Home / Browse projects / Mumbai Suburban, Maharashtra / Piramal Revanta - Tower 6
Piramal Revanta - Tower 6
By PRL Developers Private Limited
RG-MH-30920 · RERA P51800079254 · Last updated on MahaRERA portal: 30 Jun 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Rs 475.00 crore secured on the land, in favour of TATA CAPITAL HOUSING FINANCE LIMITED
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Piramal Revanta - Tower 6 is a Residential / Group Housing project by PRL Developers Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800079254 on 24 Feb 2025. Possession is promised by 30 Jul 2030. 85 of the 308 units on this registration are recorded sold or booked, and 4 of 11 construction stages are filed complete.
At a glance
Project
- NamePiramal Revanta - Tower 6
- TypeResidential / Group Housing
- Location
- Mulund - Goregaon Link Rd.
- Mulund West
- Nahur
- Kurla
- Mumbai Suburban
- 400080
- Pincode400080
- RERA no.P51800079254
- ReraGenie IDRG-MH-30920
Builder
- NamePRL Developers Private Limited
- Entity typeCompany
- CINU45400MH2011PTC216545
- GSTIN27AAFCP9978E1ZT
- DirectorGirish Balkrishan Goenka
- Other registrations5 more →
- Completed4 of 6
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on24 Feb 2025
- Promised completion30 Jul 2030
- Revised completionNone
- Buildings1 building record
- Documents filed80 files
Current status
Figures as on 30 Jun 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing F | NA | 42 | 41 | 308 | 0 | 308 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 49%.
Wing F: 43% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 49% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 19% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed532
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | SP Architect |
| Architect | Mahesh Dalvi |
| Engineer | Gleeds Consulting India Pvt. Ltd. |
| Engineer | Kishor Parmar |
| Chartered Accountant | AKPJ & ASSOCIATES |
| Chartered Accountant | SRBC & CO LLP |
| Chartered Accountant | D. B. KETKAR & CO. |
| Partner | Role in project |
|---|---|
| PRL Developers Private Limited | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 4 Feb 2025 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 21 Jan 2025 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Apr 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 20 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 30 Jul 2030
Documents filed80
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Form 2A (FY 2025-2026)File: 00 Form 2A Revanta T6.pdf | 30 Jun 2026 |
| Withdrawal Update Form 1File: 03 Form 1 - T6 Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: 03 Form 1 - T6 Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: 03 Form 2 - T6 Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 2File: 03 Form 2 - T6 Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: 03 Form 3 - T6.pdf | 20 Apr 2026 |
| Withdrawal Update Form 3File: 03 Form 3 - T6 Mar 26.pdf | 20 Apr 2026 |
| Withdrawal Update Form 1File: 03 Form 1 - T6.pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: 03 Form 2 - T6.pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: 03 Form 3 - T6.pdf | 20 Jan 2026 |
| Withdrawal Update Form 1File: Form 1, T6 - Sept 2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 2File: Form 2, T6 - Sept 2025.pdf | 17 Oct 2025 |
| Withdrawal Update Form 3File: Form 3, T6 - Sept 2025 .pdf | 17 Oct 2025 |
| Withdrawal Update Form 1File: Form 1, T6.pdf | 16 Oct 2025 |
| Withdrawal Update Form 2File: Form 2, T6.pdf | 16 Oct 2025 |
| Withdrawal Update Form 3File: Form 3, T6.pdf | 16 Oct 2025 |
| Form 2A (FY 2024-2025)File: Revanta T6.pdf | 30 Sep 2025 |
| Form 5 (FY 2024-2025)File: T6.pdf | 30 Sep 2025 |
| Commencement certificateFile: Revanta Further CC.pdf | 20 Jul 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_T6.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_T6.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1, T6_17042025171330.PDF | 17 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Unsold T6_17042025172235 .pdf | 17 Apr 2025 |
| Building plan approvalFile: Amend letter_signed.pdf | 3 Apr 2025 |
| Building plan approvalFile: Wing F-1.pdf | 3 Apr 2025 |
| Building plan approvalFile: Wing F-2.pdf | 3 Apr 2025 |
| Building plan approvalFile: Wing F-3_compressed.pdf | 3 Apr 2025 |
| Building plan approvalFile: Common floors-1.pdf | 3 Apr 2025 |
| Building plan approvalFile: Common floors-2.pdf | 3 Apr 2025 |
| Building plan approvalFile: Common floors-3.pdf | 3 Apr 2025 |
| Building plan approvalFile: Common floors-4.pdf | 3 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Amend letter_signed.pdf | 3 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing F-1.pdf | 3 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing F-2.pdf | 3 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Wing F-3_compressed.pdf | 3 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Common floors-1.pdf | 3 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Common floors-2.pdf | 3 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Common floors-3.pdf | 3 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Common floors-4.pdf | 3 Apr 2025 |
| Other - LegalFile: Declaration.pdf | 12 Feb 2025 |
| Other - LegalFile: Regd Deed of Conveyance Part II-compressed.pdf | 12 Feb 2025 |
| Other - LegalFile: Regd Deed of Conveyance Part I-compressed.pdf | 12 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 05 Disclosure of Secured Unsecured Loan I.pdf | 12 Feb 2025 |
| Disclosure for secured/unsecured finance availed for the projectFile: 07 Disclosure of Secured Unsecured Loan II.pdf | 12 Feb 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 09 Disclosure regarding Building Details.pdf | 5 Feb 2025 |
| Copy of the legal title reportFile: 01 Legal Title Report.pdf | 4 Feb 2025 |
| Copy of the legal title reportFile: 02 Letter Legal Title Report.pdf | 4 Feb 2025 |
| Other - LegalFile: 03 Regd Deed of Conveyance.pdf | 4 Feb 2025 |
| Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: 04 Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B). | 4 Feb 2025 |
| Building plan approvalFile: Layout Approval Plans P1.pdf | 21 Jan 2025 |
| Building plan approvalFile: Layout Approval Plans P2.pdf | 21 Jan 2025 |
| Building plan approvalFile: Building Approval Plans.pdf | 21 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout Approval Plans P1.pdf | 21 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout Approval Plans P2.pdf | 21 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Approval Plans.pdf | 21 Jan 2025 |
| Other - LegalFile: PR card 491-A-2 dt29424.pdf | 21 Jan 2025 |
| Proforma of Agreement for saleFile: 13 AFS - Revanta Tower 6.pdf | 21 Jan 2025 |
| Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf | 17 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate.pdf | 16 Jan 2025 |
| Deviation Report with respect to Allotment letterFile: 16 Final Tower 6 Deviation Report - Allotment Letter - 090125.pdf | 13 Jan 2025 |
| Deviation Report with respect to model copy of AgreementFile: 15 Final_T6_Deviation Report - AFS - 090125.pdf | 13 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form - 1.pdf | 9 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf | 9 Jan 2025 |
| Other - LegalFile: Piramal Developers Pvt Ltd - Upload Proof for Authorized Signatory.pdf | 9 Jan 2025 |
| CERSAI detailsFile: CERSAI_Search_Report_200334782363_For_Asset_Based_Search_08_01_2025_18_39_41_014.pdf | 9 Jan 2025 |
| Other - FinanceFile: Piramal Developers Pvt Ltd - Upload Proof for Authorized Signatory.pdf | 9 Jan 2025 |
| Other - TechnicalFile: Piramal Developers Pvt Ltd - Upload Proof for Authorized Signatory.pdf | 9 Jan 2025 |
| Other - TechnicalFile: 21 One plot one registration - Declaration.pdf | 9 Jan 2025 |
| Layout approvalFile: 06 Layout Approval Amend letter_signed_24092024.pdf | 8 Jan 2025 |
| PAN CardFile: 02 PAN CARD_PRL Developers.pdf | 8 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Legal Encumbrances.pdf | 8 Jan 2025 |
| Details of encumbrances concerned to FinanceFile: Finance Encumbrances.pdf | 8 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: 06 Layout Approval Amend letter_signed_24092024.pdf | 8 Jan 2025 |
| Declaration in FORM BFile: Form - B.pdf | 8 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: 07 CC .pdf | 8 Jan 2025 |
| Declaration about Commencement CertificateFile: Format - D, Declaration for CC.pdf | 8 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Format A - Seperate Bank Account.pdf | 8 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Legal Encumbrances.pdf | 8 Jan 2025 |
| Details of encumbrances concerned to LegalFile: Finance Encumbrances.pdf | 8 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: 20 Disclosure of Interest in Other Real Estate Organizations.pdf | 8 Jan 2025 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 5 other registrations, which the RERA portal never shows together
- All 80 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Piramal Revanta - Tower 6 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Mulund West6,700+ in Mumbai Suburban
Eternia Towers A to D
Oberoi Constructions Limited
Bellanza Phase 1 - Wing A, B, C at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Atmosphere O2
Atmosphere Realty Pvt Ltd
Bellanza Phase 2 - Wing D, E, F at The Prestig
PRESTIGE MULUND REALTY PRIVATE LIMITED
Forest Hills Ph 1 at The Prestige City
PRESTIGE MULUND REALTY PRIVATE LIMITED
Kalpataru Elitus
Arimas Real Estate Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: PRL Developers Private Limited
PRL Developers Private Limited has 6 registrations on MahaRERA, including Piramal Revanta - Tower 1 and Piramal Revanta - Tower 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What are my rights if Piramal Revanta - Tower 6 is delayed beyond 30 Jul 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Piramal Revanta - Tower 6?
The registered promoter entity is PRL Developers Private Limited, a company as per the filing. Its CIN U45400MH2011PTC216545 and GSTIN 27AAFCP9978E1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Piramal Revanta - Tower 6?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Piramal Revanta - Tower 6?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Piramal Revanta - Tower 6?
The professionals named in the filing: Architect: SP Architect; Architect: Mahesh Dalvi; Engineer: Gleeds Consulting India Pvt. Ltd.; Engineer: Kishor Parmar; Chartered Accountant: AKPJ & ASSOCIATES; Chartered Accountant: SRBC & CO LLP. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Piramal Revanta - Tower 6?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback