Home / Browse projects / Mumbai Suburban, Maharashtra / PLATINUM GRANDEUR
PLATINUM GRANDEUR
By Platinum Strategic Developers LLP
RG-MH-06068 · RERA P51800052098 · Last updated on MahaRERA portal: 12 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
PLATINUM GRANDEUR is a Residential / Group Housing project by Platinum Strategic Developers LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800052098 on 24 Jul 2023. Possession is promised by 31 Dec 2026. 30 of the 42 units on this registration are recorded sold or booked, and 5 of 11 construction stages are filed complete.
At a glance
Project
- NamePLATINUM GRANDEUR
- TypeResidential / Group Housing
- Location
- OFF J P ROAD
- MODEL TOWN
- Ambivali
- Andheri
- Mumbai Suburban
- 400053
- Pincode400053
- RERA no.P51800052098
- ReraGenie IDRG-MH-06068
Builder
- NamePlatinum Strategic Developers LLP
- Entity typeOthers
- Named personsGURMINDER SINGH SEERA, VISHAL NAVINCHANDRA RATANGHAYRA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Jul 2023
- Promised completion31 Dec 2026
- Revised completionNone
- Buildings1 building record
- Documents filed92 files
Current status
Figures as on 12 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| PLATINUM GRANDEUR | NA | 22 | 16 | 42 | 0 | 42 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 12 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
5 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 75%.
PLATINUM GRANDEUR: 52% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 12 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed56
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership1
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| AMOD CO OPERATIVE HOUSING SOCIETY LIMITED | Ambivali | Mumbai Suburban |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| PLATINUM GRANDEUR | NA | Rs 30.00 cr | Rs 19.77 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Aspire Architect & Consultants |
| Engineer | Dinesh H Mehta |
| Engineer | Frames Structure & Design Studio |
| Chartered Accountant | Virendra Agarwal & Associates |
| Chartered Accountant | PUNIT GUPTA |
| Partner | Role in project |
|---|---|
| Platinum Strategic Developers LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Aug 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 16 Jun 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 11 Jul 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 10 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2026
Documents filed92
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 92 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: Form-2A Quality Assurance-Platinum Strategic-31032026.pdf | 12 Jun 2026 |
| Withdrawal Update Form 1File: Form 1 Platinum Strategic Mar 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: Form 2 Platinum Strategic Mar 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: Form 3 Platinum Strategic Mar 2026.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: Form 1 Platinum Strategic Dec 2025.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Platinum Strategic Dec 2025.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Platinum Strategic Dec 2025.pdf | 14 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Platinum Strategic Dec 2025.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Platinum Strategic Dec 2025.pdf | 14 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Platinum Strategic Dec 2025.pdf | 14 Jan 2026 |
| Withdrawal Update Form 1File: Form 1 Platinum Strategic Sep 2025.pdf | 18 Oct 2025 |
| Withdrawal Update Form 2File: Form 2 Platinum Strategic Sep 2025.pdf | 18 Oct 2025 |
| Withdrawal Update Form 3File: Form 3 Platinum Strategic Sep 2025.pdf | 18 Oct 2025 |
| Form 5 (FY 2024-2025)File: RERA Form-5 Strategic Developers-FY 24-25-Final.pdf | 29 Sep 2025 |
| Form 1File: Form 1 Amod Mar 2025.pdf | 22 Jul 2025 |
| Form 2File: Form 2 Platinum Strategic June 2025.pdf | 22 Jul 2025 |
| Form 3File: Form 3 Platinum Strategic June 2025.pdf | 22 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Inventory Disclosure Amod June 2025.pdf | 22 Jul 2025 |
| Form 2A (FY 2024-2025)File: Form 2A Amod.pdf | 30 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amod Mar 2025.pdf | 18 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Amod Mar 2025.pdf | 18 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amod Mar 2025.pdf | 18 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Amod Mar 2025.pdf | 18 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amod Dec 2024.pdf | 18 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Amod Dec 2024.pdf | 18 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amod Dec 2024.pdf | 18 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Amod Dec 2024.pdf | 18 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amod Sept 2024.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Amod Sept 2024.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amod Sept 2024.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Amod Sept 2024.pdf | 19 Oct 2024 |
| Form 5 (FY 2023-2024)File: RERA Form-5 Platinum Strategic Developers LLP.pdf | 30 Sep 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amod CHSL June 2024.pdf | 19 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amod June 2024.pdf | 19 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Amod June 2024.pdf | 19 Jul 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Quality Assurance 31032024 P Strategic Developers LLP.pdf | 16 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Inventory PC Strategic June 2024.pdf | 16 Jul 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: 1 31052024 Amod further CC issued Extented upto 13th Floor.pdf | 10 Jun 2024 |
| Declaration about Commencement CertificateFile: 1 Declaration about CC upto 13th floor.pdf | 10 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amod Mar 2024.pdf | 19 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amod Mar 2024.pdf | 19 Apr 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A Quality Assurance 31032024 P Strategic Developers LLP.pdf | 18 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Grandeur 31032024.pdf | 17 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 P Strategic Developers Mar 2024.pdf | 16 Apr 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amod Dec 2023.pdf | 17 Jan 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amod Dec 2023.pdf | 17 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Inventory Grandeur Dec 2023.pdf | 17 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Amod Dec 2023.pdf | 17 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Amod Sept 2023.pdf | 17 Oct 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Amod Sept 2023.pdf | 17 Oct 2023 |
| Disclosure of sold/ booked inventoryFile: Inventory Disclosure Amod Sept 2023.pdf | 17 Oct 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Amod Sept 2023.pdf | 17 Oct 2023 |
| Copy of the legal title reportFile: 1 Title Report Amod Dt 23082023 by Law Scribes.pdf | 24 Aug 2023 |
| Building plan approvalFile: 4 - IOA - 16-02-2023 12.pdf | 11 Jul 2023 |
| Building plan approvalFile: 5 - IOA - 16-02-2023 13.pdf | 11 Jul 2023 |
| Building plan approvalFile: 5 - IOA - 16-02-2023 13.pdf | 11 Jul 2023 |
| Building plan approvalFile: 6 - IOA - 16-02-2023 14.pdf | 11 Jul 2023 |
| Building plan approvalFile: 7 - IOA - 16-02-2023 16.pdf | 11 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 4 - IOA - 16-02-2023 12.pdf | 11 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 - IOA - 16-02-2023 13.pdf | 11 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 5 - IOA - 16-02-2023 13.pdf | 11 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 6 - IOA - 16-02-2023 14.pdf | 11 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 7 - IOA - 16-02-2023 16.pdf | 11 Jul 2023 |
| Proforma of Agreement for saleFile: AFS RERA - Amod - Platinum - 28-06-2023.pdf | 11 Jul 2023 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report - AFS RERA - 28-06-2023.pdf | 11 Jul 2023 |
| Copy of the legal title reportFile: Title Report of Amod CHSL.pdf | 5 Jul 2023 |
| Building plan approvalFile: 1 - IOA - 16-02-2023 Letter.pdf | 3 Jul 2023 |
| Building plan approvalFile: IOA - 16-02-2023.pdf | 3 Jul 2023 |
| Building plan approvalFile: 3 - IOA - 16-02-2023 15.pdf | 3 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 1 - IOA - 16-02-2023 Letter.pdf | 3 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: IOA - 16-02-2023.pdf | 3 Jul 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: 3 - IOA - 16-02-2023 15.pdf | 3 Jul 2023 |
| CERSAI detailsFile: 1 - CERSAI Letter No Security Charged.pdf | 3 Jul 2023 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 28 Jun 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Platinum Grandeur - 10062023.pdf | 28 Jun 2023 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registratin Certificate _ 27-02-1984.pdf | 28 Jun 2023 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration of Separate Bank Ac.pdf | 28 Jun 2023 |
| Deviation Report with respect to Allotment letterFile: No Deviation in Allotment Letter.pdf | 28 Jun 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A - Disclosure of Interest - VNR.pdf | 27 Jun 2023 |
| Proforma of Allotment letterFile: Allotment Letter (RERA) - 24-06-2023.pdf | 27 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 92 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep PLATINUM GRANDEUR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near MODEL TOWN6,700+ in Mumbai Suburban
LIVSMART KURLA
D. K. REALTY (INDIA) PVT. LTD.
MOONGIPA ARCADE
MOONGIPA REALTY PRIVATE LIMITED
LINKBAY RESIDENCES PHASE I
PORTSMOUTH BUILDCON PRIVATE LIMITED
Purva Estrella
Puravankara Ltd
78 LAKE TOWN
ANIRDESH DEVELOPERS PRIVATE LIMITED
Transcon Triumph Tower 2
Transcon Triumph Phase 2 Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: Platinum Strategic Developers LLP
Platinum Strategic Developers LLP has 1 registration on MahaRERA, including PLATINUM GRANDEUR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if PLATINUM GRANDEUR is delayed beyond 31 Dec 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of PLATINUM GRANDEUR?
The registered promoter entity is Platinum Strategic Developers LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in PLATINUM GRANDEUR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for PLATINUM GRANDEUR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at PLATINUM GRANDEUR?
The professionals named in the filing: Architect: Aspire Architect & Consultants; Engineer: Dinesh H Mehta; Engineer: Frames Structure & Design Studio; Chartered Accountant: Virendra Agarwal & Associates; Chartered Accountant: PUNIT GUPTA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in PLATINUM GRANDEUR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.