 28 Dec 2022 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: phts society certificate.pdf | 21 Jun 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers Certificate.pdf | 2 Sep 2019 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 2 Sep 2019 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Architect certificate.pdf | 2 Sep 2019 |
| Certificates of CA (Form 5)File: shahandmehtaassociates.pdf | 31 Oct 2018 |
| Certificates of CA (Form 5)File: timestarltd.pdf | 31 Oct 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: POONAM-ARCHITECT CERTIFICATE-JUNE'18.pdf | 8 Jun 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: POONAM-ARCHITECT CERTIFICATE-MARCH'18.pdf | 8 Jun 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: POONAM ENGINEER CERTIFICATE-JUNE'18.pdf | 8 Jun 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: POONAM ENGINEER CERTIFICATE-MARCH'18.pdf | 8 Jun 2018 |
| Certificates of CA (Form 3)File: POONAM-CA CERTIFICATE-JUNE'18.pdf | 8 Jun 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar Certificate .pdf | 20 Feb 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: EnggCertificate .pdf | 20 Feb 2018 |
| Certificates of CA (Form 3)File: CA Certiicate.pdf | 20 Feb 2018 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate.pdf | 31 Oct 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer's Certificate.pdf | 31 Oct 2017 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 31 Oct 2017 |
| Certificates of CA (Form 3)File: CA Certificate sm.pdf | 29 Jul 2017 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Certificate.pdf | 28 Jul 2017 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineer Certicate.pdf | 28 Jul 2017 |
| Layout approvalFile: POONAM HT BLOCK PLAN.pdf | 27 Jul 2017 |
| Building plan approvalFile: 1 AND 2 FLOOR.pdf | 27 Jul 2017 |
| Building plan approvalFile: 5 - Plan upto 16th floor .pdf | 27 Jul 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 104 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep POONAM HEIGHTS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near udhaya nagar6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 423 registered projects within 2 km.
NIRLON EMPLOYEES COOPERATIVE HOUSING SOCIETY L
SHIVAM PARIVAR DEVELOPERS PVT LTD
GUNDECHA REXON SUITES PHASE 1
ANAYA INFRASTRUCTURE PVT LTD
PALAI TOWERS
N D DEVELOPERS
AGARWAL FLORENCE
PARAM ANAND BUILDERS LLP
KRISHNA KUNJ PHASE 1
PRINCE HOUSING AND HOSPITALITY PRIVATE LIM
NIRLON EMPLOYEES CHS LTD BUILDING NO. 10
Shivam Parivar Developers Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: SHAH & MEHTA ASSOCIATES
SHAH & MEHTA ASSOCIATES has 1 registration on MahaRERA, including POONAM HEIGHTS. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that POONAM HEIGHTS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if POONAM HEIGHTS is delayed beyond 30 Jun 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of POONAM HEIGHTS?
The registered promoter entity is SHAH & MEHTA ASSOCIATES, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in POONAM HEIGHTS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against POONAM HEIGHTS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for POONAM HEIGHTS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at POONAM HEIGHTS?
The professionals named in the filing: Architect: Aakar Architects; Architect: ARCH Reza Kabul; Engineer: J W Consultants; Chartered Accountant: JAY JHAVERI & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in POONAM HEIGHTS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback