Home / Browse projects / Mumbai Suburban, Maharashtra / PLATINUM LIFE
PLATINUM LIFE
By SAMUDRA DARSHAN GRUHPRAVESH LLP
RG-MH-99419 · RERA P51800014518 · Last updated on MahaRERA portal: 9 Oct 2024
Source: official MahaRERA filing
Red flags
- Litigation declared, 15 cases
- 13 complaints at MahaRERA
- Rs 200.00 crore secured on the land, in favour of Kautilya Real Estate Fund
Clear
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PLATINUM LIFE is a Others project by SAMUDRA DARSHAN GRUHPRAVESH LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800014518 on 8 Dec 2017. The registration is recorded completed; possession was promised by 30 Dec 2025. 13 complaints are on record with the regulator.
At a glance
Project
- NamePLATINUM LIFE
- TypeOthers
- Location
- D N NAGAR
- ANDHERI WEST
- Andheri
- Mumbai Suburban
- 400053
- Pincode400053
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800014518
- ReraGenie IDRG-MH-99419
Builder
- NameSAMUDRA DARSHAN GRUHPRAVESH LLP
- Entity typeOthers
- Named personsVISHAL NAVIN RATANGHAYRA, GURMINDER SINGH SEERA, MT DEVELOPMENT LLP, PLATICONS REALTY LLP, PLATINUM INFRADEVELOPMENT PRIVATE LIMITED, SAURABH DIPAK SANGHVI
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on8 Dec 2017
- Promised completion30 Dec 2025
- Revised completionNone
- Buildings3 building records
- Documents filed77 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PLATINUM LIFE A - WING | NA | 19 | 0 | 0 | 0 | 0 |
| PLATINUM LIFE B - WING AND C - WING | NA | 20 | 0 | 0 | 0 | 0 |
| PLATINUM LIFE D - WING AND E - WING | NA | 19 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building3
As on 9 Oct 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
27 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Installation of Lifts, at 98%.
PLATINUM LIFE A - WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 97% |
PLATINUM LIFE B - WING AND C - WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 97% |
PLATINUM LIFE D - WING AND E - WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 98% |
Progress on shared amenities15
As on 9 Oct 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed448
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| PLATINUM LIFE A - WING | 88 | 88 |
| PLATINUM LIFE B - WING AND C - WING | 177 | 177 |
| PLATINUM LIFE D - WING AND E - WING | 183 | 183 |
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Partner | Role in project |
|---|---|
| SAMUDRA DARSHAN GRUHPRAVESH LLP | - |
Litigation declared15
| Case | Court | Status |
|---|---|---|
| S C SUIT NO 2493 OF 2015/2015 | CITY CIVIL COURT DINDOSHI | Ongoing |
| S C SUIT NO 2494 OF 2015/2015 | CITY CIVIL COURT DINDOSHI | Ongoing |
| S C SUIT NO 2495 OF 2015/2015 | CITY CIVIL COURT DINDOSHI | Ongoing |
| S C SUIT NO 2726 OF 2015/2015 | CITY CIVIL COURT DINDOSHI | Ongoing |
| SUIT NO 478 OF 2016/2016 | HIGH COURT BOMBAY | Ongoing |
| SUIT NO 820 OF 2016/2016 | HIGH COURT BOMBAY | Ongoing |
| SUIT NO 595 OF 2016/2016 | HIGH COURT BOMBAY | Ongoing |
| SUIT NO 785 OF 2016/2016 | HIGH COURT BOMBAY | Ongoing |
| SUIT NO 790 OF 2016/2016 | HIGH COURT BOMBAY | Ongoing |
| SUIT NO 793 OF 2016/2016 | HIGH COURT BOMBAY | Ongoing |
| SUIT NO 674 OF 2016/2016 | HIGH COURT BOMBAY | Ongoing |
| CONSUMER COMPLAINT NO 293 OF 2015/2015 | STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAI | Ongoing |
| CONSUMER COMPLAINT NO 220 OF 2016/2016 | STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAI | Ongoing |
| CONSUMER COMPLAINT NO 221 OF 2016/2016 | STATE CONSUMER DISPUTES REDRESSAL COMMISSION MUMBAI | Ongoing |
| 2493/2015 | CITY CIVIL COURT DINDOSHI | Ongoing |
Complaints filed with MahaRERA13
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000171798 | Samudra Darshan Co-operative Housing Society Ltd. | Peter Almeida & Mrs. Tangerine Almeida | 07/12/2019 |
| CC006000000055575 | Peter Almeida | Shubh Enterprises | 31/07/2018 |
| CC006000000057618 | Ronnie P Mendonca | Samudhra Dharshan Gruhpravesh LLP | 22/01/2019 |
| CC006000000057778 | Bharat Bhandari | Samudhra Darshan Gruhpravesh llp | 30/01/2019 |
| CC006000000057939 | Mr Sandeep N Valecha and Ms Kavita S Jaisinghani | Shub Enterprises and Samudra Darshan Gruhpravesh LLP | 03/02/2019 |
| CC006000000197301 | Yatish Borse | M/s Shubh Enterprises & Ors | 19/06/2021 |
| CC006000000198587 | BINDU MUKUND NINAWE | SAMUDRA DARSHAN GRUHPRAVESH LLP | 10/12/2021 |
| CC006000000198593 | SACHIN R VARGANTWAR (Acting through his constituted attorney Mr. Rashmikant Vargantwar) | SAMUDRA DARSHAN GRUHPRAVESH LLP | 11/12/2021 |
| CC006000000198597 | IRSHAD JAVID KHANCHEY(acting through constituted attorney Mrs. Asma Irshad Kanchey) | SAMUDRA DARSHAN GRUHPRAVESH LLP | 10/12/2021 |
| CC006000000199210 | SURESH DAHYABHAI SHAH | SAMUDRA DARSHAN GRUHPRAVESH LLP | 07/12/2021 |
| CC006000000303333 | Samudra Darshan Gruhpravesh LLP | Mrs Aradhana Tiwari | 03/01/2023 |
| CC006000000333975 | SEEMA RAVI THAKUR | SHREE SHUBH ENTERPRISES | 17/01/2023 |
| CC006000000375227 | RENU TANWAR SACHDEV | Platinumcorp Realty Developers Private Limited | 18/04/2023 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Dec 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 2 Dec 2017 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Apr 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 15 Nov 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 Oct 2024
Documents filed77
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Full OC 16092024.pdf | 9 Oct 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full OCC SD 03092024.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory SD June 2024.pdf | 7 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure SDLLP 21092024.pdf | 7 Oct 2024 |
| Other - TechnicalFile: Form 4 Full OC 16092024.pdf | 7 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Signed Form 5 _Samudra Darshan Gruhpravesh LLP - DSC Signed.pdf | 7 Oct 2024 |
| Form 5 (FY 2023-2024)File: Signed Form 5 _Samudra Darshan Gruhpravesh LLP - DSC Signed.pdf | 30 Sep 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SD June 2024.pdf | 16 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SD June 2024.pdf | 16 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance SD Mar 2024.pdf | 16 Jul 2024 |
| Certificates of CA (Form 3)File: Form 3 SD June 2024.pdf | 16 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure SD Mar 2023.pdf | 23 Apr 2024 |
| Certificates of CA (Form 3)File: Form 3 SD Mar 2024.pdf | 23 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SD Mar 2024.pdf | 19 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SD Dec 2023.pdf | 18 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SD Dec 2023.pdf | 18 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Inventory Platinum Life Dec 2023.pdf | 18 Jan 2024 |
| Certificates of CA (Form 3)File: Form 3 SD Dec 2023.pdf | 18 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 SD Sept 2023.pdf | 20 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 SD Sept 2023.pdf | 20 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Samudra Darshan Gruhpravesh LLP Sept 2023.pdf | 20 Oct 2023 |
| Certificates of CA (Form 3)File: Form 3 SD Sept 2023.pdf | 20 Oct 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 Samudra Darshan Gruhpravesh LLP 31032023.pdf | 29 Sep 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OC B C Wings 09082023.pdf | 10 Aug 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SD Architect Certificate March 2019.pdf | 6 May 2023 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: 3 OC 19042023 SD.pdf | 20 Apr 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Samudra Darshan Gruhpravesh LLP 31122022.pdf | 19 Apr 2023 |
| Details of encumbrancesFile: Encumbrance Certificate_PIPL_23012023.pdf | 24 Jan 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: SD - Society Registration Certificate 15-04-1969.pdf | 20 Dec 2022 |
| Declaration about Commencement CertificateFile: SD Declaration of CC.pdf | 22 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 2 Further CC Full Potential 14112022 SD.pdf | 15 Nov 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Samudra Darshan Gruhpravesh LLP 31032022.pdf | 2 Nov 2022 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure PL.pdf | 28 Oct 2022 |
| Disclosure of sold/ booked inventoryFile: SD Disclosure of Sold Unsold 30062022.pdf | 25 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Cert Rera A to G 31122021.pdf | 15 Jul 2022 |
| Declaration about Commencement CertificateFile: Declaration about Commencement SD 06042022.pdf | 11 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: SD Sold Booked Inventory Mar 2022.pdf | 11 Apr 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: 10 - Further CC SD D Wing Upto Top of 12th Flr.pdf | 6 Apr 2022 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold Declaration.pdf | 21 Mar 2022 |
| Details of encumbrancesFile: Encumbrance Samudra Darshan Nov 2021.pdf | 16 Nov 2021 |
| Declaration about Commencement CertificateFile: SD - Declaration - Commencement Certificate.pdf | 13 Oct 2021 |
| Disclosure of sold/ booked inventoryFile: SD - Declaration - Sold - Booked Inventory.pdf | 13 Oct 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Samudra Darshan Gruhpravesh LLP - SIGNED.pdf | 24 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: SD Disclosure June 2021.pdf | 21 Sep 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 18 Sep 2021 |
| Declaration about Commencement CertificateFile: Declaration about Commencement - Form D.pdf | 18 Sep 2021 |
| Details of encumbrancesFile: Encumbrance Certificate-Samudra Darshan-31082021.pdf | 31 Aug 2021 |
| Building plan approvalFile: IOD Full - SD - 2.pdf | 5 Apr 2021 |
| Building Plan Approval (IOD)File: IOD Full - SD - 2.pdf | 5 Apr 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Samudra Darshan CHSL Further CC.pdf | 8 Jan 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Samudra Darshan Gruhpravesh LLP.pdf | 31 Oct 2020 |
| Details of encumbrancesFile: Samudra Darshan_Encumbrance Certificate_11082020.pdf | 12 Aug 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Non Applicability of Form 2A - Samudra.pdf | 11 Jul 2020 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form 5 - Samudra Darshan Gruhpravesh LLP.pdf | 11 Jul 2020 |
| Details of Restarting of Construction work post lockdownFile: Issue letter-Samudradarshan.pdf | 9 Jul 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: Samudra Darshan Further CC.pdf | 26 Dec 2019 |
| Certificates of CA (Form 5)File: Form 5 - Samudra Darshan Gruhpravesh LLP.pdf | 30 Sep 2019 |
| Building plan approvalFile: Samudra Darshan IOD.pdf | 8 Jul 2019 |
| Building Plan Approval (IOD)File: Samudra Darshan IOD.pdf | 8 Jul 2019 |
| Proforma of Allotment letterFile: AFS-RERA.pdf | 29 Nov 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: Plinth CC_ SD.pdf | 3 Nov 2018 |
| Certificates of CA (Form 5)File: Form 5- Samudra Darshan Gruhpravesh LLP.pdf | 30 Sep 2018 |
| Certificates of CA (Form 5)File: Form 5- Samudra Darshan Gruhpravesh LLP.pdf | 22 Sep 2018 |
| Details of encumbrancesFile: Encumbrance Certificate_SD.pdf | 29 Mar 2018 |
| Declaration in FORM BFile: FROM B - AFFIDAVIT.pdf | 3 Dec 2017 |
| Building plan approvalFile: IOD_30_10_2017.pdf | 2 Dec 2017 |
| Layout approvalFile: SAMUDRA DARSHAN CONCESSION PLAN_Part1.pdf | 2 Dec 2017 |
| Layout approvalFile: SAMUDRA DARSHAN CONCESSION PLAN_Part2.pdf | 2 Dec 2017 |
| PAN CardFile: Samudra Darshan PAN card.pdf | 2 Dec 2017 |
| Details of encumbrancesFile: No Encumberance Declaration.pdf | 2 Dec 2017 |
| Copy of Layout Approval (in case of layout)File: SAMUDRA DARSHAN CONCESSION PLAN_Part1.pdf | 2 Dec 2017 |
| Copy of Layout Approval (in case of layout)File: SAMUDRA DARSHAN CONCESSION PLAN_Part2.pdf | 2 Dec 2017 |
| Building Plan Approval (IOD)File: IOD_30_10_2017.pdf | 2 Dec 2017 |
| Certificates of CA (Form 3)File: CA Certificate.pdf | 2 Dec 2017 |
| Proforma of Allotment letterFile: AOS Declaration.pdf | 2 Dec 2017 |
| OtherFile: No Declaration Pin Code.pdf | 2 Dec 2017 |
| Copy of the legal title reportFile: Title Report.pdf | 1 Dec 2017 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 3 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 77 filed documents as one ZIP, foldered, with a manifest
Keep PLATINUM LIFE on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ANDHERI WEST6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 238 registered projects within 2 km.
LIVSMART KURLA
D. K. REALTY (INDIA) PVT. LTD.
MOONGIPA ARCADE
MOONGIPA REALTY PRIVATE LIMITED
LINKBAY RESIDENCES PHASE I
PORTSMOUTH BUILDCON PRIVATE LIMITED
Purva Estrella
Puravankara Ltd
78 LAKE TOWN
ANIRDESH DEVELOPERS PRIVATE LIMITED
Transcon Triumph Tower 2
Transcon Triumph Phase 2 Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: SAMUDRA DARSHAN GRUHPRAVESH LLP
SAMUDRA DARSHAN GRUHPRAVESH LLP has 1 registration on MahaRERA, including PLATINUM LIFE. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if PLATINUM LIFE is delayed beyond 30 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PLATINUM LIFE?
The registered promoter entity is SAMUDRA DARSHAN GRUHPRAVESH LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PLATINUM LIFE?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against PLATINUM LIFE?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for PLATINUM LIFE?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
What should I check before booking in PLATINUM LIFE?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback