Platinum One

By A Advani Promoters & Developers LLP

RG-MH-59404 · RERA PC1260002501028 · Last updated on MahaRERA portal: 1 May 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Rs 60.00 crore secured on the land, in favour of Aditya Birla Capital Ltd

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 10Construction stages donefurthest along: Excavation, 26%
14 of 15Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 29 documents Report an error

Platinum One is a Commercial project by A Advani Promoters & Developers LLP in Pune, Maharashtra, registered with MahaRERA as PC1260002501028 on 1 Oct 2025. Possession is promised by 30 Dec 2030. 1 of the 15 units on this registration are recorded sold or booked, and 0 of 10 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NamePlatinum One
  • TypeCommercial
  • Location
    • Hadapsar Railway Station Road
    • Mundhwa South
    • Mundhawa
    • Haveli
    • Pune
    • 411036
  • Pincode411036
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PC1260002501028
  • ReraGenie IDRG-MH-59404

Builder

  • NameA Advani Promoters & Developers LLP
  • Entity typeLimited Liability Partnership
  • LLPINACE-8613
  • GSTIN27ACEFA4066C1ZQ
  • PartnersAnil Shankar Advani, Mohnish Anil Advani, Varun Anil Advani

Key dates

this monthRegisteredOct 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on1 Oct 2025
  • Promised completion30 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed29 files

Current status

7%1 of 15 units booked
0.9%Work done, per cost certificate

Figures as on 1 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Platinum OneNA141101515

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 10 construction stages are filed complete. The stage furthest along is Excavation, at 26%.

Platinum One: 3% average across the applicable activities

ActivityProgress
Excavation26%
Basement (if any)0%
Podiums (if any)Not applicable
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNo0%
Water SupplyNo0%
Sewerage (Chamber, Lines, Septic Tank , STP)No0%
Storm Water DrainsNo0%
Landscaping & Tree PlantingNo0%
Street LightingNo0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNo0%
Solid Waste Management And DisposalNo0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNo0%
Electrical meter room, sub-station, receiving stationNo0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed576

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots576
Closed/Covered576

Land and ownership4

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,392 sq m
Land owned byNot the promoter
Named landowners4
Encumbrance on the landDeclared present
Charge in favour ofAditya Birla Capital Ltd
Secured amountRs 60.00 crore
CERSAI search filedYes
Declared on16 Jan 2026
LandownerVillageDistrict
Raghav GuptaPune (M Corp.)Pune
Raghav Gupta HUFMundhawaPune
Pooja Raghav GuptaMundhawaPune
Vedom Innovest CorporationMundhawaPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI15968.74
Proposed, not sanctioned10,230 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPLATINUM CAPITAL, SR NO M 81 27, UNIT 5, GROUND FLOOR, KOREGAON PARK ANNEXE, MUNDHWA, PUNE
Estimated costRs 62.00 cr
Cost incurredRs 55.16 lakh
Work done0.89%
BuildingWingEstimatedIncurred
Platinum OneNARs 58.90 crRs 52.40 lakh
-NARs 3.10 crRs 2.76 lakh

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCrystal Landmark LLP
EngineerJW Consultants LLp
EngineerNexus Consultants & Engineers
EngineerSK Consultants & Engineers
Chartered AccountantN B Sayed & Associates
Chartered AccountantSPCM & Associates
Chartered AccountantSiddhant Abhay Bora
PartnerRole in project
A Advani Promoters & Developers LLP-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
SM12600177Ram GawaliA Advani Promoters & Developers LLP23/03/2026
SM12600196Ram GawaliA Advani Promoters & Developers LLP23/03/2026
SM12600197Ram GawaliA Advani Promoters & Developers LLP23/03/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportNot on the file

    A lawyer's report on who owns the land and what is registered against it.

  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Apr 2026
  4. Commencement CertificateNot on the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2030

Documents filed29

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Platinum One as on March 2026.pdf1 May 2026
Withdrawal Update Form 2File: Form 2 Singed March 26 Platinum One.pdf1 May 2026
Withdrawal Update Form 3File: Form 3 Platinum One March 2026 signed.pdf1 May 2026
Form 2A (FY 2025-2026)File: Form 2A - 2025 - 2026.pdf23 Apr 2026
Layout approvalFile: Plan 1 - Highlighted.pdf20 Apr 2026
Building plan approvalFile: Plan 2.pdf20 Apr 2026
Building plan approvalFile: Plan 3.pdf20 Apr 2026
Building plan approvalFile: Plan 4.pdf20 Apr 2026
Building plan approvalFile: Plan 5.pdf20 Apr 2026
Building plan approvalFile: Plan 6.pdf20 Apr 2026
Building plan approvalFile: Plan 7.pdf20 Apr 2026
Building plan approvalFile: Plan 8.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 - Platinum One as on March 2026.pdf20 Apr 2026
Withdrawal Update Form 2File: Form 2 Singed March 26 Platinum One.pdf20 Apr 2026
Withdrawal Update Form 3File: Form 3 Platinum One March 2026 signed.pdf20 Apr 2026
Withdrawal Update Form 1File: Form 1 - March 2026.pdf18 Apr 2026
Withdrawal Update Form 2File: Form 2 - Platinum One as on Dec 2025.pdf18 Apr 2026
Withdrawal Update Form 3File: Form 3 - Platinum One as on Dec 2025.pdf18 Apr 2026
Withdrawal Update Form 1File: Form 1 - Platinum One as on Dec 2025.pdf18 Jan 2026
Withdrawal Update Form 2File: Form 2 - Platinum One as on Dec 2025.pdf18 Jan 2026
Withdrawal Update Form 3File: Form 3 - Platinum One as on Dec 2025.pdf18 Jan 2026
Declaration and undertaking (Annexure A)File: Annexure A - Order No 50.pdf26 Sep 2025
Layout approvalFile: BP LAYOUT PLAN 01-07_ Layout.pdf26 Sep 2025
Building plan approvalFile: BP LAYOUT PLAN 02-07_ Basement 1 and 2.pdf24 Sep 2025
Building plan approvalFile: BP LAYOUT PLAN 03-07_ Ground and 1st Floor.pdf24 Sep 2025
Building plan approvalFile: BP LAYOUT PLAN 04-07_ 2-5th Floor.pdf24 Sep 2025
Building plan approvalFile: BP LAYOUT PLAN 05-07- Mumty and OHWT level.pdf24 Sep 2025
Building plan approvalFile: BP LAYOUT PLAN 06-07 Elevation and Section.pdf24 Sep 2025
Building plan approvalFile: BP LAYOUT PLAN 07-07 Sections.pdf24 Sep 2025

How this compares with Pune

7%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Platinum One on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mundhwa South13,700+ in Pune

2 kmPlatinum OneCompleted 30Lapsed / revoked 16Other 102Dot size: filed unitsN

Filed coordinates, straight-line distance. 148 registered projects within 2 km.

Builder: A Advani Promoters & Developers LLP

A Advani Promoters & Developers LLP has 1 registration on MahaRERA, including Platinum One. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Platinum One is delayed beyond 30 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Platinum One?

The registered promoter entity is A Advani Promoters & Developers LLP, a limited liability partnership as per the filing. Its LLPIN ACE-8613 and GSTIN 27ACEFA4066C1ZQ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Platinum One?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Platinum One?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Platinum One?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Platinum One?

The professionals named in the filing: Architect: Crystal Landmark LLP; Engineer: JW Consultants LLp; Engineer: Nexus Consultants & Engineers; Engineer: SK Consultants & Engineers; Chartered Accountant: N B Sayed & Associates; Chartered Accountant: SPCM & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Platinum One?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Platinum One. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Platinum One to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.