Completed No litigation declared Residential / Group Housing project

Piramal Revanta - Tower 4

By PRL Developers Private Limited

RG-MH-30715 · RERA P51800031310 · Last updated on MahaRERA portal: 30 Jun 2026

Source: official MahaRERA filing

Red flags

  • 3 complaints at MahaRERA
  • Rs 375.00 crore secured on the land, in favour of ICICI BANK

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
0 of 318Units unsoldnot recorded sold or booked
3Complaints at MahaRERAon this registration
Jump to the 149 documents Report an error

Piramal Revanta - Tower 4 is a Residential / Group Housing project by PRL Developers Private Limited in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800031310 on 15 Oct 2021. The registration is recorded completed; possession was promised by 31 Mar 2026. 318 of the 318 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete. 3 complaints are on record with the regulator.

At a glance

Project

  • NamePiramal Revanta - Tower 4
  • TypeResidential / Group Housing
  • Location
    • Mulund Goregaon Link Rd
    • Mulund West
    • Kurla
    • Mumbai Suburban
    • 400080
  • Pincode400080
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800031310
  • ReraGenie IDRG-MH-30715

Builder

  • NamePRL Developers Private Limited
  • Entity typeCompany
  • CINU45400MH2011PTC216545
  • GSTIN27AAFCP9978E1ZT
  • DirectorGirish Balkrishan Goenka
  • Other registrations5 more →
  • Completed4 of 6

Key dates

this monthRegisteredOct 2021PromisedMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Oct 2021
  • Promised completion31 Mar 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed149 files

Current status

100%318 of 318 units booked
84.4%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
RavisaNA45443180318

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

Ravisa: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed250

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots250
Closed/Covered250

Land and ownership

A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area46,890 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared present
Charge in favour ofICICI BANK
Secured amountRs 375.00 crore
CERSAI search filedYes
Declared on30 Sep 2024

Approvals and building plan

Sanctioning authorityBRIHANMUMBAI MUNICIPAL CORPORATION
Permissible FSI18744.0
Proposed, not sanctioned18,744 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchRavindra Natya Mandir Kala Academy Prabhadevi Mumbai 400025
Estimated costRs 172.35 cr
Cost incurredRs 145.46 cr
Work done84.4%
BuildingWingEstimatedIncurred
RavisaNARs 152.62 crRs 133.24 cr
-NARs 19.73 crRs 12.22 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Shikre Associates
EngineerGleeds Consulting India Pvt. Ltd.
EngineerKishor Parmar
Chartered AccountantSRBC & CO LLP
Chartered AccountantD B Ketkar & Co
PartnerRole in project
PRL Developers Private Limited-

Complaints filed with MahaRERA3

Case no.ComplainantRespondentFiled
CC12504391Vaishali Jeetendra GagwaniPRL Developers Private Limited10/12/2025
CC12602071vivek kumar gorakhnath navikPRL Developers Private Limited08/04/2026
CC12603672Chhaya Vijay AdhalePRL Developers Private Limited13/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Sep 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 12 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jul 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed149

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 149 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: 00 Form 2A Revanta T4.pdf30 Jun 2026
Occupational CertificateFile: Piramal Revanta Tower 4 - OC .pdf17 Nov 2025
Withdrawal Update Form 1File: Form 1, T4 - Sept 2025.pdf17 Oct 2025
Withdrawal Update Form 2File: Form 2, T4 - Sept 2025.pdf17 Oct 2025
Withdrawal Update Form 3File: Form 3, T4 - Sept 2025 .pdf17 Oct 2025
Withdrawal Update Form 1File: Form 1, T4.pdf16 Oct 2025
Withdrawal Update Form 1File: Form 1, T4.pdf16 Oct 2025
Withdrawal Update Form 2File: Form 2, T4.pdf16 Oct 2025
Withdrawal Update Form 2File: Form 2, T4.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3, T4.pdf16 Oct 2025
Withdrawal Update Form 3File: Form 3, T4.pdf16 Oct 2025
Form 2A (FY 2024-2025)File: Revanta T4.pdf30 Sep 2025
Form 5 (FY 2024-2025)File: T4.pdf30 Sep 2025
Commencement certificateFile: Revanta Further CC.pdf17 Jul 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_T4.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_T4.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: SSA Architect Certificate_Revanta T4_10042025.pdf17 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1, T4_17042025171144.PDF17 Apr 2025
OtherFile: FSI Concession T4_17042025171926.PDF17 Apr 2025
Disclosure of sold/ booked inventoryFile: -Sold Unsold T4_17042025172511 -compressed.pdf17 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form - 3 Revanta Tower 4 Updated.pdf31 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Revanta T4 Form 1, December'2024.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revanta T4.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Revanta T4 Form 2, December'2024.pdf20 Jan 2025
OtherFile: T4.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Piramal Revanta T4 Sold Unsold Inventory.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revanta_T4_Form 2_June 24.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Piramal Revanta_T4 Form 2, Sept'2024.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Piramal Revanta_T4 Form 1, Sept'2024.pdf18 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Piramal Revanta T4 Form 3, Sept'2024.pdf18 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Piramal Revanta_T4 Form 2A, Sept'2024.pdf18 Oct 2024
OtherFile: 07 Piramal Revanta T4 FSI Declaration.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: 08 Piramal Revanta T4 Sold Unsold Inventory.pdf17 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Tower 4 - PRL Revanta mgt signed.pdf7 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: R_T4_merged.pdf20 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Revanta_T4_Form 2_June 24.pdf19 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Revanta_T4_Form 2_June 24.pdf19 Jul 2024
Disclosure of sold/ booked inventoryFile: Revanta T4.pdf18 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Revanta Tower 4 .pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 3 Engineers Certificate on Quality Assurance (Form 2A FY 2023-24).pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: ENGINEERS CERTIFICATE FORM -2A T4.pdf16 Jul 2024
OtherFile: Revanta_T4_FSI_June 24.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Tower 4_SoldUnsold.pdf4 Jul 2024
OtherFile: Revanta T4_FsiC_June 24.pdf4 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Tower 4 EX.pdf20 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T4 EC.pdf19 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: T4 CA.pdf19 Apr 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: T4 AC.pdf16 Apr 2024
Disclosure of sold/ booked inventoryFile: T4 SOLD UNSOLD.pdf16 Apr 2024
OtherFile: T4 FSI.pdf16 Apr 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T4 EC.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: T4 CA.pdf20 Jan 2024
Details of encumbrancesFile: T4 Encumbrance.pdf19 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: T4 AC.pdf18 Jan 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold T4.pdf18 Jan 2024
OtherFile: FSI T4.pdf16 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: T4 EC.pdf20 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: T4 CA.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: T4 AC.pdf18 Oct 2023
Disclosure of sold/ booked inventoryFile: T4 Sold Unsold.pdf18 Oct 2023
OtherFile: T4 FSI.pdf18 Oct 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Revanta T4 QA.pdf13 Oct 2023
Building plan approvalFile: Revanta IOD letter.pdf12 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: Revanta IOD letter.pdf12 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: CC - Revanta.pdf12 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Revanta Tower 4.pdf29 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revanta T4 EC.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 3 Engineers Certificate on Quality Assurance (Form 2A FY 2021-22) (2).pdf20 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revanta T4.pdf20 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Revanta T4.pdf18 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Revanta T4.pdf14 Jul 2023
OtherFile: Revanta T4.pdf14 Jul 2023
Disclosure of sold/ booked inventoryFile: Revanta T4.pdf13 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revanta T4 Dec22.pdf28 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revanta T4 Jun 22.pdf28 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revanta T4 Sep 22.pdf28 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revanta T4 Dec22.pdf15 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revanta T4 Jun 22.pdf15 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Revanta T4 Sep 22.pdf15 Jun 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Revanta T4 Form2.pdf20 Apr 2023

How this compares with Mumbai Suburban

100%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is completed

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Piramal Revanta - Tower 4 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Mulund West6,700+ in Mumbai Suburban

2 kmPiramal Revanta - Tower Completed 87Lapsed / revoked 58Other 111Dot size: filed unitsN

Filed coordinates, straight-line distance. 256 registered projects within 2 km.

Builder: PRL Developers Private Limited

PRL Developers Private Limited has 6 registrations on MahaRERA, including Piramal Revanta - Tower 1 and Piramal Revanta - Tower 2. Its filings disclose no earlier MahaRERA projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Piramal Revanta - Tower 4 is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Piramal Revanta - Tower 4?

The registered promoter entity is PRL Developers Private Limited, a company as per the filing. Its CIN U45400MH2011PTC216545 and GSTIN 27AAFCP9978E1ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Piramal Revanta - Tower 4?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Piramal Revanta - Tower 4?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Piramal Revanta - Tower 4?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Piramal Revanta - Tower 4?

The professionals named in the filing: Architect: Sandeep Shikre Associates; Engineer: Gleeds Consulting India Pvt. Ltd.; Engineer: Kishor Parmar; Chartered Accountant: SRBC & CO LLP; Chartered Accountant: D B Ketkar & Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Piramal Revanta - Tower 4?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Piramal Revanta - Tower 4. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Piramal Revanta - Tower 4 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.